Loading...
HomeMy WebLinkAboutB15-0250_M201_1442254080.pdfUP UP EXH EXH EXH EF-2 DB-1 5 6 2 7 3 4 A B C G H K L M E D J F EF -2 EF -2 EF -1 EF -1 EF -1 B -1a B -1b WH-1a WH-1b (2) 4"ø BOILER EXH UP. CH -1 ST -1 ET -1 EF -3 EF -3 8ø 10"ø EXH UP. 3'-0" MIN. EF -1 3'-0" MIN. 3'-0" MIN. NOT FOR CONSTRUCTION Project number Date Drawn by 7/5/2015 6:40:50 PM M201 LEVEL 1 HVAC PLAN HUGHES-1 LOT 3 / 994 PTARMIGAN RD VAIL,CO Hughes Residence 06.29.15 DAL 1/4" = 1'-0" 1 LEVEL 1 HVAC PLAN No. Description Date RE: _/M_ FOR FIRE AND FIRE/SMOKE DAMPER ASSEMBLY. RE: _/M_ FOR TYPICAL DIFFUSER CONNECTION. RE: _M/_ FOR FAN COIL UNIT INSTALLATION. RE: _/M_ FOR VERTICAL FAN COIL UNIT INSTALLATION. RE: _/M_ FOR ROUND DUCT TAKE-OFF DIAGRAM. RE: _/M_ FOR 45° DUCT TAKE-OFF DIAGRAM. COORDINATE ROUTING OF CONDENSATE DRAIN LINES WITH ARCHITECT PRIOR TO INSTALLATION. CEILING COORDINATION OF ALL MEP SYSTEMS (LIGHTING, DUCTWORK, DIFFUSERS, ELECTRICAL, FIRE PROTECTION, ETC.) MUST BE COMPLETED BY THE CONTRACTOR PRIOR TO THE START OF ANY INSTALLATIONS. AVOID ROUTING DUCTWORK OVER ELECTRICAL ROOMS OR ELECTRICAL PANELS; MAINTAIN N.E.C. CLEARANCES. COORDINATE ROUTINGS WITH ELECTRICAL CONTRACTOR. CONTRACTOR TO MAINTAIN 8'-6" CLEAR HEAD HEIGHT IN GARAGE AND INFORM THE ENGINEER AND ARCHITECT OF ANY AREAS THAT MAY NOT MEET 8'-6" PRIOR TO INSTALLATION, MINIMUM 8'-2" CLEAR HEAD HEIGHT MUST BE MAINTAINED IN ACCESSIBLE VAN AREAS. PROVIDE FLEXIBLE DUCT AND PIPE CONNECTIONS TO ALL MOTORIZED EQUIPMENT. VERIFY ALL EQUIPMENT ACCESS PANELS WITH MANUFACTURER AND ARCHITECT. ALL SOURCES OF IGNITION ON MECHANICAL EQUIPMENT SHALL BE MOUNTED 18" AFF. PROTECT PIPING ROUTED ALONG COLUMNS, WALLS, ETC. FROM DAMAGE AS NECESSARY WITH CAGES. COORDINATE WITH ARCHITECT. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED. ALL RETURN AIR GRILLES SHALL BE PROVIDED WITH SOUND BOOT. RE: _/M_ FOR INSTALLATION. THE SPACE ABOVE CEILING IS BEING UTILIZED AS A RETURN AIR PLENUM. ALL RETURN GRILLES SHALL BE PROVIDED WITH SOUND BOOTS AND A DIRECT PATH TO THE AIR HANDLING SYSTEM RETURN DUCT, OPEN TO PLENUM. WHERE FULL HEIGHT WALLS ARE INSTALLED AND THE RETURN AIR PATH IS COMPROMISED, THE SOUND BOOT SHALL EXTEND THROUGH THE WALL OR TRANSFER AIR DUCTS SHALL BE PROVIDED. T-STATS AND CO2 SENSORS SHALL BE LOCATED NEAR THE LIGHT SWITCH WITHIN THE ROOM SHOWN. COORDINATE WITH ARCHITECT & ELECTRICAL ENGINEER TO MATCH HEIGHT AND LOCATION. ALL DUCTWORK SHALL BE ROUTED AS HIGH AS POSSIBLE IN THE CEILING SPACE. UTILIZE JOIST SPACE WHEN POSSIBLE, ESPECIALLY WHERE CROSSING OTHER DUCTS, PIPES, AND ELECTRICAL. ACCESS PANELS SHALL BE 24x24, UNOP LOCATIONS SHOWN ARE APPROXIMATE, EXACT LOCATIONS SHALL BE COORDINATED WITH THE ARCHITECTS DRAWINGS AND WITH THE LOCATIONS OF THE EQUIPMENT OR APPARATUS THAT THEY SERVE. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. NOTES: PERMIT SET 09/14/15