Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
B15-0469_SSK1_1456502760.pdf
1'-0" 8" UNGROUTED CMU STONE VENEER SUPPORT 10 1/2" 3'-0" 1'-0" CONC FTG, REINF W/ (3) #5 BOT CONC FDN WALL, REINF W/ #5@12"OC EA WAY CENTERED 8'-10" MIN 3" CLR FINISHES, RE: ARCH RE: PLAN T/SOG STONE VENEER, RE: ARCH 3" CLR CONC FTG, REINF W/ (3) #5 BOT CONC FDN WALL, REINF W/ #5@15"OC EA WAY CENTERED FINISHES, RE: ARCH RE: PLAN T/SOG 2'-0" 1'-0" 3" CLR 7'-10" MIN 3" CLR Golden ● Loveland ● Roaring Fork ● Buffalo, WY KLA, Inc. & Structural Engineers and Builders 215 North 12th Street, Unit E Carbondale, Colorado 81623 P: (970) 927 5174 TITLE: ISSUED WITH: PROJECT NAME: DRAWN BY:SCALE:DATE: REVISED FOUNDATION DETAILS BILLINGSLEY REMODEL NLD 3/4" = 1'-0" 01/19/16 SSK1 3/4" = 1'-0" 1 FOUNDATION DETAIL 3/4" = 1'-0" 2 FOUNDATION DETAIL 01/19/2016 02/26/16