RECOMMENDED TRANSITION CONSTRUCTION SEQUENCE:
1. INSTALL METAL COPING AND FORMS
2. INSTALL SHOTCRETE, USING THE COPING AND FORMS TO GUIDE PLACEMENT AND SHAPING
3. INSTALL FLATBOTTOM AND TOP DECKS.
rebar development lengths
3000psi
Top Bars
21"
28"
36"
English
Bot. Bars
ldh
Normal Weight Concrete
#4
#5
#3
16"
22"
27"
8"
11"
14"
ld ld
Bot. Bars
Top Bars
ld
31"
25"
18"
ldh
ld
14"
19"
24"
7"
9"
12"
4000psi
#7
#8
#6
71"
62"
43" 33"
48"
55"
16"
19"
22"
47"
42"
28"
37"
54"
62"
19"
17"
14"
#10
#11
#9
98"
89"
80" 62"
68"
75"
25"
27"
30"
65"
59"
53"
69"
77"
85"
26"
24"
21"
Rebar Size
SKATE PARK FLATWORK
SKATE PARK LEDGES & WALLS
SKATE PARK SHOTCRETE
6" TOP DECK CONCRETE SLAB
REFER TO DETAIL 5 / SP-3.0
CONCRETE STAIRS
REFER TO DETAIL 2 / SP-3.3
6" FLATBOTTOM CONCRETE SLAB
REFER TO DETAIL 5 / SP-3.0
6" SHOTCRETE TRANSITIONS, BANKS & EXTENSIONS
REFER TO DETAILS 1, 2, 3, 4, 7, 8 & 9 / SP-3.0, 6 / SP- 3.1 AND 5 / SP-3.3
GRIND LEDGES
REFER TO DETAILS 4 & 5 / SP-3.1
RETAINING WALL
REFER TO DETAIL 3 / SP-3.3
TURNDOWN WALL
REFER TO DETAIL 4 / SP-3.3
THE FOLLOWING ITEMS HAVE BEEN DEEMED AS SPECIALTY CONSTRUCTION WORK WITHIN THE CONTRACT
DOCUMENTS:
SHOTCRETE APPLICATION, CUTTING, SCULPTING AND FINISH.
COPING/RAIL INSTALLATION CONSISTING OF SETTING TO HORIZONTAL LOCATIONS AND VERTICAL ELEVATIONS.
GRIND LEDGE INSTALLATION CONSISTING OF SETTING TO HORIZONTAL LOCATIONS AND VERTICAL ELEVATIONS.
ALL WORK RELATED TO THE SPECIALTY CONSTRUCTION OF THE SKATE PARK SHALL BE COORDINATED WITH
CALIFORNIA SKATE PARKS PRIOR TO THE START OF CONSTRUCTION.
THESE LENGTHS APPLY TYPICALLY UNLESS NOTED OTHERWISE ON PLANS AND/OR DETAILS.
CLEAR SPACING BETWEEN PARALLEL BARS MUST BE AT LEAST ONE BAR DIAMETER BUT NOT LESS THAN 1".
TOP BARS: HORIZONTAL BARS PLACED SO THAT MORE THAN 12" OF FRESH CONCRETE IS CAST IN THE MEMBER
BELOW.
LIGHTWEIGHT CONCRETE: MULTIPLY VALUES IN TABLE BY 1.3.
CLASS B SPLICE: ld x 1.3 LAP LENGTH. STAGGER SPLICES MIN. OF 24".
notes
BY ISSUE
DATE No.:
SHEET NUMBER
273 North Benson Avenue
Upland, California 91786
Phone: 1.800.CA.SKATE
Fax: 909.949.1601
www.californiaskateparks.com
of 16
LIONSHEAD PARKING GARAKE SKATE PARK
350 SOUTH FRONTAGE ROAD WEST, VAIL, COLORADO0
VAIL LIONSHEAD FIL 1 BLOCK 2 LOT 1
&$/,)251,$
6.$7(3$5.6
PERMIT SET
7/17/2015 CSP SHEET TITLE
THICKENED EDGE
REFER TO DETAIL 6 / SP-3.0
EXTENSION
REFER TO DETAIL 7 / SP-3.0
SMALL GRIND LEDGE
REFER TO DETAIL 4 / SP-3.1
MEDIUM GRIND LEDGE
REFER TO DETAIL 5 / SP-3.1
MEDIUM GRIND LEDGE
REFER TO DETAIL 5 / SP-3.1
MEDIUM GRIND LEDGE
REFER TO DETAIL 5 / SP-3.1 LAYBACK EXTENSION
REFER TO DETAIL 6 / SP-3.1
EXTENSION
REFER TO DETAIL 7 / SP-3.0
BOUNDARY WALLS PER STRUCTURAL ENGINEER
REFER TO S-SERIES, STRUCTURAL DRAWINGS
SP-1.2
SKATE PARK CONCRETE
MATERIAL PLAN
WEST SIDE
EAST SIDE
concrete material legend
0'-0"
Scale: 1" = 8'-0"
4'-0"
8'-0"
8'-0"
16'-0"
5
BOUNDARY WALL
UNDERNEATH EXTENSION
07/29/15