Loading...
HomeMy WebLinkAboutB15-0250_M001_1442254080.pdfD R F/S F/S 14x12 14ø DUCTWORK LEGEND DESCRIPTION ROUND RECTANGULAR DUCT RISER DUCT DROP 90° ELBOW DN. (NEGATIVE PRESSURE) 90° ELBOW DN. (POSITIVE PRESSURE) 90° ELBOW UP (NEGATIVE PRESSURE) 90° ELBOW UP (POSITIVE PRESSURE) SIZE OR SHAPE TRANSITION ROUND FLEXIBLE DUCT CONNECTION 90° RADIUS ELBOW 90° MITERED ELBOW W/ TURNING VANES 90° STRAIGHT TEE 90° CONICAL TEE 3D PLAN PLAN 3D 45° BRANCH 45° CONICAL BRANCH -- COMBINATION FIRE AND SMOKE DAMPER FIRE DAMPER SMOKE DAMPER OFFSET TO CHANGE ELEVATION D = DROP R=RISE DUCT SIZE TAG: FIRST NUMBER = PLAN WIDTH MANUAL BALANCING DAMPER MOTORIZED DAMPER BACKDRAFT DAMPER - - AAV AIR ADMITTANCE VALVE AFF ABOVE FINISHED FLOOR AFG ABOVE FINISHED GRADE AUTO AUTOMATIC ABV ABOVE BCS BUILDING CONTROL SYSTEM BDD BACK DRAFT DAMPER BLDG BUILDING BFG BELOW FINISHED GRADE BOP BOTTOM OF PIPE FROM FINISHED FLOOR B/N BETWEEN C COMMON CA COMBUSTION AIR CC CONTROLS CONTRACTOR CFM CUBIC FEET PER MINUTE (AIR FLOW RATE) CIP CAST IN PLACE CLG CEILING (OR COOLING) CONC CONCRETE COND CONDENSATE CONN CONNECT (OR CONNECTION) CONTR'R BUILDING CO CLEANOUT COTG CLEANOUT TO GRADE CW DOMESTIC WATER DN DOWN (E) EXISTING EAT ENTERING AIR TEMPERATURE EC ELECTRICAL CONTRACTOR EXH EXHAUST EWT ENTERING WATER TEMPERATURE EA EXHAUST AIR PLAN ABBREVIATIONS PIPING DESIGNATIONS HYDRONIC PIPING CS CONDENSATE SUPPLY CR CHS CONDENSER RETURN CHILLED WATER SUPPLY CHS CHILLED WATER SUPPLY CCS CLOSED CONDENSER SUPPLY CCR CLOSED CONDENSER RETURN GLS GEOTHERMAL (OR GROUND) LOOP SUPPLY GLR GEOTHERMAL (OR GROUND) LOOP RETURN HWS HEATING WATER SUPPLY HWR HEATING WATER RETURN HWS(LT) HEATING WATER SUPPLY (LOW TEMP) GF GLYCOL FEED HWR(LT) HEATING WATER RETURN (LOW TEMP) HWS(HT) HEATING WATER SUPPLY (HIGH TEMP) HWR(HT) HEATING WATER RETURN (HIGH TEMP) HWS(HP) HEATING WATER SUPPLY (HEAT PUMP) HWR(HP) HEATING WATER RETURN (HEAT PUMP) SHWS SOLAR HEATING WATER SUPPLY SHWR SOLAR HEATING WATER RETURN SMS SNOWMELT SUPPLY SMR SNOWMELT RETURN FCS FLOOR COOLING SUPPLY FCR FLOOR COOLING RETURN RFS RADIANT FLOOR SUPPLY RFR RADIANT FLOOR RETURN STEAM & CONDENSATE PIPING HPS HIGH PRESURE STEAM SUPPLY HPR LPS HIGH PRESURE CONDENSATE RETURN LOW PRESURE STEAM SUPPLY LPR LOW PRESURE STEAM RETURN MPS MEDIUM PRESURE STEAM SUPPLY MPR MEDIUM PRESURE STEAM RETURN PC PUMPED CONDENSATE PLUMBING PIPING G NATURAL GAS MG FOS MEDIUM PRESSURE GAS FUEL OIL SUPPLY FOR FUEL OIL RETURN FOV FUEL OIL VENT FOF FUEL OIL FILL RS REFRIGERANT SUCTION PG PROPANE GAS LPG LIQUID PROPANE GAS PD PROPANE DRAIN D DRAIN PIPE RL REFRIGERANT LIQUID DOMESTIC COLD WATER (CW) DOMESTIC HOT WATER (HW) HOT WATER RECIRCULATION (HWC) NON-SOFTENED DOMESTIC WATER NS FIRE LINE F COMPRESSED AIR CA PW PUMPED WASTE W WASTE VENT V ACID WASTE AW ACID VENT AV GREASE WASTE GW GREASE VENT GV STORM DRAIN ST STORM DRAIN OVERFLOW ST(OF) SECONDARY DRAIN SD SAND AND OIL WASTE SO N2O NITROUS OXIDE N2 NITROGEN INSTRUMENT AIR IA MEDICAL AIR MA OXGEN O2 VACUUM VAC CARBON DIOXIDE CO2 WASTE ANESTHETIC GAS DISPOSAL WAGD BDD BDD FIXTURE CONNECTION SCHEDULE WC WATER CLOSET (FLUSH VALVE) ABBREV. - HW 1" CW 4" WASTE 2" VENT NOTES: 1. 2. 3. 4. 5. 6. 7. 8. 9. WATER CLOSET (FLUSH TANK) URINAL (BLOWOUT) URINAL (WASHDOWN) URINAL (WATERLESS) LAVATORY HAND SINK SERVICE SINK MOP SERVICE BASIN DRINKING FOUNTAIN / E.W.C. KITCHEN SINK W/ OR W/O DISPOSER BATHTUB / SHOWER CLOTHES WASHER ROUGH-IN DISH MACHINE ROUGH-IN DISHWASHER ROUGH-IN BAR SINK FLOOR SINK FLOOR DRAIN TROUGH DRAIN WORK SINK HOSE BIB WCT - 1/2" 4" 2" UR 1" 2" 1-1/2" UR 3/4" 2" 1-1/2" UR - 2" 1-1/2" LAV 1/2" 1-1/2" 1-1/2" HS 1-1/2" 1-1/2" SS 3" 2" MSB 3/4" 3" 2" DF - 1/2" KS 1/2" 1/2" 2" SH 3/4" 3/4" 2" CW 1/2" 1/2" 2" DM DW BS FS FD TD WS HB - - - 1/2" 1/2" 1/2" 3/4" 1/2" 1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 1-1/2" -1/2" 1/2" 1/2" 3/4" 3/4" 2" 1-1/2" 2" 1-1/2" 1-1/2" 1-1/2" - - - - - - --- 3/4" 3/4" 3/4" 3" 3" 2" 2" 2" 2" 1-1/2" 1-1/2" SIZES SHOWN ARE MINIMUM PIPE SIZES TO A SINGLE FIXTURE. LARGER SIZES MAY BE INDICATED ON PLANS WHERE REQUIRED. MINIMUM DOMESTIC PIPE SIZE TO 2 OR MORE FIXTURES IS 3/4". RE: MANUFACTURER'S INSTALLATION INSTRUCTIONS FOR INDIRECT WASTE SIZES. WASTE AND VENT SIZES SHOWN ABOVE APPLY TO INDIVIDUAL VENTING ONLY. WHERE ALLOWED, INDIVIDUAL VENT CONNECTIONS MAY BE OMITTED OR SIZES MAY VARY WHEN CIRCUIT VENTS, COMMON VENTS, WASTE STACK VENTS, WET VENTS, OR COMBINATION DRAIN AND VENT SYSTEMS ARE USED. PRIOR APPROVAL FROM THE ENGINEER IS REQUIRED TO USE THESE ALTERNATIVE VENTING METHODS. PROVIDE TRAP PRIMER FOR ALL FLOOR DRAINS AND FLOOR SINKS NOT LOCATED IN FOOD SERVICE AREAS. MINIMUM SIZE FOR WASTE AND VENT PIPING BENEATH SLAB IS 2". ALL FIXTURES LISTED ARE NOT NECESSARILY USED ON THIS PROJECT. REFER TO APPLIANCE SCHEDULES (BY OTHERS) FOR ADDITIONAL PLUMBING FIXTURE CONNECTIONS SUCH AS INST-HOTS, COFFEE MAKERS, AND GARBAGE DISPOSALS. PROVIDE ICE MAKER BOX ROUGH IN W/ 1/2"CW CONNECTION FOR ALL REFRIGERATOR LOCATIONS. - PLAN SYMBOLS CONTROL PANEL/RADIANT MANIFOLD T - - - P - -- S H CO P EPO CO2 SP CARBON DIOXIDE SENSOR CARBON MONOXIDE SENSOR FIRE RISER DIAGRAM CONTINUATION REFERENCE PLUMBING RISER HEATING WATER RISER THERMOSTAT HVAC RISER POINT OF NEW CONNECTION DUCT STATIC PRESSURE SENSOR ROOM PRESSURE SENSOR HUMIDISTAT REMOTE TEMPERATURE SENSOR EMERGENCY POWER OFF SWITCH ACCESS PANEL SNOWMELT MANIFOLD SECTION CUT LETTER/SHEET SHOWN ON POINT OF DISCONNECTION A 150 12x6 XFR 12x6 TYPE OF AIR DEVICE RE: GRD SCHEDULE. AIR DEVICE DESIGNATION KEY # = AIR QUANTITY (CFM) CA = COMB. AIR OSA = OUTSIDE AIR RET = RETURN EXH = EXHAUST XFR = TRANSFER SIZE (INCHES) OR MINIMUM FREE AREA REQUIRED IN SQUARE FEET INDICATES AIR INLET DEVICE DUCT/PIPE RISER DESIGNATION KEY PIPING: CH - CHILLED WATER DW - DOMESTIC WATER HW - HEATING WATER G - GAS PIPING WV - WASTE AND/OR VENT PR - PIPING RISER (MISC TYPES) ST - STORM DRAIN S2 - SECONDARY STORM DRAIN RISER NUMBER PR 203 REFERENCE SAMPLE RE: B/M400 FFI NOTES 1. 2. FFI = FOR FURTHER INFORMATION FCT = FOR CONTINUATION SHEET NUMBER DRAWING NUMBER OR DIAGRAM LETTER REFER TO: ALL SYMBOLS, ABBREVIATIONS, AND DESIGNATIONS ON LEGEND SHEET ARE NOT NECESSARILY USED ON THIS PROJECT. THIS DRAWING SET CONSISTS OF DATA GENERATED, IN PART, BY OTHER PARTIES. NOT ALL SYMBOLOGIES AND NOTATION CONVENTIONS OCCURRING IN THIS DRAWING SET ARE NECESSARILY DEFINED ON THESE LEGENDS. CONSULT THE ENGINEER IN THE EVENT SYMBOLOGY OR NOTATION INTERPRETATION IS REQUIRED. NOTE: FOR STANDARD MODULE SIZE REGISTERS, SIZE GIVEN IS NECK SIZE. REFER TO GRD SCHEDULE FOR MODULE SIZE. B AIR SIDE: EA - EXHAUST AIR OA - OUTSIDE AIR RA - RETURN AIR SA - SUPPLY AIR FBO FURNISHED BY OWNER FCO FLOOR CLEANOUT FCT FOR CONTINUATION FFI FOR FURTHER INFORMATION GC GENERAL CONTRACTOR GHX GROUND HEAT EXCHANGER GPM GALLONS PER MINUTE (WATER FLOW RATE) HP HORSE POWER HW DOMESTIC HOT WATER LAT LEAVING AIR TEMPERATURE LF LINEAR FOOT LWT LEAVING WATER TEMPERATURE MC MECHANICAL CONTRACTOR MFG MANUFACTURER MOD MOTOR OPERATED DAMPER (N) NEW NC NORMALLY CLOSED NEC NATIONAL ELECTRIC CODE NIC NOT IN CONTRACT NO NORMALLY OPEN KW KILOWATTS OA OUTSIDE AIR OBD OPPOSED BLADE VOLUME DAMPER OC ON CENTER OSA OUTSIDE AIR RA RETURN AIR REQ'D REQUIRED REQ'MTS REQUIREMENTS SA SUPPLY AIR SF SQUARE FOOT (FEET) SP STATIC PRESSURE SS STAINLESS STEEL TA THROW-AWAY (OR TRANSFER AIR) TYP TYPICAL UNO UNLESS OTHERWISE NOTED VTR VENT THROUGH ROOF W/ WITH W/O WITHOUT RE: REFER TO: WCO WALL CLEANOUT XFR TRANSFER UNO UNLESS OTHERWISE NOTED VTR VENT THROUGH ROOF W/ WITH NO NORMALLY OPEN FSD COMBINATION FIRE/SMOKE DAMPER FACP FIRE ALARM CONTROL PANEL FA FREE AREA PERMIT SET Project number Date Drawn by 8/13/2015 2:05:12 PM M001 MECHANICAL LEGENDS HUGHES LOT 3 / 994 PTARMIGAN RD VAIL,CO Hughes Residence 06.29.15 DAL GENERAL NOTES: 1. The Contract Documents are diagrammatic, showing certain physical relationships which must be established within the mechanical work and its interface with all other work. Such establishment is the exclusive responsibility of the Contractor. Drawings shall not be scaled for the purpose of establishing material quantities. MECHANICAL SHEET INDEX #TITLE ISSUE LOG PERMIT - 07.13.15 M001 MECHANICAL LEGENDS √ M002 MECHANICAL SCHEDULES √ M003 MECHANICAL SCHEDULES √ M100 MECHANICAL SITE PLAN √ M101 LEVEL 1 PIPING PLAN √ M102 LEVEL 2 PIPING PLAN √ M103 LEVEL 3 PIPING PLAN √ M201 LEVEL 1 HVAC PLAN √ M202 LEVEL 2 HVAC PLAN √ M203 LEVEL 3 HVAC PLAN √ M301 LEVEL 1 PLUMBING PLAN √ M302 LEVEL 2 PLUMBING PLAN √ M303 LEVEL 3 PLUMBING PLAN √ M400 ENLARGED MECHANICAL PLANS √ M500 MECHANICAL DIAGRAMS √ M501 MECHANICAL DIAGRAMS √ M502 MECHANICAL DIAGRAMS √ ISSUE LOG KEY: '√ ' ISSUED AS PART OF SET ' ' NOT PART OF SET ' * ' ISSUED FOR INFORMATION ONLY 2. Drawings shall not be scaled for rough-in measurements or used as shop drawings. Where drawings are required for these purposes or have to be made from field measurement, Contractor shall take the necessary measurements and prepare the drawings. 3. The exact location for some items in this specification may not be shown on the drawings. The location of such items may be established by the Engineer during the progress of the work. 4. The contract documents indicate required size and points of terminations of pipes, and suggest proper routes to conform to structure, avoid obstructions and preserve clearances. It is not intended that drawings indicate necessary offsets. The contractor shall make the installation in such a manner as to conform to the structure, avoid obstructions, preserve headroom and keep openings and passageways clear, without further instructions or costs to the Owner. All equipment shall be installed so access is maintained for serviceability. 5. Before any work is installed, determine that equipment will properly fit the space; that required piping grades can be maintained and that ductwork can be run as intended without interferences between systems, structural elements or work of other trades. 6. Verify all dimensions by field measurements. 7. Coordinate installation in chases, slots and openings with all other building components to allow for proper mechanical installations. 8. Sequence, coordinate, and integrate installations of mechanical materials and equipment for efficient flow of the work. Give particular attention to large equipment requiring positioning prior to closing-in the building 9. Where mounting heights are not detailed or dimensioned, install mechanical services and overhead equipment to provide the maximum headroom possible. 10. Install mechanical equipment to facilitate maintenance and repair or replacement of equipment components. As much as practical, connect equipment for ease of disconnecting, with minimum of interference with other installations. 11. Make allowance for expansion and contraction for all building components and piping systems that are subject to such. 12. The ceiling space shall not be "layered". It is the contractor's responsibility to offset and system as required to allow installation within the identified ceiling cavity. The contractor shall include labor and material in the base bid to accommodate such offsets. 13. The Contractor shall provide all labor and material necessary but not limited to the starting/stopping of all mechanical equipment, opening/closing of all valves, draining/refilling all mechanical systems and operating/verifying the operation of all mechanical systems controls as required to accomplish all work necessary to meet construction document requirements. Contractor shall submit records of such activities to engineer and include in the O & M manuals. 14. Coordinate connection of mechanical systems with exterior underground and overhead utilities and services. Comply with requirements of governing regulations, franchised service companies and controlling agencies. Provide required connection for each service. 15. Coordinate the installation of required supporting devices and sleeves to be set in poured in place concrete and other structural components, as they are constructed. 16. All equipment shall conform to the State and/or local Building and Energy Codess. 17. Provide inspection and testing of all systems in accordance to code requirments using proven methods and qualified personenel. Testing includes, but is not limited too - piping pressure testing (gas, water, waste, etc.); backflow prevention; air and water system test and balance; envelope leakage testing via blow door; etc. 1 No. Description Date 1 REV 1 - PERMIT COMMENTS 8.07.2015 09/14/15