Loading...
HomeMy WebLinkAboutB15-0269_Weber BBQ Spec Sheet_1440003180.pdf BUILT-IN CUTOUT DIMENSIONS GENERAL CONSTRUCTION DETAILS Summits Built-In Unit and all other accessory units should be on site before construct:on begins. For ease of installation the grill will be pushed on its casters into the built-in structure. The installation of this gr., requires a level floor pad surface(1)and countertop surface. The floor pad surface must be constructed from solid materials and must be level and smooth.Proper subgrade materials must be used under the floor pad to prevent materials from settling and heaving. Rotisserie Outlet 4 "/ P4 ''' If the supporting structure is going to have an electrical outlet for a rotisserie,it should be on the left side of the structure.o �° . 11\\LI pi•-•-.. rap ob.e,.....-0..0...,.pto.::::.. ,._....::::::..... Grill and enclosure illustrations I `*ir)(l) are for reference only. BUILT-IN CUTOUT GENERAL DIMENSIONS BUILT-IN CUTOUT GENERAL DIMENSIONS All dimensions are to finished surfaces. © WARNING:All countertop finished surfaces must be constructed of a noncombustible material. • 0 lir 1 \, I 460 660 TOLERANCES i j 1 34"(864 mm) 42"(1067 mm) t/4"(6 mm) I 2 36"(914 mm) 36"(914 mm) max 3 24 5/,6"(618 mm) 24 his"(618 mm) j1% (6 mm) 4 • i'``j`�`` r BUILT-IN CUTOUTCUTOUT DIME • • POSITIONING YOUR GRILL CLEARANCES-INSTALLATION ADJACENT TO A STRUCTURE When determining a suitable location for your Summit®Gas Grill installation,give thoany ghtas o concenns as such as exposure ossi l .wind,proximity too traffic paths,and keeping any gas supply lines as short as possible.Never locate the Summits Gas Grill in a 5 garage,breezeway,or shed,under an unprotected overhang,or in any other enclosed area.Position the grill and structure so there is enough room to safely evacuate the area in case of a fire. a CLEARANCE FROM SURFACES OR STRUCTURES +— - WARNING:The structure,"island,"countertops,and — adjacent work areas for the Built-In Grill installation must be –. _Q —0 ._- built from noncombustible materials only. u NOTE:If you have questions on which materials are considered noncombustible, contact your local building materials supplier or fire department.• 1 24"(610 mm)any surface 2 27"(686 mm)minimum for lid clearance CLEARANCES-"ISLAND",INSTALLATION It — � - 1 24"(610 mm)any surface 2 27"(686 mm)minimum for lid clearance 3 10 1/2"(267 mm)minimum WWW.WEBER.COM® 5 VENTILATION VENTILATION - m WARNING:Ventilation holes must be provided in the structure at the top and bottom to provide ventilation in the event of a gas leak. � �,.:• /: r ` Ventilation holes can be located in a low visibility area and should be protected by _� y Of 'VI , . screening material to prevent rodents and insects from entering the structure.Air holes ; � '� ,�_ will also help dry moisture. Note:These drawings are only a reference. ~� / tZ] • Cross ventilation must be incorporated in the supporting structure.We recommend a / minimum of 100 square inches(254 square cm)of venting per side. • Vents should be on two sides of the structure. • The drawings are for reference only. -. -- • Position of the vents should be from the center,outward. • Position the vents at both the bottom of the structure and at the top of the structure. • The bottom vents should be as close to ground level as possible.Make sure the vent area is not blocked by interior supports of the structure. • We recommend vents with screens. Q • Access doors to the structure are not considered vents. • Clean the vents periodically. DANGER ®6065 6®lC15 I Failure to follow recommended minimum venting instructions can cause gas to collect in the structure in the event of a gas leak.This may result in a fire or an explosion which can cause serious bodily injury or death,and damage • to property.o I 8