Loading...
HomeMy WebLinkAboutB16-0056_M-2.0_1478906342.pdfSCALE: EXISTING/DEMO MECHANICAL FLOOR PLAN 1/4" = 1'-0" REMOVE (E)CRAC UNIT AND MATCHED CU FROM SERVER ROOM CEILING AND RETURN TO OWNER. 1 FLAG NOTES: (E) (E)30x18 (E)42x18 (E) CRAC UNIT 1 (E) CU MATCHED TO CRAC UNIT. 1 (E) LIKELY ROUTED TO OSA INTAKE, CONTINUATION NOT VISIBLE. REMOVE AS MUCH DUCTWORK AS POSSIBLE, CAP AND SEAL REMAINING OPEN DUCT END. (E)20x18 (E)20x10 REMOVE, SAVE FOR RE-USE. RA DUCT TO LIBRARY CEILING NOT FOUND, BUT PLENUM OBSERVED TO BE PRESSURIZED AND AIR INTAKE OCCURRING AT RA GRILLES. ENSURE THAT RA DUCT TO LIBRARY CEILING REMAINS UNOBSTRUCTED DURING AND AFTER RENOVATION. 1. TEMPORARILY REMOVE (E) SUPPLY DIFFUSERS AND RETURN GRILLES IN CEILING AREAS WHERE CEILING GRID IS BEING REMOVED AND REPLACED. SAVE ALL (E) DIFFUSERS AND GRILLES FOR RE-INSTALLATION IN CEILING AND RE-CONNECTION TO (E) DUCTWORK. 2. STORM, HYDRONIC, DOMESTIC, WASTE AND VENT PIPING MAY BE ROUTED IN SPACE THAT IS NOT REPRESENTED, BUT IS TO REMAIN. OTHER SYSTEMS MAY EXIST WITHIN THE SPACE THAT ARE NOT REPRESENTED ON THESE DRAWINGS; MODIFICATIONS TO THESE SYSTEMS ARE NOT ANTICIPATED. 3. FIELD VERIFY ALL COMPONENTS PRIOR TO DEMOLITION. THE INFORMATION ON THIS SHEET WAS OBTAINED, IN PART, FROM HISTORIC DESIGN DRAWINGS. ONLY PORTIONS OF THE SYSTEMS WERE ACCESSIBLE FOR VISUAL CONFIRMATION DURING DESIGN PROCESS. 4. PROVIDE PRELIMINARY TESTING OF EXISTING HVAC DUCTWORK SYSTEMS. MEASURE CURRENT AIR FLOW RATES AT ALL EXISTING SUPPLY, RETURN, AND EXHAUST REGISTERS. MEASURE TOTAL AIR FLOWS AT MAIN DUCT BRANCHES. SUBMIT REPORT OF MEASURED VALUES TO ENGINEER FOR REVIEW AND CONFIRMATION OF SYSTEM DESIGN ASSUMPTIONS PRIOR TO DEMOLITION. 5. REMOVE ALL MECHANICAL ITEMS INDICATED. 6. SEAL ALL OPEN DUCTS DURING CONSTRUCTION TO MITIGATE DUST AND DEBRIS FROM SYSTEM. CAP DUCTWORK IN LOCATIONS THAT ARE NOT BEING RECONNECTED. 7. NOTIFY ENGINEER IMMEDIATELY OF ANY DISCREPANCIES OF INFORMATION REPRESENTED IN THE DOCUMENTS VERSUS WHAT IS FOUND IN THE FIELD. 8. COORDINATE PATCHING AND REPAIRS OF WALLS, CEILINGS AND FLOORS WITH ARCHITECT. DEMOLITION NOTES: CONSULTANT: ISSUE: OWNER: PROJECT: DRAWING INFORMATION: DRAWN BY: PROJECT NO: SHEET TITLE: APPROVED BY: CHECKED BY: SHEET OF 1 2 3 4 5 6 A B C D E 1 2 3 4 5 6 P 303.607.0977 www.hcm2.com 1331 Nineteenth Street Denver, CO. 80202 3/17/2016 4:10:34 PM C:\Revit Local Files\11529_Vail Mountain School_Central_rferrara.rvt VAIL MOUNTAIN SCHOOL VAIL MOUNTAIN SCHOOL Checker Author 11529.000 Approver 3000 BOOTH FALLS RD VAIL, CO 81657 3000 BOOTH FALLS RD VAIL, CO 81657 03/15/16 ISSUED FOR CONSTRUCTION DOCUMENTS ALBUQUERQUE | AVON | DENVER | FORT COLLINS 303.278.3820 www˛bgbuildingworks˛com Project No. xxxx.xx Copyright 2016 DRP JMH FIRST FLOOR DEMO PLAN M-2.0 MECHANICAL FIRST FLOOR DEMO PLAN 07/15/16