HomeMy WebLinkAboutB16-0029_A203 - ELEVATIONS_1478906103.pdfLEVEL 3
56' - 0"
LEVEL 4
66' - 0"
LEVEL 5 - 76
76' - 0"
LEVEL 6
86' - 0"
LEVEL 7
97' - 0"
LEVEL 8
108' - 0"
1
2 3 5 6 7 8 9 10 11 12
CORTEN AND PERFORATED METAL
SCREEN AT LEVEL 7 EGRESS STAIR
PREFINISHED METAL PANELING ON ALL
STAIR WINDOW BAYS
3 COAT STUCCO SYSTEM REPLACING
WOOD SIDING, TYP.
GLU-LAMS CLAD IN COPPER
3 COAT STUCCO SYSTEM
REPLACING WOOD SIDING,
TYP.
REPAIR AND REPAINT ALL
EXISTING RAILINGS
ZZZ
REMOVE WINDOWS IN STAIR TOWER;
FRAME OPENING AND FINISH W/ TWO LAYERS
GYP. INTERIOR AND PLYWOOD WITH WATER
RESISTANT MEMBRANE EXTERIOR
EGRESS STAIR TO BE REMOVED.
ALL CONNECTIONS TO BUILDING TO BE PATCHED. UNIT 700
DOOR TO STAIR TO BE REPLACED WITH WINDOW
LEVEL 1
36' - 0"
LEVEL 2
46' - 0"
LEVEL 3
56' - 0"
LEVEL 4
66' - 0"
LEVEL 5 - 76
76' - 0"
LEVEL 6
86' - 0"
LEVEL 7
97' - 0"
LEVEL 8
108' - 0"
CORRUGATED CORTEN CLADDING AT STAIR
TOWERS W/ METAL SHED ROOFS AND STEEL
MESH SURROUND AT UPPER LEVEL
ALL WOOD SIDING TO BE REPLACED W/ 3 COAT
STUCCO SYSTEM, TYP
RECESSED ELEVATED DECKS
WALLS TO BE 3 COAT STUCCO
SIDING
RECESSED ELEVATED DECKS TO BE
REPLACED, TREX OR SIM
EXISTING STEEL RAILINGS REPAIRED
AND REPAINTED
CORRUGATED CORTEN CLADDING AT STAIR
TOWERS W/ METAL SHED ROOFS AND STEEL MESH
SURROUND AT UPPER LEVEL - - WELDED FRAME
DOOR AT ENTRANCE TO ENCLOSURE
REMOVE WINDOWS IN STAIR TOWER;
FRAME OPENING AND FINISH W/ TWO LAYERS
GYP. INTERIOR AND PLYWOOD WITH WATER
RESISTANT MEMBRANE EXTERIOR
4'-2"
Scale
Date
Drawn By
Checked By
Project Number
1/8" = 1'-0"
2/22/2016 2:25:04 PM
A203
ELEVATIONS
VAIL SPA
CONDOMINIUMS
MEW
MEW
02/19/2016
VSRP - 2016
710 W. LIONSHEAD CIRCLE
1/8" = 1'-0"
1
EAST ELEVATION - NORTH SIDE
1/8" = 1'-0"
2
EAST ELEVATION - SOUTH SIDE
1
A203
2
A203
No. Description Date
1 PROGRESS/PRICIN
G
2 OCT
15
2 DRB REVIEW 12 OCT
15
3 PROGRESS/PRICIN
G 2
23 DEC
15
4 CDs/PERMIT 21 JAN
16
5 CDs/PERMIT 2 19 FEB
16
04/13/16