Loading...
HomeMy WebLinkAboutprint_page_08-17-2016_57b4e6449c1a6-0.pdfPermits Management (B16-0013) Fee Charges (17) Child Cases (2) Contacts (1) Contractors (1) Properties (1) Inspections (10) Documents (7) Tagged Cases (1) Activities (236) Add Tag PERMITS MANAGEMENT Create New Inspection: Project: Cascade Resort Hotel Rooms 2016 Select options CreateGo to Main Inspection Grid 1 + 1 + Type: Construction Commercial Start Date: 02/05/2016 Status: Issued Parent Case Applicant Todd Goulding CO Email: tgoulding@blacklinegroup.com EDIT PWI Construction Inc Date Exp: 04/30/2019 Status: Active Contractor #: CT-0317 State License #: Contractor Type: General [210312100012] 1300 WESTHAVEN DR Snow Avalanche: No Land use: Resort Accommodations and Services Zone District Designation: Not Designated TOV Subdivision: CASCADE VILLAGE - VAIL CASCADE RESORT Legal Subdivision: Unplatted Rock Fall: No Lot Number: TOV Block: 100 year plain - Flood Hazard Zone: Debris Flow: No Lot Area: Inspections Checklist Edit Info Building Final (Building Final (ConditionalConditional))Inspector: Inspector: Charlie DavisCharlie Davis Info Charlie Davis at 08/17/2016 11:58:23 am Unit 195 approved only Charlie Davis at 08/17/2016 11:58:27 am Inspector Signature Charlie Davis at 08/17/2016 11:58:27 am Applicant Signature Charlie Davis at 08/17/2016 11:58:23 am 310 and 317 no water no elec to units Status Completed Estimated Duration 1 Hour(s) Permit Number Not Issued Parcel Requested Date 08/16/2016 Inspection Date 08/17/2016 Inspection Time Morning Date Completed 08/17/2016 Schedule Notes model room finals (all) Result Conditional Result comments Send NotificationInsert Re-Inspection Checklist Edit Info Plumbing Final (Plumbing Final (ConditionalConditional))Inspector: Inspector: Charlie DavisCharlie Davis Info Status Completed Estimated Duration 1 Hour(s) Permit Number Not Issued Parcel Requested Date 08/16/2016 Inspection Date 08/17/2016 Inspection Time Morning Date Completed 08/17/2016 Schedule Notes 1 + 1 2 + + Charlie Davis at 08/17/2016 11:59:27 am Unit 195 only no water to other units Charlie Davis at 08/17/2016 11:59:31 am Inspector Signature Charlie Davis at 08/17/2016 11:59:31 am Applicant Signature Result Conditional Result comments Send NotificationInsert Re-Inspection Checklist Edit Info Mechanical Final (Mechanical Final (ConditionalConditional))Inspector: Inspector: Charlie DavisCharlie Davis Info Charlie Davis at 08/17/2016 12:00:21 pm Unit 195 only no power to to other units Charlie Davis at 08/17/2016 12:00:26 pm Inspector Signature Charlie Davis at 08/17/2016 12:00:26 pm Applicant Signature Status Completed Estimated Duration 1 Hour(s) Permit Number Not Issued Parcel Requested Date 08/16/2016 Inspection Date 08/17/2016 Inspection Time Morning Date Completed 08/17/2016 Schedule Notes Result Conditional Result comments Send NotificationInsert Re-Inspection Dry Wall Dry Wall ((PassPass))Inspector: Inspector: Charlie DavisCharlie Davis 1 + 1 2 + 1 + 1 + Batt insulation (Batt insulation (PassPass))Inspector: Inspector: Charlie DavisCharlie Davis Minor Framing (Minor Framing (PassPass))Inspector: Inspector: Charlie DavisCharlie Davis Rough Mechanical (Rough Mechanical (PassPass))Inspector: Inspector: Charlie DavisCharlie Davis Rough Plumbing (Rough Plumbing (PassPass))Inspector: Inspector: Charlie DavisCharlie Davis