Loading...
HomeMy WebLinkAboutprint_page_10-31-2016_5817bab52bd7d-0.pdfPERMITS MANAGEMENT Create New Inspection: Project: Lublan S.A. Addition 2013 Select options Create Go to Main Inspection Grid 1 + Inspections Checklist Edit Info Minor Framing (Minor Framing (FailFail))Inspector: Inspector: Florencio (JR) MondragonFlorencio (JR) Mondragon Info Florencio (JR) Mondragon at 10/28/2016 09:04:46 am All wood must be FRT provide info Regular wood is not permitted Florencio (JR) Mondragon at 10/28/2016 09:04:50 am Applicant Signature Florencio (JR) Mondragon at 10/28/2016 09:04:50 am Inspector Signature Florencio (JR) Mondragon at 10/28/2016 09:04:54 am Applicant Signature Florencio (JR) Mondragon at 10/28/2016 09:04:54 am Inspector Signature Florencio (JR) Mondragon at 10/28/2016 09:04:58 am Applicant Signature Status Completed Estimated Duration 1 Hour(s) Permit Number B15-0379.001 Parcel Requested Date 08/17/2016 Inspection Date 10/28/2016 Inspection Time Morning Date Completed 10/28/2016 Schedule Notes Gas/Plumbing/HVAC/Framing 331-8233 Result Fail Result comments 1 + 1 + Florencio (JR) Mondragon at 10/28/2016 09:04:58 am Inspector Signature Florencio (JR) Mondragon at 10/28/2016 09:05:02 am Applicant Signature Florencio (JR) Mondragon at 10/28/2016 09:05:02 am Inspector Signature Florencio (JR) Mondragon at 10/28/2016 09:05:14 am Inspector Signature Florencio (JR) Mondragon at 10/28/2016 09:05:14 am Applicant Signature Send NotificationInsert Re-Inspection Checklist Edit Info Schedule Prerequisites Schedule Inspection U Value of Glazing (U Value of Glazing (UninspectedUninspected))Inspector: Inspector: None ScheduledNone Scheduled Info Status Unscheduled Requested Date 08/17/2016 Estimated Duration 1 Hour(s) Permit Number B15-0379.001 Parcel Checklist Edit Info Schedule Prerequisites Schedule Inspection Spray Applied Insulation (Spray Applied Insulation (UninspectedUninspected))Inspector: Inspector: None ScheduledNone Scheduled Info Status Unscheduled Requested Date 08/17/2016 Estimated Duration 1 Hour(s) Permit Number B15-0379.001 Parcel 1 + 1 + 1 + 1 + 1 + Checklist Edit Info Schedule Prerequisites Schedule Inspection Plumbing Final (Plumbing Final (UninspectedUninspected))Inspector: Inspector: None ScheduledNone Scheduled Info Status Unscheduled Requested Date 08/17/2016 Estimated Duration 1 Hour(s) Permit Number B15-0379.001 Parcel Checklist Edit Info Schedule Prerequisites Schedule Inspection Planning Final (Planning Final (UninspectedUninspected))Inspector: Inspector: None ScheduledNone Scheduled Info Status Unscheduled Requested Date 08/17/2016 Estimated Duration 1 Hour(s) Permit Number B15-0379.001 Parcel Checklist Edit Info Schedule Prerequisites Schedule Inspection Mechanical Final (Mechanical Final (UninspectedUninspected))Inspector: Inspector: None ScheduledNone Scheduled Info Status Unscheduled Requested Date 08/17/2016 Estimated Duration 1 Hour(s) Permit Number B15-0379.001 Parcel Checklist Edit Info Schedule Prerequisites Schedule Inspection Dry Wall Dry Wall ((UninspectedUninspected))Inspector: Inspector: None ScheduledNone Scheduled Info Status Unscheduled Requested Date 08/17/2016 Estimated Duration 1 Hour(s) Permit Number B15-0379.001 Parcel Checklist Edit Info Schedule Prerequisites Schedule Inspection Building Final (Building Final (UninspectedUninspected))Inspector: Inspector: None ScheduledNone Scheduled Info 1 + 1 2 + 1 + 1 + Status Unscheduled Requested Date 08/17/2016 Estimated Duration 1 Hour(s) Permit Number B15-0379.001 Parcel Checklist Edit Info Schedule Prerequisites Schedule Inspection Batt Insulation (Batt Insulation (UninspectedUninspected))Inspector: Inspector: None ScheduledNone Scheduled Info Status Unscheduled Requested Date 08/17/2016 Estimated Duration 1 Hour(s) Permit Number B15-0379.001 Parcel Rough Plumbing (Rough Plumbing (PassPass))Inspector: Inspector: Florencio (JR) MondragonFlorencio (JR) Mondragon Rough Mechanical (Rough Mechanical (PassPass))Inspector: Inspector: Florencio (JR) MondragonFlorencio (JR) Mondragon Gas Piping (Gas Piping (PassPass))Inspector: Inspector: Florencio (JR) MondragonFlorencio (JR) Mondragon