Loading...
HomeMy WebLinkAboutB15-0253_B15-0253 Steel report_1467909600.pdfl<+A -= -~-Kumar & Associates, Inc. Geotechnical and Materials Engineers and Environmental Scientists 319 East Third Avenue PO Box 5762 Frisco, CO 80443 phone: (970) 368-4779 fax: (970) 368-4978 www.kumarusa.com Office Locations: Denver (HQ), Colorado Springs, Fort Collins, and Frisco, Colorado REINFORCING STEEL OBSERVATION REPORT Todd Oppenheimer Town of Vail 75 South Frontage Road West Vail, CO 81657 Structure: Footing for East half pipe wall Location: Structural Plan & Sheet No. S3 Architectural Plan & Sheet No. Grade: 60 Size: YES0 NOD NtAD Length: YES0 NOD NtAD Location: YES0 NOC NtAD REFERENCE PROJECT NO. 15-6-146 DAILY REPORT NO. 2 Lionshead Skatepark Vail, CO 81657 Elevation: Shop Drawing Sheet No. Other: REINFORCING STEEL COMPLIANCE Quantity: YES 0 NOD N/A D Spacing: YES 0 NOD N/A D Clearance: YES0 NOD NtAD Cleanliness: YES0 NOD NtAD NON-COMPLIANCE INFORMATION Support: Splice: Dowels: Other: Date: 9/17/2015 SHEET 1 OF 1 YES0 NOD YES0 NOD YES0 NOD YESD NOD NtAD NtAD NtAD N/A0 Non-Compliance Date Corrected Approved By How Corrected Progress Report: Contractor was notified of the observations. D FULL-TIME OBSERVATION ~PART-TIME OBSERVATION CONTRACTOR ADVISED: 0 YES D NO IN COMPLIANCE: 0 YES D NO Field Observer: JOB Reviewed By: Barrett Sullivan, Project Supervisor Cc: book, file, TOppenheimer@vailgove.com ~() / Di_)f A-~ l<+A = -~ Kumar & Associates, Inc. Geotechnical and Materials Engineers and Environmental Scientists 319 East Third Avenue PO Box 5762 Frisco, CO 80443 phone: (970) 368-4779 fax: (970) 368-4978 www.kumarusa.com Office Locations: Denver (HQ), Colorado Springs, Fort Collins, and Frisco, Colorado REINFORCING STEEL OBSERVATION REPORT Todd Oppenheimer Town of Vail 75 South Frontage Road West Vail, CO 81657 Structure: Concrete Bowl Location: East Structural Plan & Sheet No. 53.0 Detail 18 Architectural Plan & Sheet No. Grade: 60 Size: YES0 NOD NtAD Length: YES0 NOD NtAD Location: YES0 NOD NtAO REFERENCE PROJECT NO. 15-6-146 DAILY REPORT NO. 1 Lionshead Skatepark Vail, CO 81657 Elevation: Varies Shop Drawing Sheet No. Other: REINFORCING STEEL COMPLIANCE Quantity: YES 0 NOD NIA 0 Spacing: YES 0 NOD NIA D Clearance: YES0 NOD NtAD Cleanliness: YES 0 NOD NIA D NON-COMPLIANCE INFORMATION Support: Splice: Dowels: Other: Date: 8/28/2015 SHEET 1 OF 1 YES0 NOD NtAD YES0 NOD NtAD YESD NOD NtA0 YESD NOD NtA0 Non-Compliance Date Corrected Aooroved By How Corrected Progress Report: D FULL-TIME OBSERVATION ~PART-TIME OBSERVATION CONTRACTOR ADVISED: 0 YES D NO IN COMPLIANCE: ~YES 0 NO Field Observer: BWS Reviewed By: Barrett Sullivan, Project Supervisor Cc: book, file, TOppenheimer@vailgove.com