Loading...
HomeMy WebLinkAboutB15-0253_SP-3.2_1438199520.pdfscale: 11 post in ledge detail 1-1/2" = 1'-0" scale: 12 post in step detail n.t.s. scale: 8 BMX protective plate on c-channel 1/4" = 1'-0" scale: 2 round coping detail 1" = 1'-0" scale: 1 coping construction support 1" = 1'-0" scale: 3 4"x4" bent plate detail 1/4" = 1'-0" scale: 5 5" or 6" c-channel steel coping detail 1/4" = 1'-0" scale: 4 5" protective steel face plate 1/4" = 1'-0" scale: 6 pool coping detail 1" = 1'-0" BY ISSUE DATE No.: SHEET NUMBER 273 North Benson Avenue Upland, California 91786 Phone: 1.800.CA.SKATE Fax: 909.949.1601 www.californiaskateparks.com of 16 LIONSHEAD PARKING GARAKE SKATE PARK 350 SOUTH FRONTAGE ROAD WEST, VAIL, COLORADO0 VAIL LIONSHEAD FIL 1 BLOCK 2 LOT 1 ‹&$/,)251,$ 6.$7(3$5.6  PERMIT SET 7/17/2015 CSP SHEET TITLE COPING - REFER TO MATERIALS PLAN FOR TYPE & LOCATION. FOR CONNECTION SEE "STEEL PIPE COPING" DETAIL #4 REBAR SUPPORT, WELDED TO THE LOWER BACK SIDE OF THE COPING. 6" DIA. X 11" CONCRETE FOOTING SHOTCRETE WALL PLACE COPING CONSTRUCTION SUPPORT AT 2'-6" O.C. MIN. ALONG COPING 4" AGGREGATE BASE COURSE 6" REINFORCED TOP DECK REBAR SUPPORT TO BE ENCASED BY CONCRETE AND NOT TO TOUCH THE ADJACENT EARTH TO PREVENT CORROSION GEOFOAM REINFORCEMENT BLOCK 3/16" TYP. 1/4" 1/4" FLOW 1% MIN. NOTE: WELD & GRIND SMOOTH END CAPS WHERE PIPE ENDS ARE EXPOSED. NO OPEN PIPES, OR CONCRETE FILLED CAPS WILL BE ACCEPTED. 1/8" TOOLED JOINT - CONTINUOUS ALONG TOP & BOTTOM OF COPING, FILL WITH POLYURETHANE ELASTOMERIC SEALANT, TYP. SHOTCRETE WALL REINFORCED TOP DECK REFER TO MATERIALS PLAN FOR LOCATION. 4" X 3/8" MIN. HOOK ANCHOR OR NELSON STUD @ 18" O.C. WELDED TO COPING. LEDGE, REFER TO PLANS TO LOCATION AND DIMENSIONS RAIL POST, REFER TO "RAIL/POST CHART" FOR SIZE POST PLACEMENT ZONE, PLACE POST A MIN. OF 4" FROM ALL FACES OF THE LEDGE POST PLACEMENT ZONE, PLACE POST IN THE MIDDLE OF THE STEP RAIL POST, REFER TO "RAIL/POST CHART" FOR SIZE STAIRS, REFER TO PLANS TO LOCATION AND DIMENSIONS EQUALLY SPACED REFER TO SECTIONS FOR EXACT PLACEMENT 1/4" THICK STEEP PLATE WELDED ALL AROUND TO BOTTOM OF ALL POSTS, SIZE PER DETAIL, TYP. POST - REFER TO SKATE RAIL AND FOOTING DETAIL FOR TYPE REINFORCED TOP DECK WELD END PLATE AT ENDS, GRIND SMOOTH. RAIL - REFER TO MATERIALS PLAN FOR TYPE & LOCATION. L C HYBRID RAIL rail/post chart RAIL ROUND PIPE POST 2" ROUND 2" ROUND 6" 3" CLR. TYP. ‘ MIN. 3/16" STEEL POST, TYPE VARIES, REFER TO RAIL/POST CHART DRILLED CONCRETE PIER FOOTING 4" AGGREGATE BASE COURSE USE THESE RAIL/POST COMBINATIONS UNLESS OTHERWISE NOTED. CONTINUOUS TOP RAIL, VARIES REFER TO SKATE PARK MATERIALS PLAN FOR TYPE & LOCATION, WELD END PLATE, GRIND SMOOTH L C GEOFOAM REINFORCEMENT BLOCK 2" X 3" SQUARE PER GRAPHIC RAIL POST 2" END SPLICE CORNER COPING END CAP UTILIZE HANDRAIL COUPLERS @ JOINT FOR WELD BACK UP G G COPING COPING 3/16" GRIND SMOOTH TYP. 3/16" 4" RADIUS 1/2" REFER TO SECTION FOR BANK ANGLE. REFER TO MATERIALS PLAN FOR LOCATION. 4" X 3/8" MIN. HOOK ANCHOR OR NELSON STUD @ 18" O.C. 1/8" TOOLED JOINT - CONTINUOUS ALONG TOP & BOTTOM OF COPING, FILL WITH POLYURETHANE ELASTOMERIC SEALANT, TYP. SHOTCRETE BANK CONCRETE LEDGE TOP DECK, OR STAIR 3/16" TYP. 4" X 3/8" MIN. HOOK ANCHOR OR NELSON STUD @ 18" O.C. WELDED TO PLATE 4" X 3/8" MIN. HOOK ANCHOR OR NELSON STUD @ 18" O.C. CONCRETE LEDGE 1 7 8 " 2" X 4" STEEL PLATE @ 24" O.C. 1 7 8" 2" 1 1 2" CANTILEVER 1/8" TOOLED JOINT, CONTINUOUS ALONG PLATE REFER TO MATERIALS PLAN FOR LOCATION 3/16" TYP. 4" AGGREGATE BASE COURSE REINFORCED TOP DECK 6" SHOTCRETE WALL WITH #3 REBAR @ 12" O.C. BOTH WAYS 6" X 1/4" TILE BAND. TILE SET IN MORTAR BED AND FLUSH WITH SHOTCRETE WALL. REFER TO MATERIALS PLAN FOR TYPE & LOCATION. PRE-MANUFACTURED GOLDEN STATE POOL COPING - REFER TO MATERIALS PLAN FOR TYPE & LOCATION. COPING TO OVERHANG FINISHED WALL 1/2". 1/2" MORTAR BED REINFORCED BOND BEAM 1/8" TOOLED JOINT, APPLY BOND BREAKER BEFORE POURING TOP DECK. INSTALL EXPANSION JOINT BETWEEN TOP DECK AND POOL COPING 1'-0" GEOFOAM REINFORCEMENT BLOCK CONCRETE LEDGE 2" X 4" STEEL PLATE @ 2' O.C. 3/16" TYP. 1/8" TOOLED JOINT, CONTINUOUS ALONG PLATE 5" C-CHANNEL STEEL COPING - REFER TO MATERIALS PLAN FOR LOCATION WELD PLATE TO COPING WITH 2" LONG WELDS @ 2'-0" O.C., ALTERNATE TOP AND BOTTOM OF PLATE 4" X 3/8" MIN. HOOK ANCHOR OR NELSON STUD @ 18" O.C. 3/16" TYP. 2" ROUND STEEL PIPE COPING, REFER TO METAL MATERIALS PLANS FOR LOCATION 4" X 3/8" MIN. ANCHOR BOLT OR NELSON STUD @ 18" O.C. WELDED TO PLATE CONCRETE TRANSITION 1/8" TOOLED JOINT, CONTINUOUS ALONG PLATE 1/4" X 4" STEEL PLATE, WELDED TO COPING note: WELD PLATE TO COPING WITH 2" LONG WELDS @ 2'-0" O.C., ALTERNATE TOP AND BOTTOM OF PLATE 1/4" scale: 9 typical rail and footing detail 1" = 1'-0" scale: 7 BMX protective plate on round coping 1/4" = 1'-0" scale: 10 coping/rail joint welds n.t.s. SP-3.2 SKATE PARK CONSTRUCTION DETAILS 15 07/29/15