January 20, 2016
Subject: Foundation Summary, Golf
Course Nordic Center Remodel, Vail,
Colorado
Job No. 15-6555
Mr. Stan Zemler
Town of Vail
75 South Frontage Road
Vail, CO 81657
Dear Mr. Zemler:
This letter summarizes the special inspection and materials testing services GROUND
Engineering Consultants, Inc. (GROUND) performed during construction of the foundation
elements to date for the main building of the Vail Golf and Nordic Center Project located in Vail,
Colorado. The special inspection and materials testing services were performed at times
scheduled by the Contractor and/or Subcontractors between September 25th, 2015 and January
14th, 2016.
During construction, representatives of our office were present on a part time basis to
periodically observe the open-hole excavations and structural fills placed to date as foundation
soils and during the placement of backfill for the footings. Visual observations and/or nuclear-
moisture density testing was periodically performed on the native and processed soils.
Representatives of our office periodically observed reinforcing steel placement and performed
periodic testing on the structural concrete placed for the foundation, foundation walls and other
structural elements. Samples of the structural concrete were periodically tested to determine
physical properties and compressive strength.
Based on the field observations to date, RFI’s received and/or project documentation received
from the design team, it is our opinion that the materials observed for the structural soils and
reinforced concrete were in general accordance with project plans, specifications, and/or
applicable RFI’s at the time of observation and/or testing.
The observations and materials testing as indicated above were performed periodically to
provide data to the Owner, Contractor and Subcontractors to assist them in evaluating the
general compliance of the materials and/or work with the contract documents at the times of our
observation and testing. We did not supervise, direct nor have any control over any of the
Contractor’s or Subcontractor’s work. We were not responsible for the Contractor’s or
Subcontractor’s scheduling of our services, means, methods, procedures, techniques, or
sequences of construction, nor responsible for ensuring that any Contractor or Subcontractor
performed or completed the work in accordance with the contract documents or construction
industry standards.
Vail Golf and Nordic Center - Foundation Summary
Vail, Colorado
Job No. 15-6555 GROUND Engineering Consultants, Inc. Page 2
If you have any questions concerning this letter, please contact our office.
Sincerely,
GROUND Engineering Consultants, Inc.