Loading...
HomeMy WebLinkAboutB16-0013_Lighting Complinace Report_1454720820.pdf COMcheck Software Version 4.0.2.2 Vel Interior Lighting Compliance Certificate in° Project Information Energy Code: 2015 IECC Project Title: VAIL CASCADE Project Type: New Construction Construction Site: Owner/Agent: Designer/Contractor: 1300 Westhaven Dr 1300 Westhaven Dr SYSKA HENNESSY Vail,CO 81657 VAIL, CO 81657 RICHARDSON,TX Additional Efficiency Package Reduced interior lighting power.Requirements are implicitly enforced within interior lighting allowance calculations. Allowed Interior Lighting Power A B C D Area Category Floor Area Allowed Allowed Watts (ft2) Watts/ft2 (B X C) 1-4K(Common Space Types:Guest Room) 1780 0.42 748 2-2K(Common Space Types:Guest Room) 1355 0.42 569 3-1QQ(Common Space Types:Guest Room) 1358 0.42 570 Total Allowed Watts= 1887 Proposed Interior Lighting Power A B C D E Fixture ID : Description/Lamp/Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D) Fixture Fixtures Watt. 1-4K(Common Space Types:Guest Room) LT1:Other: 2 1 60 60 LT2:Other: 2 2 60 120 N1:Other: 1 6 5 30 N2:Other: 1 1 15 15 N3:Other: 1 1 20 20 N4/N4L:Other: 1 3 20 60 2-2K(Common Space Types:Guest Room) N1:Other: 1 5 5 25 N2:Other: 1 1 15 15 N4/N4L:Other: 1 3 20 60 LT1:Other: 2 1 60 60 LT2:Other: 2 2 60 120 LT3:Other: 1 1 60 60 3-WQ(Common Space Types:Guest Room). N1:Other: 1 4 5 20 N2:Other: 1 1 15 15 N4/N4L:Other: 1 3 20 60 LT1:Other: 2 1 60 60 LT2:Other: 2 2 60 120 LT4:Other: 1 1 60 60 Project Title: VAIL CASCADE Report date: 01/21/16 Data filename: P:\DAL\BET\LADTX003\Design_Information\COMCHECK.cck Page 1 of 6 Total Proposed Watts= 980 Interior Lighting PASSES: Design 48% better than code Interior Lighting Compliance Statement Compliance Statement: The proposed interior lighting design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application.The proposed interior lighting systems have been designed to meet the 2015 IECC requirements in COMcheck V 4. .2 and to comply with the mandatory requirements listed in the Inspection Checklist. Pa2-1 Nam -Title Signa ure Date ti Project Title: VAIL CASCADE Report date: 01/21/16 Data filename: P:\DAL\BET\LADTX003\Design_Information\COMCHECK.cck Page 2 of 6