HomeMy WebLinkAboutB16-0029_A204 - ELEVATIONS_1478906106.pdfLEVEL 1
36' - 0"
LEVEL 2
46' - 0"
LEVEL 3
56' - 0"
LEVEL 4
66' - 0"
LEVEL 5 - 76
76' - 0"
LEVEL 6
86' - 0"
LEVEL 7
97' - 0"
G H
D
E
3 COAT STUCCO SYSTEM REPLACING ALL WOOD SIDED WALLS ON RECESSED BALCONIES
ELASTOMERIC PAINT ON PRECAST CONCRETE WALLS
1
A302
I F J K
1
A303
1
A307
GLU-LAM SUN SHADES CLAD IN
COPPER. (ALT.1 - REMOVE GLU-LAMS
AND PREP RACKING SYSTEM FOR
SOLAR THERMAL PANELS. RE: STUCT,
MECH.)
REMOVE WINDOWS IN STAIR TOWER;
FRAME OPENING AND FINISH W/ TWO LAYERS
GYP. INTERIOR AND PLYWOOD WITH WATER
RESISTANT MEMBRANE EXTERIOR
STAIR TOWER TO BE PAINTED WITH ELASTOMERIC PAINT TO MATCH ELEVATOR TOWERS
LEVEL 1
36' - 0"
LEVEL 2
46' - 0"
LEVEL 3
56' - 0"
LEVEL 4
66' - 0"
LEVEL 5 - 76
76' - 0"
LEVEL 6
86' - 0"
LEVEL 7
97' - 0"
D E
C B-1 B A
GLU-LAM SUN SHADES CLAD IN
COPPER. (ALT.1 - REMOVE GLU-LAMS
AND PREP RACKING SYSTEM FOR
SOLAR THERMAL PANELS. RE: STUCT,
MECH.)
PREFINISHED METAL CLADDING
AT ALL BAY WINDOWS
3 COAT STUCCO AT PENTHOUSES. (NOTE:
ALL WOOD SIDING TO BE REPLACED WITH
STUCCO)
1
A306
1
A303
CONCRETE PRECAST WALLS TO BE
FINISHED WITH ELASTOMERIC PAINT
STAIR TOWER CLAD WITH CORTEN STEEL
PANELS, WITH NEW METAL SHED ROOF,
SNOWCLIPS, AND SCREEN. TYP FOR (3) STAIR
TOWERS
POOL AREA WITH WOOD SLAT WALLS
AND METAL FENCING AROUND
EXISTING AND POOL YARD EXPANSION
RENOVATED ENTRY WITH TWO STORY
STOREFRONT GLASS, NEW AUTOMATIC
SLIDING GLASS DOORS, ROOF AND WALL
FEATURE
REMOVE WINDOWS IN STAIR TOWER;
FRAME OPENING AND FINISH W/ TWO LAYERS
GYP. INTERIOR AND PLYWOOD WITH WATER
RESISTANT MEMBRANE EXTERIOR
REPLACE AND RECONFIGURE ALL EXISTING
STOREFRONT FRAME AND GLAZING FROM
OFFICE/LOUNGE/CONFERENCE
ROOM/FITNESS ROOM AND INDOOR POOL
Scale
Date
Drawn By
Checked By
Project Number
1/8" = 1'-0"
2/22/2016 2:25:38 PM
A204
ELEVATIONS
VAIL SPA
CONDOMINIUMS
MEW
MEW
02/19/2016
VSRP - 2016
710 W. LIONSHEAD CIRCLE
1/8" = 1'-0"
1
SOUTH ELEVATION - EAST SIDE
1/8" = 1'-0"
2
SOUTH ELEVATION - WEST SIDE
1
A204
2
A204
No. Description Date
1 PROGRESS/PRICIN
G
2 OCT
15
2 DRB REVIEW 12 OCT
15
3 PROGRESS/PRICIN
G 2
23 DEC
15
4 CDs/PERMIT 21 JAN
16
5 CDs/PERMIT 2 19 FEB
16
04/13/16