Loading...
HomeMy WebLinkAboutB15-0213_B15-0213 Framing Engineering Report_1452530220.pdfKRMcoNSULTANTS, INC. P.O. Box 4572 • Vall, Colorado 81658 • 97{}-949-9391 TO: DATE: PROJECT: Darryl Lundholm R.A. Nelson 11/19/2015 Collis Addition RECORD JOB NUMBER: 1505-12 D RF/ D MEETING NOTES ~RESPONSE 0 CLARIRCAnON/CHANGE On 11 /18/15, KRM Consultants visited the job site to observe a couple variations from the structural plans. 1) On sheet 52, Main Floor Framing Plan, there is a stud pack called out as (4)-2x6 between the W1 Ox22 and the (3)-11-1/4" LVL's. There are three studs oriented "on-the-flat" in the wall and {1)-2x6 in .the normal orientation. The single 2x6 shall be attached to the other studs with (2)-olylog screws@ 6" O.C. through all other plies. 2) On sheet 53, Roof Framing Plan the contractor would like to use olylog screws to connect all 4 plies of the ridge beam over the garage. The plies may be connected w/ (2)-olylog screws@ 12" O.C. from each side as an alternative to bolting. 3) A few headers were pushed up to be flush with the floor framing. Generally, these were running parallel to the floor joists and so the new location does not cause any issues. 4) The upper floor stair landing has been rotated 90 degrees from the structural drawings. This is acceptable in this location. SIGNED: COPY TO: REVIEWED: NOV 1 9 2815