HomeMy WebLinkAboutB15-0250_M202_1442254080.pdfDN
DN
DN
T
T
EXH
FIXED WINDOW
10x10 EXH
DUCT UP.
5 6 2 7 3 4
A
B
C
G
H
K
L
M
E
D
J
F
EF -1
EF -1
EF -2
KITCHEN
EXHUAST.
10x10 EXH
16x12
16x12
24x12 SA DUCT
UP, TYP. 2.
(2) 4"ø BOILER FLUES
TO CHIMNEY
TERMINATION.
10"ø EXH TO ARCH.
TERMINATION.
20x12
20x12
16x8
16x8
8x8
8x8 10x8
10x8
x
400
30 B
6
TYP. 4
x
400
30 B 6
TYP. 4
x
125
-1010
TYP. 4
x
125
-1010
TYP. 4
NOT FOR CONSTRUCTION
Project number
Date
Drawn by 7/5/2015 6:40:55 PM
M202
LEVEL 2 HVAC PLAN
HUGHES-1
LOT 3 / 994 PTARMIGAN RD
VAIL,CO
Hughes
Residence
06.29.15
DAL
1/4" = 1'-0"
1
LEVEL 2 HVAC PLAN
No. Description Date
RE: _/M_ FOR FIRE AND FIRE/SMOKE
DAMPER ASSEMBLY.
RE: _/M_ FOR TYPICAL DIFFUSER
CONNECTION.
RE: _M/_ FOR FAN COIL UNIT INSTALLATION.
RE: _/M_ FOR VERTICAL FAN COIL UNIT
INSTALLATION.
RE: _/M_ FOR ROUND DUCT TAKE-OFF
DIAGRAM.
RE: _/M_ FOR 45° DUCT TAKE-OFF
DIAGRAM.
COORDINATE ROUTING OF CONDENSATE
DRAIN LINES WITH ARCHITECT PRIOR TO
INSTALLATION.
CEILING COORDINATION OF ALL MEP
SYSTEMS (LIGHTING, DUCTWORK,
DIFFUSERS, ELECTRICAL, FIRE
PROTECTION, ETC.) MUST BE COMPLETED
BY THE CONTRACTOR PRIOR TO THE
START OF ANY INSTALLATIONS.
AVOID ROUTING DUCTWORK OVER
ELECTRICAL ROOMS OR ELECTRICAL
PANELS; MAINTAIN N.E.C. CLEARANCES.
COORDINATE ROUTINGS WITH
ELECTRICAL CONTRACTOR.
CONTRACTOR TO MAINTAIN 8'-6" CLEAR
HEAD HEIGHT IN GARAGE AND INFORM THE
ENGINEER AND ARCHITECT OF ANY AREAS
THAT MAY NOT MEET 8'-6" PRIOR TO
INSTALLATION, MINIMUM 8'-2" CLEAR HEAD
HEIGHT MUST BE MAINTAINED IN
ACCESSIBLE VAN AREAS.
PROVIDE FLEXIBLE DUCT AND PIPE
CONNECTIONS TO ALL MOTORIZED
EQUIPMENT.
VERIFY ALL EQUIPMENT ACCESS PANELS
WITH MANUFACTURER AND ARCHITECT.
ALL SOURCES OF IGNITION ON
MECHANICAL EQUIPMENT SHALL BE
MOUNTED 18" AFF.
PROTECT PIPING ROUTED ALONG
COLUMNS, WALLS, ETC. FROM DAMAGE AS
NECESSARY WITH CAGES. COORDINATE
WITH ARCHITECT.
PEX PIPING SHALL NOT BE ALLOWED TO
PENETRATE FIRE BARRIERS WHERE FIRE
CAULKING IS REQUIRED.
ALL RETURN AIR GRILLES SHALL BE
PROVIDED WITH SOUND BOOT. RE: _/M_
FOR INSTALLATION.
THE SPACE ABOVE CEILING IS BEING
UTILIZED AS A RETURN AIR PLENUM. ALL
RETURN GRILLES SHALL BE PROVIDED
WITH SOUND BOOTS AND A DIRECT PATH
TO THE AIR HANDLING SYSTEM RETURN
DUCT, OPEN TO PLENUM. WHERE FULL
HEIGHT WALLS ARE INSTALLED AND THE
RETURN AIR PATH IS COMPROMISED, THE
SOUND BOOT SHALL EXTEND THROUGH
THE WALL OR TRANSFER AIR DUCTS
SHALL BE PROVIDED.
T-STATS AND CO2 SENSORS SHALL BE
LOCATED NEAR THE LIGHT SWITCH WITHIN
THE ROOM SHOWN. COORDINATE WITH
ARCHITECT & ELECTRICAL ENGINEER TO
MATCH HEIGHT AND LOCATION.
ALL DUCTWORK SHALL BE ROUTED AS
HIGH AS POSSIBLE IN THE CEILING SPACE.
UTILIZE JOIST SPACE WHEN POSSIBLE,
ESPECIALLY WHERE CROSSING OTHER
DUCTS, PIPES, AND ELECTRICAL.
ACCESS PANELS SHALL BE 24x24, UNOP
LOCATIONS SHOWN ARE APPROXIMATE,
EXACT LOCATIONS SHALL BE
COORDINATED WITH THE ARCHITECTS
DRAWINGS AND WITH THE LOCATIONS OF
THE EQUIPMENT OR APPARATUS THAT
THEY SERVE.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
NOTES:
PERMIT SET
09/14/15