HomeMy WebLinkAboutB15-0253_SP-1.4_1438199520.pdfIE
RE
HP
100.00
IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE ACTUAL FINISH GRADE OF THE PROPOSED SKATE
PARK.
NOT SHOWN
notes to contractor
survey notes
finish grade note:
FINAL DEPTH AND SHAPE OF EXCAVATION TO BE DETERMINED BY THE CONSTRUCTION MANAGER IN THE FIELD.
ALL AREAS DISTURBED BY GRADING OPERATIONS TO BE FINE GRADED SOILS.
VERIFY LOCATION AND DEPTH OF ALL UTILITIES PRIOR TO COMMENCING WORK.
VERIFY HEIGHTS WITH THE VERTICAL REFERENCE AND SECTIONS/PROFILES, NOTIFY SKATE PARK DESIGNER OF
ANY DISCREPANCIES.
MATCH ALL CENTER LINES OF PIPE.
ALL SPOT ELEVATIONS ARE TOP OF CONCRETE UNLESS OTHERWISE NOTED.
THE TOP OF ALL ROUND COPING TO BE 1/4" ABOVE THE BMX PLATE /TOP OF CONCRETE ELEVATIONS.
CONTRACTOR TO PROTECT ALL EXCAVATIONS FROM SOIL EROSION AND WATER SATURATION USING
APPROPRIATE CONSTRUCTION METHODS.
LOCATE ALL SURVEY MARKS, INCLUDING BENCH MARKS AND PROPERTY LINES IN ORDER THAT THE EXACT
LINES OF CONSTRUCTION LIMITS AND GRADES MAY BE DETERMINED.
VERIFY ENTIRE LAYOUT PRIOR TO START OF CONSTRUCTION WITH THE OWNER.
LOCATE AND PROTECT CONTROL POINTS PRIOR TO STARTING SITE WORK AND PRESERVE ALL PERMANENT
REFERENCE POINTS DURING CONSTRUCTION. REPLACE PROJECT CONTROL POINTS WHICH MAY BE LOST OR
DESTROYED.
SPOT GRADE ELEVATION
DRAIN INLET, REFER TO DETAIL 7 / SP-3.3
DIRECTION OF FLOW
HIGH POINT
INVERT ELEVATION
RIM ELEVATION
BREAK IN GRADE
DRAIN LINE, REFER TO CIVIL PLANS
BY
ISSUE
DATE No.:
SHEET NUMBER
273 North Benson Avenue
Upland, California 91786
Phone: 1.800.CA.SKATE
Fax: 909.949.1601
www.californiaskateparks.com
of 16
LIONSHEAD PARKING GARAKE SKATE PARK
350 SOUTH FRONTAGE ROAD WEST, VAIL, COLORADO0
VAIL LIONSHEAD FIL 1 BLOCK 2 LOT 1
&$/,)251,$
6.$7(3$5.6
PERMIT SET
7/17/2015 CSP
SHEET TITLE
SP-1.4
SKATE PARK
GRADING PLAN
WEST SIDE
EAST SIDE
0'-0"
Scale: 1" = 8'-0"
4'-0"
8'-0"
8'-0"
16'-0"
grading legend
TB TOP OF BANK
TE TOP OF EXTENSION
TRLR TOP OF ROLLER
ME MATCH EXISTING
7
07/29/15