Loading...
HomeMy WebLinkAboutB15-0250_M102_1442254080.pdfDN DN DN T T T T T T RZ2-2a RZ2-2b RZ2-1 RZ2-3 RZ2-4 RZ2-5 5 6 2 7 3 4 A B C G H K L M E D J F RM2-1 RM2-2a RM2-3 RM2-5 RM2-4 RM2-5 NOT FOR CONSTRUCTION Project number Date Drawn by 7/5/2015 6:40:41 PM M102 LEVEL 2 PIPING PLAN HUGHES-1 LOT 3 / 994 PTARMIGAN RD VAIL,CO Hughes Residence 06.29.15 DAL No. Description Date 1/4" = 1'-0" 1 LEVEL 2 PIPING PLAN RE: _/M_ FOR RADIANT/SNOWMELT MANIFOLD PIPING. RE: _/M_ FOR ZONE HEATING COIL ASSEMBLIES. RE: _/M_ FOR CUH & UH PIPING. COORDINATE ROUTING OF CONDENSATE DRAIN LINES WITH ARCHITECT PRIOR TO INSTALLATION. PIPING ON EXTERIOR WALLS OR PRE- CAST CONCRETE WALLS TO BE ROUTED IN FRAMED WALL ON INTERIOR SIDE OF INSULATION. AVOID ROUTING PIPING OVER ELECTRICAL ROOMS OR ELECTRICAL PANELS; MAINTAIN N.E.C. CLEARANCES. COORDINATE ROUTINGS WITH ELECTRICAL CONTRACTOR. CONTRACTOR TO MAINTAIN 8'-6" CLEAR HEAD HEIGHT IN GARAGE AND INFORM THE ENGINEER AND ARCHITECT OF ANY AREAS THAT MAY NOT MEET 8'-6" PRIOR TO INSTALLATION, MINIMUM 8'-2" CLEAR HEAD HEIGHT MUST BE MAINTAINED IN ACCESSIBLE VAN AREAS. PROVIDE FLEXIBLE PIPE CONNECTIONS TO ALL MOTORIZED EQUIPMENT. VERIFY ALL EQUIPMENT ACCESS PANELS WITH MANUFACTURER AND ARCHITECT. PROTECT PIPING ROUTED ALONG COLUMNS, WALLS, ETC. FROM DAMAGE AS NECESSARY WITH CAGES. COORDINATE WITH ARCHITECT. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED. ALL BRANCH HEATING WATER PIPE TO VAV BOXES ARE 3/4" PIPE, UNO ALL BRANCH HEATING WATER PIPING TO CABINET UNIT HEATERS AND UNIT HEATERS SHALL BE 3/4" U.N.O. ALL BRANCH CHILLED AND HEATING WATER PIPING TO FAN COIL UNITS SHALL BE 3/4" UNO ALL VALVES SHALL BE INSTALLED ABOVE DROP-IN CEILINGS IN ACCESSIBLE LOCATIONS, OR WITH ACCESS PANELS IN HARD-LID CEILINGS. ALL PIPING SHALL BE ROUTED AS HIGH AS POSSIBLE IN THE CEILING SPACE. UTILIZE JOIST SPACE WHEN POSSIBLE, ESPECIALLY WHERE CROSSING OTHER PIPES, DUCTS, AND ELECTRICAL. ACCESS PANELS SHALL BE 24x24, UNO LOCATIONS SHOWN ARE APPROXIMATE, EXACT LOCATIONS SHALL BE COORDINATED WITH THE ARCHITECTS DRAWINGS AND WITH THE LOCATIONS OF THE EQUIPMENT OR APPARATUS THAT THEY SERVE. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. NOTES: PERMIT SET 09/14/15