Loading...
HomeMy WebLinkAboutB15-0260_A2.1_1439826120.pdfUP DN DN UP DN BONUS ROOM BATH #4 BEDROOM #2 BEDROOM #3 BATH #2 50' - 6" BEDROOM #2 BEDROOM #3 BATH # 2 BATH # 3 CLOSE T CLOSET CLOSET 10' - 3 3/8" NOOK BATH UTILITY ROOM 1 A4.3 1 A4.2 1 A4.1 2 A4.3 2 A4.2 2 A4.1 BEDROOM # 2 BEDROOM #3 BATH #2 BATH # 3 CLOSET BONUS ROOM 28' - 1" 28' - 1" 28' - 1" 43' - 6" 7' - 0" 11' - 0 1/2" 17' - 0 1/2" 28' - 1" 17' - 0 1/2" 11' - 0 1/2" 18' - 4" GAS METERS (EXIST) EXISTING HOT TUB EXISTING HOT TUB NEW STONE SURROUND ALL RAILINGS TO BE REPLACED WITH NEW NEW DECK EXISTING LANDING NEW GRAVEL WALK NEW GATE 2 A5.1 GAS STUBOUT FOR PRE-FAB GAS FIRE - TO BE APPROVED BY T.O.VAIL NEW STEPS MATCH EXISTING. NEW COMPOSITE DECKING TO MATCH EXISTING NEW RAILINGS 7' - 0" EXISTING EASEMENT LINE 11' - 0" 12' - 0" NEW METAL PANEL GUARDRAIL NEW STONE SURROUND NEW STONE SURROUND CENTERLINE OF DRAINAGE DITCH CORNER OF DECK CANTILEVERED ABOVE DRAINAGE DITCH EXISTING DECK EXISTING DECK 30' - 10 3/4" 29' - 4 3/4" 30' - 10 3/4" UNIT 1 UNIT 2 UNIT 3 LINE OF DECK ABOVE LINE OF DECK ABOVE LINE OF HOUSE ABOVE LINE OF HOUSE ABOVE 3 A4.1 SUNKEN HOT TUB LINE OF BLDG. ENVELOPE DECKS MAY ENCROACH 5'-0" HALL REMOVE EXTERIOR WALL ADDITION WALL NEW WINDOWS TO MATCH DN. -10' - 0" -13' - 0" NEW BEAM ABOVE CANTILEVERED DECK ABOVE UP DN. METAL RAILING REMOVE DECK & STEPS WOOD STAIRS SOIL TO BE BERMED UP IN THIS AREA TO KEEP DECK SURFACE WITHIN 30" OF GRADE 1 A4.4 2 A4.4 NEW STRUCTURAL POST ALIGN WALL 11 A5.1 UP 102 103 03 02 101 970.328.5151 OFFICEPO Box 1587, Eagle, CO 81631 www.martinmanleyarchitects.com Project number Date REVISIONS 7/23/2015 11:21:46 AM A2.1 BASEMENT FLOOR PLAN xxxx BRIAR PATCH IMPROVEMENTS PERMIT SET 7-23-15 7-23-15 BRIAR PATCH UNITS 1390 Briar Patch Ln, Vail, CO UNITS 1, 2, & 3 1/4" = 1'-0" 1 1. BASEMENT No. Description Date 08/17/15