Loading...
HomeMy WebLinkAboutB15-0303_C600_1441148520.pdfTOWN OF VAIL MUNICIPAL PARKING LOT C600 WALL AND STAIR DETAILS NOTES: 1. SEE ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION. 2. REBAR SHALL BE EPOXY COATED. 3. SPLICE #4 BARS 2'-4" AS NEEDED. 1'-0" 1'-6" 1'-6" #4@12" #4@12" (2) #4 BOT (2) #4 BOT PROPOSED STEM WALL, RE:ARCH. FOR TOP OF WALL DETAIL AND CONNECTION TO CONC SLAB DETAIL 4" THICK CONC SLAB - PROVIDE MIN. 2% SLOPE AWAY FROM BUILDING ALONG, RE:ARCH. FOR CONNECTION TO WALL CONC SLAB AT BUILDING TO BE MIN. 6" BELOW FINISH FLOOR ELEVATION 2'-0"MAX 4'-2" 3'-3" 6" 6" #5@12" OC #5@18" OC HORIZ NOTES: 1. CONTRACTOR TO BACKFILL AND COMPACT SOIL ON EACH SIDE OF THE WALL EVENLY UP TO FINISHED GRADE AT LOW SIDE. DO NOT BACKFILL HIGH SIDE OF RATINING WALL UNTIL SIDEWALK, CURB, AND ASPHALT HAVE BEEN PLACED. 2. PROVIDE CONTROL JOINTS 20'-0" OC MAX WITH 3/4" DEEP REVEAL FULL HEIGHT OF WALL CONTINUE OVER TOP OF WALL. LOCATE REVEAL AT TOP OF WALL STEPS. TERMINATE 50% OF HORIZONTAL WALL REINF AT CONTROL JOINT. PROVIDE VERTICAL WALL REINF TO MATCH TYP VERT REINF AT 3" EACH SIDE OF CONTROL JOINT. &21&5(7(6+$//%(36,“(175$,1('$,5ߛ0$;ߜ:& REBAR SHALL BE A615 GRADE 60. WALL SHALL HAVE A SMOOTH FORMED FINISH, RE SPECS. 4. REFER TO ARCHITECTURAL DRAWINGS FOR DETAILS REGARDING WATER PROOFING, CONNECTION BETWEEN PROPOSED WALL AND PROPOSED SLAB, CONNECTION BETWEEN PROPOSED SLAB AND EXISTING BUILDING AND FOR DETAILS REGARDING EXPANSION JOINT MATERIALS. 5. INSULATION AGAINST THE EXISTING BUILDING FOOTING SHALL EXTEND A MINIMUM OF 4' BENEATH THE CONCRETE SLAB. IF AT ANY POINT ALONG THE EXISTING FOUNDATION WALL THE DEPTH BETWEEN BOTTOM OF FOOTING AND BOTTOM OF CONC SLAB IS LESS THAN 4', THE INSULATION SHALL EXTEND UP ABOVE THE CONC SLAB UNTIL A DEPTH OF 4' IS ATTAINED. 2" CLR SIDEWALK VARIES SEE PLAN #5@12" OC, TRANSVERSE CONC SLAB, SEE PLAN “ߚ V.I.F. 2" FOAMULAR 150 XPS RIGID INSULATION OR APPROVED EQUIVALENT (R-10, 15 PSI) CONTINUE ABOVE GRADE WITHOUT EXPOSING THE FOUNDATION WALL OR OTHER THERMALLY CONDUCTIVE MATERIALS FOAMULAR 250 XPS RIGID INSULATION OR APPROVED EQUIVALENT (R-15, 15 PSI) MIN 6" OF NON-FROST SUSCEPTIBLE SOIL (PER ASTM D422) BELOW GROUND INSULATION CONTRACTOR TO VERIFY LENGTH OF EX. FOOTING PRIOR TO CONSTRUCTION AND REPORT TO ENGINEER TO VERIFY PROPOSED STEM WALL HAS SUFFICIENT ROOM BETWEEN EX. FOOTING AND PROPOSED FOOTING EXPANSION JOINT MATERIAL DESIGN CRITERIA NOTES: FROST PROTECTION DESIGN CRITERIA PER ASCE 32-01, FROST PROTECTED SHALLOW FOUNDATIONS - x $6680(''(6,*1$,5)5((=,1*,1'(;9$/8()߰ƒ)'$<6 x 9(57,&$/,168/$7,2121(;,67,1*)281'$7,21:$//,6'(6,*1(')25$³+($7('6758&785(´ x +25,=217$/,168/$7,21%(/2:7+(1(:67(0:$//)281'$7,21,6'(6,*1(')25$1³81+($7(' 6758&785(´ x CONTINUOUS INSULATION FROM BELOW NEW FOOTING UP THE VERTICAL FACE OF EXISTING FOUNDATION UTILIZES THE SPECIAL DESIGN CONSIDERATIONS FOR FROST PROTECTED SHALLOW )281'$7,2167235(9(17³&2/'%5,'*(6´ x THE NON-FROST SUSCEPTIBLE SOIL LAYER IS PLACED BELOW ALL GROUND INSULATION IN ACCORDANCE WITH ASCE 32-01 RECOMMENDATIONS. x INSULATION BEARING CAPACITIES AND THERMAL RESISTIVITY ARE CALCULATED BASED ON STRUCTURAL REQUIREMENTS OF THE STEM WALL AND ASCE 32-01 RECOMMENDATIONS ASSUMED VALUES FOR FOOTING DESIGN - x MAXIMUM TOTAL LOAD SOIL BEARING PRESSURE = 3000 PSF x ACTIVE EQUIVALENT FLUID PRESSURE = 50 PCF x PASSIVE EQUIVALENT FLUID PRESSURE = 300 PCF x LATERAL PRESSURE DO TO SURCHARGE = 65 PSF (FOR 100 PSF LIVE LOAD) 09/01/15