Loading...
HomeMy WebLinkAboutprint_page_06-21-2016_5769c7f5ea58e-0.pdfPERMITS MANAGEMENT Other plans routed to B16-0056 in Projectdox Other Fees added by Magnet - needs to be adjust off before issuing permit Revised Permits Management (B16- 0056.001) Fee Charges (14) Contacts (4) Contractors (1) Properties (1) Inspections (10) PROJECT Project Name:Vail Mountain School Library 2016 Goto Case Name:Library Renovation PROPERTY INFORMATION Properties:Primary: 3000 BOOTH FALLS RD (210102306001) DESCRIPTION Status:In Review Permit #:B16-0056.001 Submittal Date:06/20/2016 Issue Date: Last Inspection:Expiration Date: Permit Type:Construction Permit Subcases :Commercial Project Valuation:0.00 PROJECT DESCRIPTION Description of Work: New exterior door moved to side wall based on DRB requirement. AD-111, A-111, A-420 ADDITIONAL INFORMATION PARCEL DATA General Use Public/Semi-Public 1 PROJECT CRITERIA Zoning:Land Use: Lot Area:Lot Number: Fire Severity zone:100 year plain - Flood Hazard Zone: Route Type:Route To: Type: Construction Commercial Start Date: 06/20/2016 Status: In Review Show all 14 Fee Charges Item: Building Plan Review Fee Amount: $1,672.42 Fee Assessed By: Shelley Bellm Item: Mechanical Plan Review Fee Amount: $105.00 Fee Assessed By: Shelley Bellm Item: Building Permit Fee Amount: $2,572.95 Fee Assessed By: Florencio (JR) Mondragon Item: Construction Use Tax Fee Amount: $7,423.40 Fee Assessed By: Florencio (JR) Mondragon Item: Mechanical Permit Fee Amount: $420.00 Fee Assessed By: Florencio (JR) Mondragon Total Amount: $12,710.90 Amount Paid: $12,203.77 Amount Due: $507.13 Site Superintendent Owner Representative Property Owner Applicant Chris Evans ( Evans Chaffee Construction Group ) Email: cevans@evanschaffee.com EDIT Ragan Ferrara Email: rferrara@hcm2.com EDIT VAIL MOUNTAIN SCHOOL 3000 BOOTH FALLS RD VAIL, CO 81657- 4631 Email: EDIT Ragan Ferrara Email: rferrara@hcm2.com EDIT Evans Chaffee Construction Group Inc Date Exp: 04/30/2017 Status: Active Contractor #: CT-0062 State License #: Contractor Type: General [210102306001] 3000 BOOTH FALLS RD Snow Avalanche: No Land use: Public/Semi-Public Zone District Designation: General Use TOV Subdivision: VAIL MOUNTAIN SCHOOL SUBDIVISION Rock Fall: No Lot Number: 1 TOV Block: 100 year plain - Flood Hazard Zone: Debris Flow: No Lot Area: Public Works final Date: Status: Unscheduled Inspector: Results: Uninspected Batt insulation Date: Status: Unscheduled Inspector: View Documents (6) Tagged Cases (0) Activities (56) Revisions (1) Add Tag Standard Building Building Alteration/Repair Electronic PROJECT DATA BUILDING USES School Buildings 437 NON-RES Addition/Alteration BUILDING DESCRIPTION 2015 0 TOTAL VALUATION 0 381170 381170 CONDITIONS Route Type:Route To: Permit Type:Plan Check Type: Submittal Type: Number of Uses (#): Use: Occupancy Class: Occupant Load:Construction Class: Construction Type: New Floor Area (S.F.): Fire Sprinklers: Code Edition:Valuation: Total Current Valuation: Total Project Valuation: Previous Total Valuation: Number of Conditions: Show all 10 Inspections Inspector: Results: Uninspected Minor Framing Date: Status: Unscheduled Inspector: Results: Uninspected Stem wall Date: Status: Unscheduled Inspector: Results: Uninspected Footing Date: Status: Unscheduled Inspector: Results: Uninspected No Description uploaded on 06/21/2016 No Description uploaded on 06/21/2016 No Description uploaded on 05/24/2016 No Description uploaded on 05/24/2016 No Description uploaded on 05/24/2016 Show all 6 Documents print_page_06-21- 2016_5769c7454a237-0.pdf print_page_06-21- 2016_5769c6ae48c89-0.pdf print_page_05-24- 2016_5744a87d700be-0.pdf permit_card_05-24- 2016_5744a85c153c9-0.pdf fees_receipt_79908_2116_79908_05- 24-2016-1.pdf There are no Tagged Cases at this time. Fee Charged. Magnet has charged the fee Plumbing Plan Review Fee - Revision in the amount of $0 05:04:04 PM / Tue, Jun 21st, 2016 Carolyn Godfrey Fee Charged. Magnet has charged the fee Plumbing Permit Fee - Revision in the amount of $0 05:04:04 PM / Tue, Jun 21st, 2016 Carolyn Godfrey Fee Charged. Magnet has charged the fee Mechanical Plan Review Fee - Revision in the amount of $101.43 05:04:04 PM / Tue, Jun 21st, 2016 Carolyn Godfrey Fee Charged. Magnet has charged the fee Mechanical Permit Fee - Revision in the amount of $405.7 05:04:04 PM / Tue, Jun 21st, 2016 Carolyn Godfrey Fee Charged. Magnet has charged the fee Construction Use Tax Fee - Revision in the amount of $0 05:04:04 PM / Tue, Jun 21st, 2016 Carolyn Godfrey Show all 56 Activities Original - B16-0056