HomeMy WebLinkAboutB15-0252_2 - Staging Plan - 10-02-15 - 11-17-15_1441213380.pdfGRAPHIC SCALE (IN FEET) 1 inch = ft. 30 Copyright © 2015 by Zehren & Associates Inc. 2 % 2% 6' tall Construction Site Fence with green screen mesh - Keep off old 18th green in this location Staging & Access Pedestrian access - Maintain 6' clear opening from edge of asphalt to fence Parking & Laydown Construction Entrance - Gates swing into site VRD Storage Pod - Provide access gate Nordic, Golf & Overflow Contractor Parking - No Skier parking 4' tall orange construction fence for drain work taking place between 10/2/15 - 10/31/15 Staging of materials along side of excavation typical Staging of materials along side of excavation typical 4' tall orange construction fence for drain work taking place between 10/2/15 - 10/31/15 Town of Vail to install jersey barriers to protect site fence from snow removal operations Staging Plan from 10-02-15 - 11-17-15 Notes: Town of Vail to handle snow removal from Nordic/Golf Parking. VRD to keep all public pathways clear of snow. ECCG to remove snow from work areas under its control. Refer to Civil plans for erosion control measures. 4' tall orange construction fence for parking lot re-grading and paving. This work to take place from 10-01-15 - 11-17-15. West side of parking lot to be graded and prepped and them flipped to East side. Coordinate exact parking requirements with VRD based on usage experienced. ECCG Job Trailer drainage area to be restore ASAP to allow restoration in spring of 2016 Utiliy excavation to be competed by 11/15/2015 Adjustment of construction fence and erosion control may be required due to unknow depth and location of irrigation mains. Construction fence must be installed to with stand high winds and snow removal Installation and corrdination of Temp structures will required a traffic control and staging plan from NV5. Note; Overflow construction parking in the parking lot is a concern that needs to be addresed by all parties involved during all phases of the construction project. Condition of Approval A pre-determined, limit amount of construction vehicles only, no private construction vehicles. VRD to provide General Contractor a list of days they determine parking lot cannot be used. 09/02/15