Loading...
HomeMy WebLinkAboutB15-0274_A6.2_1460575800.pdfLEVEL 1 - GUEST SUITE & EXERCISE 19' - 6" 5 LEVEL 1A - EXERCISE & BEDROOM 13' - 4 1/2" 4 FAMILY ROOM RE: STRUCT. RE: STRUCT. RE: STRUCT. GLASS FLOOR RE: STRUCT. 3/4" FINISH FLOOR RE: FLOOR PLANS & SPEC REGLET 2X FURRING HELD 1/2" OFF OF CONCRETE FOUNDATION WALL SEE 1/A6.1 FOR TYP. SLAB- ON-GRADE ASSEMBLY SEE 1/A6.2 FOR FOUNDATION NOTES LEVEL 2 - GARAGE & BEDROOMS 33' - 0" 1 STORAGE WEST GARAGE LEVEL 1 - GUEST SUITE & EXERCISE 13' - 4 1/2" EXTERIOR RE: STRUCT. GS14 ASSEMBLY TYP. STONE VENEER WALL ASSEMBLY SEE 1 / A6.1 APPROX. LINE OF EXISTING GRADE SEE 1/A6.1 FOR TYP. TWO SIDED POUR AND TEMP. SHORING WALL DETAIL NOTES. APPROX. LINE OF BEDROCK TEMPORARY SHORING RE: STRUCT. RE: STRUCT. TYP. STONE VENEER WALL ASSEMBLY SEE 1/A6.1 LEVEL 1 - GUEST SUITE & EXERCISE 19' - 6" RE: STRUCT. RE: STRUCT. RE: STRUCT. TYP. PATIO ASSEMBLY SEE 1/A6.2 1 RE: STRUCT. STONE CAP LEVEL 1 - GUEST SUITE & EXERCISE 19' - 6" 4 5 LEVEL 1A - EXERCISE & BEDROOM 13' - 4 1/2" STEAM ROOM EXTERIOR RE: STRUCT. TYP. 3" ASSEMBLY CONSISTING OF APPROX. 3/4" THICK STONE OVER APPROX. 2 1/4" MORTAR BED OVER REINFORCED CONC. SLAB PER STRUCT. 1' - 8 5/8" RE: STRUCT. RE: STRUCT. W.P. MEMBRANE CONT. OUT HORIZONTALLY 3'-0" - CONTINUE MEMBRANE UNDER DOOR SILLS AND UP WALLS SEE 1/A6.1 FOR TYP. SLAB- ON-GRADE ASSEMBLY CONC. SLAB RE STRUCT. 2" RIGID INSULATION @ PATIOS 4" GRAVEL BED UNDER CONCRETE SLAB PER SOILS ENGINEER RECOMMENDATIONS/STRUCT. MIRA DRAIN DRAINAGE MEDIUM OVER WATERPROOF MEMBRANE RE:SPEC W.P. MEMBRANE CONT. FROM B.O. FOOTING TO T.O. CONC. MIRA DRAIN DRAINAGE MEDIUM OVER R-15 3" RIGID FOAM INSULATION PANEL OVER WATERPROOF MEMBRANE RE: SPEC. ALTERNATE INSULATION/ DRAINAGE MEDIUM MAY BE PROPOSED PER SPEC. 4" DIA. RIGID PERFORATED PIPE SURROUNDED BY FILTER FABRIC AND A MIN . OF 4 INCHES OF DRAIN GRAVEL SLOPED 1% MIN. TO DAYLIGHT PER SOILS REPORT. RE: SOILS REPORT FOR ADDITIONAL FOUNDATION AND PERIMETER DRAIN REQUIREMENTS & SPEC CONCRETE FOUNDATION FOOTER RE: STRUCTURAL DRAWINGS CONCRETE FOUNDATION WALL RE: STRUCTURAL DRAWINGS LEVEL 1 - GUEST SUITE & EXERCISE 19' - 6" LEVEL 1A - EXERCISE & BEDROOM 13' - 4 1/2" RE: STRUCT. RE: STRUCT. 1/2" 1 1/2" 3/4" FINISH FLOOR RE: FLOOR PLANS & SPEC REGLET 2X FURRING HELD 1/2" OFF OF CONCRETE FOUNDATION WALL FAMILY ROOM RE: STRUCT. SEE 1/A6.1 FOR TYP. SLAB- ON-GRADE ASSEMBLY SEE 1/A6.2 FOR FOUNDATION NOTES LEVEL 2A - BEDROOMS 26' - 7 1/2" RE: STRUCT. 8 RE: STRUCT. MECHANICAL RM. BEDROOM #4 LEVEL 3A - MAIN LEVEL 39' - 9" W STL. BEAM RE: STRUCT. LEVEL 1A - EXERCISE & BEDROOM 13' - 4 1/2" 6" FSB14 ASSEMBLY FSB14 ASSEMBLY DSB10 ASSEMBLY TYP. STONE VENEER WALL ASSEMBLY SEE 1 / A6.1 APPROX. LINE OF BEDROCK TEMPORARY SHORING RE: STRUCT. RE: STRUCT. SEE 1/A6.1 FOR TYP. TWO SIDED POUR AND TEMP. SHORING WALL DETAIL NOTES. POUR STOP ANGLE WINDOW RE: WINDOW SCHEDULE C LEVEL 1 - GUEST SUITE & EXERCISE 19' - 6" RE: STRUCT. RE: STRUCT. RE: STRUCT. FAMILY ROOM FAMILY RM. PATIO RE: STRUCT. 3 1/2" 5" 5" 11/16" 1/2" SHIM SPACE SEE 4/A6.2 FOR TYP. PATIO ASSEMBLY XOOX LIFT AND SLIDE DOOR 3/4" FINISH FLOOR RE: FLOOR PLANS AND SPEC. SEE 1/A6.1 FOR TYP. SLAB- ON-GRADE ASSEMBLY 2 1/4" SEE 1/A6.2 FOR FOUNDATION NOTES FORM BRACING CONCRETE FORM P.T. PLATE TO PROTECT PREPRUFE FROM CONCRETE FORM FOLD PREPRUFE BACK @ TOP OF SHORING WALL SEE 3/A6.1 FOR TYP. ONE SIDED POUR ASSEMBLY Scale Drawn by Checked by US Mail Only: P. O. Box 2378 Physical / Fedex: 210 Edwards Village Blvd, Bldg A Suite A103 Edwards, Colorado 81632-2378 (970) 926 4301, Fax: 926 4364 hans@berglundarchitects.com www . berglundarchitects.com Issue Date REVISION 1 1/2" = 1'-0" 8/3/2015 13:10:06 A6.2 FOUNDATION DETAILS AG HB 165 FOREST RD VAIL, CO 07/27/2015 VAIL VILLAGE FILING 1, BLOCK 7, LOT 29 PRELIMINARY BUILDING PERMIT SET 1 1/2" = 1'-0" 2 FOUNDATION DETAIL @ ELEVATOR GRID 5 1 1/2" = 1'-0" 4 FOUNDATION DETAIL 2 @ WEST GARAGE GRID 1 - GS14 ASSEMBLY 1 1/2" = 1'-0" 5 FOUNDATION DETAIL @ PATIO GRID 1 - GS14 ASSEMBLY 1 1/2" = 1'-0" 1 FOUNDATION DETAIL @ STEAM RM. GRID 4 1 1/2" = 1'-0" 3 FOUNDATION DETAIL @ STAIR GRID 5 1 1/2" = 1'-0" 8 FOUNDATION DETAIL 2 @ MECHANICAL RM. GRID 8 - FSB14 & DSB10 ASSEMBLY 1 1/2" = 1'-0" 7 FOUNDATION DETAIL @ FAMILY ROOM GRID C 1 1/2" = 1'-0" 6 FOUNDATION DETAIL @ T.O. ONE SIDED POUR DURING CONSTRUCTION No. Revision Date Revision Description 04/13/16