Loading...
HomeMy WebLinkAboutB15-0250_M301_1442254080.pdfUP UP H B P7 P2 P2 P2 P2 W DOMESTIC WATER AND FIRE ENTRY. RE: __/M5.00 FOR FURTHER INFORMATION. G G P2 1" G P3 GAS SERVICE ENTRY. RE: DRAWING 4, SHEET M502. 5 6 2 7 3 4 A B C G H K L M E D J F WH-1a WH-1b B -1a B -1b CW 1"CW. RE: CIVIL FOR FURTHER INFORAMTION. W 4" 4"W MAIN TO SEWER SYSTEM. W 3" W 4" _"CW, _"HW, _"HWC FROM MECHANICAL ROOM. CW HW HWC 1" 1" 3/4" HWC HW CW 1 1/2" 1 1/2" 3/4" G HWC HW CW INVERT ELEVATION = ____'. COTG. CW HW HWC CW HW HWC 3/4" 1" 1" P5 P5 P4 P6 P4 P5 P5 P6 P4 P6 P5 P_ V V V V CW HW HWC V V P1 V V V 1/2"G UP TO KITCHEN, TYP. 3. 1"CW, 1"HW, & 1/2"HWC DN. V 3/4"G TO DRYER. CW/HW & W UP TO KITCHEN ISLAND SINK, RE: DIAGRAM C/M500. CW/HW & W UP TO KITCHEN SINK. V V V V CW HW HWC CW/HW & W UP TO FIXTURE. HW CW CW/HW & W UP TO KITCHEN SINK. W G G 3/4"G UP. 1" W 3/4"GAS LINE TO FIRE PIT. 3/4"G UP. W G G HWC HW CW G G UP TO FP. G 1/2" G 1" G PERMIT SET Project number Date Drawn by 8/13/2015 2:05:39 PM M301 LEVEL 1 PLUMBING PLAN HUGHES LOT 3 / 994 PTARMIGAN RD VAIL,CO Hughes Residence 06.29.15 DAL 1/4" = 1'-0" 1 LEVEL 1 PLUMBING PLAN RE: _/M_ FOR CLEANOUT DIAGRAMS. RE: _/M_ FOR ISLAND VENT DIAGRAM. RE: _/M_ FOR TRAP PRIMER CONNECTION. REFER TO THE PLUMBING FIXTURE CONNECTION SCHEDULE FOR PIPE SIZES TO INDIVIDUAL FIXTURES. NOT ALL REQUIRED CLEANOUTS ARE NECESSARILY SHOWN ON THESE PLANS. PROVIDE CLEANOUTS ON WASTE, VENT AND STORM PIPING AS REQUIRED BY CODE AND FOR REASONABLE MAINTENANCE BASED ON ACTUAL FIELD INSTALLATION. COORDINATE LOCATIONS WITH ARCHITECT/ENGINEER. COORDINATE ROUTING OF CONDENSATE DRAIN LINES WITH ARCHITECT PRIOR TO INSTALLATION. PIPING ON EXTERIOR WALLS OR PRE-CAST CONCRETE WALLS TO BE ROUTED IN FRAMED WALL ON INTERIOR SIDE OF INSULATION. ST AND ST(OF) PIPING 3", UNO INSTALL THERMOSTATIC MIXING VALVES, ASSE 1070 LISTED, AT EACH PUBLIC HANDWASHING LAVATORY/SINK. SIZE TO MATCH HW PIPE SIZE. ROOF OVERFLOW DRAINAGE STRATEGY TO BE DETERMINED OR VIA ARCHITECTURAL SCUPPERS UNO TERMINATE PLUMBING VENTS NOT LESS THAN 12" ABOVE ROOF. AVOID ROUTING PIPING OVER ELECTRICAL ROOMS OR ELECTRICAL PANELS; MAINTAIN N.E.C. CLEARANCES. COORDINATE ROUTINGS WITH ELECTRICAL CONTRACTOR. CONTRACTOR TO MAINTAIN 8'-6" CLEAR HEAD HEIGHT IN GARAGE AND INFORM THE ENGINEER AND ARCHITECT OF ANY AREAS THAT MAY NOT MEET 8'-6" PRIOR TO INSTALLATION, MINIMUM 8'-2" CLEAR HEAD HEIGHT MUST BE MAINTAINED IN ACCESSIBLE VEHICLE AREAS. PROVIDE FLEXIBLE PIPE CONNECTIONS TO ALL MOTORIZED EQUIPMENT. ROUTE DOMESTIC HOT WATER RECIRC TO WITHIN 10 FEET OF ALL HOT WATER FIXTURES. CONNECT WITHIN 5 FEET OF 0.5 GPM AND LOWER FAUCETS. VERIFY ALL EQUIPMENT ACCESS PANELS WITH MANUFACTURER AND ARCHITECT. PROTECT PIPING ROUTED ALONG COLUMNS, WALLS, ETC. FROM DAMAGE AS NECESSARY WITH CAGES. COORDINATE WITH ARCHITECT. PEX PIPING SHALL NOT BE ALLOWED TO PENETRATE FIRE BARRIERS WHERE FIRE CAULKING IS REQUIRED. ALL VALVES SHALL BE INSTALLED ABOVE DROP-IN CEILINGS IN ACCESSIBLE LOCATIONS, OR WITH ACCESS PANELS IN HARD-LID CEILINGS. ALL PIPING SHALL BE ROUTED AS HIGH AS POSSIBLE IN THE CEILING SPACE. UTILIZE JOIST SPACE WHEN POSSIBLE, ESPECIALLY WHERE CROSSING OTHER PIPES, DUCTS, AND ELECTRICAL. ACCESS PANELS SHALL BE 24x24, UNO LOCATIONS SHOWN ARE APPROXIMATE, EXACT LOCATIONS SHALL BE COORDINATED WITH THE ARCHITECTS DRAWINGS AND WITH THE LOCATIONS OF THE EQUIPMENT OR APPARATUS THAT THEY SERVE. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. NOTES: THIS SHEET REVISED IN ITS ENTIRETY 1 No. Description Date 1 REV 1 - PERMIT COMMENTS 8.07.2015 09/14/15