Loading...
HomeMy WebLinkAboutB16-0029_A203 - ELEVATIONS_1479389487.pdfLEVEL 3 56' - 0" LEVEL 4 66' - 0" LEVEL 5 - 76 76' - 0" LEVEL 6 86' - 0" LEVEL 7 97' - 0" LEVEL 8 108' - 0" 1 2 3 5 6 7 8 9 10 11 12 CORTEN AND PERFORATED METAL SCREEN AT LEVEL 7 EGRESS STAIR PREFINISHED METAL PANELING ON ALL STAIR WINDOW BAYS 3 COAT STUCCO SYSTEM REPLACING WOOD SIDING, TYP. GLU-LAMS CLAD IN COPPER 3 COAT STUCCO SYSTEM REPLACING WOOD SIDING, TYP. REPAIR AND REPAINT ALL EXISTING RAILINGS ZZZ REMOVE WINDOWS IN STAIR TOWER; FRAME OPENING AND FINISH W/ TWO LAYERS GYP. INTERIOR AND PLYWOOD WITH WATER RESISTANT MEMBRANE EXTERIOR EGRESS STAIR TO BE REMOVED. ALL CONNECTIONS TO BUILDING TO BE PATCHED. UNIT 700 DOOR TO STAIR TO BE REPLACED WITH WINDOW LEVEL 1 36' - 0" LEVEL 2 46' - 0" LEVEL 3 56' - 0" LEVEL 4 66' - 0" LEVEL 5 - 76 76' - 0" LEVEL 6 86' - 0" LEVEL 7 97' - 0" LEVEL 8 108' - 0" CORRUGATED CORTEN CLADDING AT STAIR TOWERS W/ METAL SHED ROOFS AND STEEL MESH SURROUND AT UPPER LEVEL ALL WOOD SIDING TO BE REPLACED W/ 3 COAT STUCCO SYSTEM, TYP RECESSED ELEVATED DECKS WALLS TO BE 3 COAT STUCCO SIDING RECESSED ELEVATED DECKS TO BE REPLACED, TREX OR SIM EXISTING STEEL RAILINGS REPAIRED AND REPAINTED CORRUGATED CORTEN CLADDING AT STAIR TOWERS W/ METAL SHED ROOFS AND STEEL MESH SURROUND AT UPPER LEVEL - - WELDED FRAME DOOR AT ENTRANCE TO ENCLOSURE REMOVE WINDOWS IN STAIR TOWER; FRAME OPENING AND FINISH W/ TWO LAYERS GYP. INTERIOR AND PLYWOOD WITH WATER RESISTANT MEMBRANE EXTERIOR 4'-2" Scale Date Drawn By Checked By Project Number 1/8" = 1'-0" 2/22/2016 2:25:04 PM A203 ELEVATIONS VAIL SPA CONDOMINIUMS MEW MEW 02/19/2016 VSRP - 2016 710 W. LIONSHEAD CIRCLE 1/8" = 1'-0" 1 EAST ELEVATION - NORTH SIDE 1/8" = 1'-0" 2 EAST ELEVATION - SOUTH SIDE 1 A203 2 A203 No. Description Date 1 PROGRESS/PRICIN G 2 OCT 15 2 DRB REVIEW 12 OCT 15 3 PROGRESS/PRICIN G 2 23 DEC 15 4 CDs/PERMIT 21 JAN 16 5 CDs/PERMIT 2 19 FEB 16 04/13/16