DUCTWORK LEGEND
DESCRIPTION
ROUND RECTANGULAR
DUCT RISER
DUCT DROP
90° ELBOW DN.
(NEGATIVE PRESSURE)
90° ELBOW DN.
(POSITIVE PRESSURE)
90° ELBOW UP
(NEGATIVE PRESSURE)
90° ELBOW UP
(POSITIVE PRESSURE)
SIZE OR SHAPE TRANSITION
ROUND FLEXIBLE DUCT
CONNECTION
90° RADIUS ELBOW
90° MITERED ELBOW
W/ TURNING VANES
90° STRAIGHT TEE
90° CONICAL TEE
3D
PLAN PLAN 3D
45° BRANCH
45° CONICAL BRANCH
--
COMBINATION FIRE AND
SMOKE DAMPER
FIRE DAMPER
SMOKE DAMPER
OFFSET TO CHANGE ELEVATION
D = DROP R=RISE
DUCT SIZE TAG:
FIRST NUMBER = PLAN WIDTH
MANUAL BALANCING DAMPER
MOTORIZED DAMPER
BACKDRAFT DAMPER
- -
AAV AIR ADMITTANCE VALVE
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AUTO AUTOMATIC
ABV ABOVE
BCS BUILDING CONTROL SYSTEM
BDD BACK DRAFT DAMPER
BLDG BUILDING
BFG BELOW FINISHED GRADE
BOP BOTTOM OF PIPE FROM FINISHED FLOOR
B/N BETWEEN
C COMMON
CA COMBUSTION AIR
CC CONTROLS CONTRACTOR
CFM CUBIC FEET PER MINUTE (AIR FLOW RATE)
CIP CAST IN PLACE
CLG CEILING (OR COOLING)
CONC CONCRETE
COND CONDENSATE
CONN CONNECT (OR CONNECTION)
CONTR'R BUILDING
CO CLEANOUT
COTG CLEANOUT TO GRADE
CW DOMESTIC WATER
DN DOWN
(E) EXISTING
EAT ENTERING AIR TEMPERATURE
EC ELECTRICAL CONTRACTOR
EXH EXHAUST
EWT ENTERING WATER TEMPERATURE
EA EXHAUST AIR
PLAN ABBREVIATIONS PIPING DESIGNATIONS
HYDRONIC PIPING
CS CONDENSATE SUPPLY
CR
CHS
CONDENSER RETURN
CHILLED WATER SUPPLY
CHS CHILLED WATER SUPPLY
CCS CLOSED CONDENSER SUPPLY
CCR CLOSED CONDENSER RETURN
GLS GEOTHERMAL (OR GROUND) LOOP SUPPLY
GLR GEOTHERMAL (OR GROUND) LOOP RETURN
HWS HEATING WATER SUPPLY
HWR HEATING WATER RETURN
HWS(LT) HEATING WATER SUPPLY (LOW TEMP)
GF GLYCOL FEED
HWR(LT) HEATING WATER RETURN (LOW TEMP)
HWS(HT) HEATING WATER SUPPLY (HIGH TEMP)
HWR(HT) HEATING WATER RETURN (HIGH TEMP)
HWS(HP) HEATING WATER SUPPLY (HEAT PUMP)
HWR(HP) HEATING WATER RETURN (HEAT PUMP)
SHWS SOLAR HEATING WATER SUPPLY
SHWR SOLAR HEATING WATER RETURN
SMS SNOWMELT SUPPLY
SMR SNOWMELT RETURN
FCS FLOOR COOLING SUPPLY
FCR FLOOR COOLING RETURN
RFS RADIANT FLOOR SUPPLY
RFR RADIANT FLOOR RETURN
STEAM & CONDENSATE PIPING
HPS HIGH PRESURE STEAM SUPPLY
HPR
LPS
HIGH PRESURE CONDENSATE RETURN
LOW PRESURE STEAM SUPPLY
LPR LOW PRESURE STEAM RETURN
MPS MEDIUM PRESURE STEAM SUPPLY
MPR MEDIUM PRESURE STEAM RETURN
PC PUMPED CONDENSATE
PLUMBING PIPING
G NATURAL GAS
MG
FOS
MEDIUM PRESSURE GAS
FUEL OIL SUPPLY
FOR FUEL OIL RETURN
FOV FUEL OIL VENT
FOF FUEL OIL FILL
RS REFRIGERANT SUCTION
PG PROPANE GAS
LPG LIQUID PROPANE GAS
PD PROPANE DRAIN
D DRAIN PIPE
RL REFRIGERANT LIQUID
DOMESTIC COLD WATER (CW)
DOMESTIC HOT WATER (HW)
HOT WATER RECIRCULATION (HWC)
NON-SOFTENED DOMESTIC WATER
NS
FIRE LINE
F
COMPRESSED AIR
CA
PW PUMPED WASTE
W WASTE
VENT
V
ACID WASTE
AW
ACID VENT
AV
GREASE WASTE
GW
GREASE VENT
GV
STORM DRAIN
ST
STORM DRAIN OVERFLOW
ST(OF)
SECONDARY DRAIN
SD
SAND AND OIL WASTE
SO
N2O NITROUS OXIDE
N2 NITROGEN
INSTRUMENT AIR
IA
MEDICAL AIR
MA
OXGEN
O2
VACUUM
VAC
CARBON DIOXIDE
CO2
WASTE ANESTHETIC GAS DISPOSAL
WAGD
BDD BDD
FIXTURE CONNECTION SCHEDULE
WC WATER CLOSET (FLUSH VALVE)
ABBREV.
-
HW
1"
CW
4"
WASTE
2"
VENT
NOTES:
1.
2.
3.
4.
5.
6.
7.
8.
9.
WATER CLOSET (FLUSH TANK)
URINAL (BLOWOUT)
URINAL (WASHDOWN)
URINAL (WATERLESS)
LAVATORY
HAND SINK
SERVICE SINK
MOP SERVICE BASIN
DRINKING FOUNTAIN / E.W.C.
KITCHEN SINK W/ OR W/O DISPOSER
BATHTUB / SHOWER
CLOTHES WASHER ROUGH-IN
DISH MACHINE ROUGH-IN
DISHWASHER ROUGH-IN
BAR SINK
FLOOR SINK
FLOOR DRAIN
TROUGH DRAIN
WORK SINK
HOSE BIB
WCT - 1/2" 4" 2"
UR 1" 2" 1-1/2"
UR 3/4" 2" 1-1/2"
UR - 2" 1-1/2"
LAV 1/2" 1-1/2" 1-1/2"
HS 1-1/2" 1-1/2"
SS 3" 2"
MSB 3/4" 3" 2"
DF - 1/2"
KS 1/2" 1/2" 2"
SH 3/4" 3/4" 2"
CW 1/2" 1/2" 2"
DM
DW
BS
FS
FD
TD
WS
HB
-
-
-
1/2"
1/2"
1/2"
3/4"
1/2"
1/2"
1-1/2" 1-1/2"
1-1/2"
1-1/2"
1-1/2"
-1/2"
1/2" 1/2"
3/4" 3/4" 2" 1-1/2"
2" 1-1/2"
1-1/2"
1-1/2"
-
-
-
-
-
-
---
3/4"
3/4"
3/4"
3"
3"
2"
2"
2"
2"
1-1/2"
1-1/2"
SIZES SHOWN ARE MINIMUM PIPE SIZES TO A SINGLE FIXTURE. LARGER SIZES
MAY BE INDICATED ON PLANS WHERE REQUIRED.
MINIMUM DOMESTIC PIPE SIZE TO 2 OR MORE FIXTURES IS 3/4".
RE: MANUFACTURER'S INSTALLATION INSTRUCTIONS FOR INDIRECT WASTE
SIZES.
WASTE AND VENT SIZES SHOWN ABOVE APPLY TO INDIVIDUAL VENTING ONLY.
WHERE ALLOWED, INDIVIDUAL VENT CONNECTIONS MAY BE OMITTED OR SIZES
MAY VARY WHEN CIRCUIT VENTS, COMMON VENTS, WASTE STACK VENTS,
WET VENTS, OR COMBINATION DRAIN AND VENT SYSTEMS ARE USED. PRIOR
APPROVAL FROM THE ENGINEER IS REQUIRED TO USE THESE ALTERNATIVE
VENTING METHODS.
PROVIDE TRAP PRIMER FOR ALL FLOOR DRAINS AND FLOOR SINKS NOT
LOCATED IN FOOD SERVICE AREAS.
MINIMUM SIZE FOR WASTE AND VENT PIPING BENEATH SLAB IS 2".
ALL FIXTURES LISTED ARE NOT NECESSARILY USED ON THIS PROJECT.
REFER TO APPLIANCE SCHEDULES (BY OTHERS) FOR ADDITIONAL PLUMBING
FIXTURE CONNECTIONS SUCH AS INST-HOTS, COFFEE MAKERS, AND GARBAGE
DISPOSALS.
PROVIDE ICE MAKER BOX ROUGH IN W/ 1/2"CW CONNECTION FOR ALL
REFRIGERATOR LOCATIONS.
-
PLAN SYMBOLS
CONTROL PANEL/RADIANT MANIFOLD
T
-
-
-
P
-
--
S
H
CO
P
EPO
CO2
SP
CARBON DIOXIDE SENSOR
CARBON MONOXIDE SENSOR
FIRE RISER
DIAGRAM CONTINUATION REFERENCE
PLUMBING RISER
HEATING WATER RISER
THERMOSTAT
HVAC RISER
POINT OF NEW CONNECTION
DUCT STATIC PRESSURE SENSOR
ROOM PRESSURE SENSOR
HUMIDISTAT
REMOTE TEMPERATURE SENSOR
EMERGENCY POWER OFF SWITCH
ACCESS PANEL
SNOWMELT MANIFOLD
SECTION CUT LETTER/SHEET SHOWN ON
POINT OF DISCONNECTION
A
150
12x6
XFR
12x6
TYPE OF AIR DEVICE
RE: GRD SCHEDULE.
AIR DEVICE
DESIGNATION KEY
# = AIR QUANTITY
(CFM)
CA = COMB. AIR
OSA = OUTSIDE AIR
RET = RETURN
EXH = EXHAUST
XFR = TRANSFER
SIZE (INCHES) OR MINIMUM
FREE AREA REQUIRED IN
SQUARE FEET
INDICATES AIR INLET DEVICE
DUCT/PIPE RISER
DESIGNATION KEY
PIPING:
CH - CHILLED WATER
DW - DOMESTIC WATER
HW - HEATING WATER
G - GAS PIPING
WV - WASTE AND/OR VENT
PR - PIPING RISER (MISC TYPES)
ST - STORM DRAIN
S2 - SECONDARY STORM DRAIN
RISER NUMBER
PR
203
REFERENCE SAMPLE
RE: B/M400 FFI
NOTES
1.
2.
FFI = FOR FURTHER INFORMATION
FCT = FOR CONTINUATION
SHEET NUMBER
DRAWING NUMBER OR
DIAGRAM LETTER
REFER TO:
ALL SYMBOLS, ABBREVIATIONS, AND
DESIGNATIONS ON LEGEND SHEET ARE
NOT NECESSARILY USED ON THIS
PROJECT.
THIS DRAWING SET CONSISTS OF DATA
GENERATED, IN PART, BY OTHER PARTIES.
NOT ALL SYMBOLOGIES AND NOTATION
CONVENTIONS OCCURRING IN THIS
DRAWING SET ARE NECESSARILY DEFINED
ON THESE LEGENDS. CONSULT THE
ENGINEER IN THE EVENT SYMBOLOGY OR
NOTATION INTERPRETATION IS REQUIRED.
NOTE:
FOR STANDARD MODULE SIZE
REGISTERS, SIZE GIVEN IS NECK SIZE.
REFER TO GRD SCHEDULE FOR
MODULE SIZE.
B
AIR SIDE:
EA - EXHAUST AIR
OA - OUTSIDE AIR
RA - RETURN AIR
SA - SUPPLY AIR
FBO FURNISHED BY OWNER
FCO FLOOR CLEANOUT
FCT FOR CONTINUATION
FFI FOR FURTHER INFORMATION
GC GENERAL CONTRACTOR
GHX GROUND HEAT EXCHANGER
GPM GALLONS PER MINUTE (WATER FLOW RATE)
HP HORSE POWER
HW DOMESTIC HOT WATER
LAT LEAVING AIR TEMPERATURE
LF LINEAR FOOT
LWT LEAVING WATER TEMPERATURE
MC MECHANICAL CONTRACTOR
MFG MANUFACTURER
MOD MOTOR OPERATED DAMPER
(N) NEW
NC NORMALLY CLOSED
NEC NATIONAL ELECTRIC CODE
NIC NOT IN CONTRACT
NO NORMALLY OPEN
KW KILOWATTS
OA OUTSIDE AIR
OBD OPPOSED BLADE VOLUME DAMPER
OC ON CENTER
OSA OUTSIDE AIR
RA RETURN AIR
REQ'D REQUIRED
REQ'MTS REQUIREMENTS
SA SUPPLY AIR
SF SQUARE FOOT (FEET)
SP STATIC PRESSURE
SS STAINLESS STEEL
TA THROW-AWAY (OR TRANSFER AIR)
TYP TYPICAL
UNO UNLESS OTHERWISE NOTED
VTR VENT THROUGH ROOF
W/ WITH
W/O WITHOUT
RE: REFER TO:
WCO WALL CLEANOUT
XFR TRANSFER
UNO UNLESS OTHERWISE NOTED
VTR VENT THROUGH ROOF
W/ WITH
NO NORMALLY OPEN
FSD COMBINATION FIRE/SMOKE DAMPER
FACP FIRE ALARM CONTROL PANEL
FA FREE AREA
PERMIT SET
Project number
Date
Drawn by
8/13/2015 2:05:12 PM
M001
MECHANICAL LEGENDS
HUGHES
LOT 3 / 994 PTARMIGAN RD
VAIL,CO
Hughes Residence
06.29.15
DAL
GENERAL NOTES:
1. The Contract Documents are diagrammatic, showing certain physical relationships which must be established within the mechanical
work and its interface with all other work. Such establishment is the exclusive responsibility of the Contractor. Drawings shall not be
scaled for the purpose of establishing material quantities.
MECHANICAL SHEET INDEX
#TITLE
ISSUE LOG
PERMIT - 07.13.15
M001 MECHANICAL LEGENDS √
M002 MECHANICAL SCHEDULES √
M003 MECHANICAL SCHEDULES √
M100 MECHANICAL SITE PLAN √
M101 LEVEL 1 PIPING PLAN √
M102 LEVEL 2 PIPING PLAN √
M103 LEVEL 3 PIPING PLAN √
M201 LEVEL 1 HVAC PLAN √
M202 LEVEL 2 HVAC PLAN √
M203 LEVEL 3 HVAC PLAN √
M301 LEVEL 1 PLUMBING PLAN √
M302 LEVEL 2 PLUMBING PLAN √
M303 LEVEL 3 PLUMBING PLAN √
M400 ENLARGED MECHANICAL PLANS √
M500 MECHANICAL DIAGRAMS √
M501 MECHANICAL DIAGRAMS √
M502 MECHANICAL DIAGRAMS √
ISSUE LOG KEY:
'√ ' ISSUED AS PART OF SET
' ' NOT PART OF SET
' * ' ISSUED FOR INFORMATION ONLY
2. Drawings shall not be scaled for rough-in measurements or used as shop drawings. Where drawings are required for these purposes or
have to be made from field measurement, Contractor shall take the necessary measurements and prepare the drawings.
3. The exact location for some items in this specification may not be shown on the drawings. The location of such items may be
established by the Engineer during the progress of the work.
4. The contract documents indicate required size and points of terminations of pipes, and suggest proper routes to conform to structure,
avoid obstructions and preserve clearances. It is not intended that drawings indicate necessary offsets. The contractor shall make the
installation in such a manner as to conform to the structure, avoid obstructions, preserve headroom and keep openings and
passageways clear, without further instructions or costs to the Owner. All equipment shall be installed so access is maintained for
serviceability.
5. Before any work is installed, determine that equipment will properly fit the space; that required piping grades can be maintained and
that ductwork can be run as intended without interferences between systems, structural elements or work of other trades.
6. Verify all dimensions by field measurements.
7. Coordinate installation in chases, slots and openings with all other building components to allow for proper mechanical installations.
8. Sequence, coordinate, and integrate installations of mechanical materials and equipment for efficient flow of the work. Give particular
attention to large equipment requiring positioning prior to closing-in the building
9. Where mounting heights are not detailed or dimensioned, install mechanical services and overhead equipment to provide the
maximum headroom possible.
10. Install mechanical equipment to facilitate maintenance and repair or replacement of equipment components. As much as practical,
connect equipment for ease of disconnecting, with minimum of interference with other installations.
11. Make allowance for expansion and contraction for all building components and piping systems that are subject to such.
12. The ceiling space shall not be "layered". It is the contractor's responsibility to offset and system as required to allow installation within the
identified ceiling cavity. The contractor shall include labor and material in the base bid to accommodate such offsets.
13. The Contractor shall provide all labor and material necessary but not limited to the starting/stopping of all mechanical equipment,
opening/closing of all valves, draining/refilling all mechanical systems and operating/verifying the operation of all mechanical systems
controls as required to accomplish all work necessary to meet construction document requirements. Contractor shall submit records of
such activities to engineer and include in the O & M manuals.
14. Coordinate connection of mechanical systems with exterior underground and overhead utilities and services. Comply with requirements
of governing regulations, franchised service companies and controlling agencies. Provide required connection for each service.
15. Coordinate the installation of required supporting devices and sleeves to be set in poured in place concrete and other structural
components, as they are constructed.
16. All equipment shall conform to the State and/or local Building and Energy Codess.
17. Provide inspection and testing of all systems in accordance to code requirments using proven methods and qualified personenel.
Testing includes, but is not limited too - piping pressure testing (gas, water, waste, etc.); backflow prevention; air and water system test
and balance; envelope leakage testing via blow door; etc.