HomeMy WebLinkAboutB16-0013_Lighting Complinace Report_1454720820.pdf COMcheck Software Version 4.0.2.2
Vel Interior Lighting Compliance Certificate
in°
Project Information
Energy Code: 2015 IECC
Project Title: VAIL CASCADE
Project Type: New Construction
Construction Site: Owner/Agent: Designer/Contractor:
1300 Westhaven Dr 1300 Westhaven Dr SYSKA HENNESSY
Vail,CO 81657 VAIL, CO 81657 RICHARDSON,TX
Additional Efficiency Package
Reduced interior lighting power.Requirements are implicitly enforced within interior lighting allowance calculations.
Allowed Interior Lighting Power
A B C D
Area Category Floor Area Allowed Allowed Watts
(ft2) Watts/ft2 (B X C)
1-4K(Common Space Types:Guest Room) 1780 0.42 748
2-2K(Common Space Types:Guest Room) 1355 0.42 569
3-1QQ(Common Space Types:Guest Room) 1358 0.42 570
Total Allowed Watts= 1887
Proposed Interior Lighting Power
A B C D E
Fixture ID : Description/Lamp/Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D)
Fixture Fixtures Watt.
1-4K(Common Space Types:Guest Room)
LT1:Other: 2 1 60 60
LT2:Other: 2 2 60 120
N1:Other: 1 6 5 30
N2:Other: 1 1 15 15
N3:Other: 1 1 20 20
N4/N4L:Other: 1 3 20 60
2-2K(Common Space Types:Guest Room)
N1:Other: 1 5 5 25
N2:Other: 1 1 15 15
N4/N4L:Other: 1 3 20 60
LT1:Other: 2 1 60 60
LT2:Other: 2 2 60 120
LT3:Other: 1 1 60 60
3-WQ(Common Space Types:Guest Room).
N1:Other: 1 4 5 20
N2:Other: 1 1 15 15
N4/N4L:Other: 1 3 20 60
LT1:Other: 2 1 60 60
LT2:Other: 2 2 60 120
LT4:Other: 1 1 60 60
Project Title: VAIL CASCADE Report date: 01/21/16
Data filename: P:\DAL\BET\LADTX003\Design_Information\COMCHECK.cck Page 1 of 6
Total Proposed Watts= 980
Interior Lighting PASSES: Design 48% better than code
Interior Lighting Compliance Statement
Compliance Statement: The proposed interior lighting design represented in this document is consistent with the building plans,
specifications, and other calculations submitted with this permit application.The proposed interior lighting systems have been
designed to meet the 2015 IECC requirements in COMcheck V 4. .2 and to comply with the mandatory requirements
listed in the Inspection Checklist.
Pa2-1
Nam -Title Signa ure Date ti
Project Title: VAIL CASCADE Report date: 01/21/16
Data filename: P:\DAL\BET\LADTX003\Design_Information\COMCHECK.cck Page 2 of 6