Loading...
HomeMy WebLinkAboutB15-0253_SP-1.4_1438199520.pdfIE RE HP 100.00 IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE ACTUAL FINISH GRADE OF THE PROPOSED SKATE PARK. NOT SHOWN notes to contractor survey notes finish grade note: FINAL DEPTH AND SHAPE OF EXCAVATION TO BE DETERMINED BY THE CONSTRUCTION MANAGER IN THE FIELD. ALL AREAS DISTURBED BY GRADING OPERATIONS TO BE FINE GRADED SOILS. VERIFY LOCATION AND DEPTH OF ALL UTILITIES PRIOR TO COMMENCING WORK. VERIFY HEIGHTS WITH THE VERTICAL REFERENCE AND SECTIONS/PROFILES, NOTIFY SKATE PARK DESIGNER OF ANY DISCREPANCIES. MATCH ALL CENTER LINES OF PIPE. ALL SPOT ELEVATIONS ARE TOP OF CONCRETE UNLESS OTHERWISE NOTED. THE TOP OF ALL ROUND COPING TO BE 1/4" ABOVE THE BMX PLATE /TOP OF CONCRETE ELEVATIONS. CONTRACTOR TO PROTECT ALL EXCAVATIONS FROM SOIL EROSION AND WATER SATURATION USING APPROPRIATE CONSTRUCTION METHODS. LOCATE ALL SURVEY MARKS, INCLUDING BENCH MARKS AND PROPERTY LINES IN ORDER THAT THE EXACT LINES OF CONSTRUCTION LIMITS AND GRADES MAY BE DETERMINED. VERIFY ENTIRE LAYOUT PRIOR TO START OF CONSTRUCTION WITH THE OWNER. LOCATE AND PROTECT CONTROL POINTS PRIOR TO STARTING SITE WORK AND PRESERVE ALL PERMANENT REFERENCE POINTS DURING CONSTRUCTION. REPLACE PROJECT CONTROL POINTS WHICH MAY BE LOST OR DESTROYED. SPOT GRADE ELEVATION DRAIN INLET, REFER TO DETAIL 7 / SP-3.3 DIRECTION OF FLOW HIGH POINT INVERT ELEVATION RIM ELEVATION BREAK IN GRADE DRAIN LINE, REFER TO CIVIL PLANS BY ISSUE DATE No.: SHEET NUMBER 273 North Benson Avenue Upland, California 91786 Phone: 1.800.CA.SKATE Fax: 909.949.1601 www.californiaskateparks.com of 16 LIONSHEAD PARKING GARAKE SKATE PARK 350 SOUTH FRONTAGE ROAD WEST, VAIL, COLORADO0 VAIL LIONSHEAD FIL 1 BLOCK 2 LOT 1 ‹&$/,)251,$ 6.$7(3$5.6  PERMIT SET 7/17/2015 CSP SHEET TITLE SP-1.4 SKATE PARK GRADING PLAN WEST SIDE EAST SIDE 0'-0" Scale: 1" = 8'-0" 4'-0" 8'-0" 8'-0" 16'-0" grading legend TB TOP OF BANK TE TOP OF EXTENSION TRLR TOP OF ROLLER ME MATCH EXISTING 7 07/29/15