Loading...
HomeMy WebLinkAboutB16-0029_A204 - ELEVATIONS_1479389489.pdfLEVEL 1 36' - 0" LEVEL 2 46' - 0" LEVEL 3 56' - 0" LEVEL 4 66' - 0" LEVEL 5 - 76 76' - 0" LEVEL 6 86' - 0" LEVEL 7 97' - 0" G H D E 3 COAT STUCCO SYSTEM REPLACING ALL WOOD SIDED WALLS ON RECESSED BALCONIES ELASTOMERIC PAINT ON PRECAST CONCRETE WALLS 1 A302 I F J K 1 A303 1 A307 GLU-LAM SUN SHADES CLAD IN COPPER. (ALT.1 - REMOVE GLU-LAMS AND PREP RACKING SYSTEM FOR SOLAR THERMAL PANELS. RE: STUCT, MECH.) REMOVE WINDOWS IN STAIR TOWER; FRAME OPENING AND FINISH W/ TWO LAYERS GYP. INTERIOR AND PLYWOOD WITH WATER RESISTANT MEMBRANE EXTERIOR STAIR TOWER TO BE PAINTED WITH ELASTOMERIC PAINT TO MATCH ELEVATOR TOWERS LEVEL 1 36' - 0" LEVEL 2 46' - 0" LEVEL 3 56' - 0" LEVEL 4 66' - 0" LEVEL 5 - 76 76' - 0" LEVEL 6 86' - 0" LEVEL 7 97' - 0" D E C B-1 B A GLU-LAM SUN SHADES CLAD IN COPPER. (ALT.1 - REMOVE GLU-LAMS AND PREP RACKING SYSTEM FOR SOLAR THERMAL PANELS. RE: STUCT, MECH.) PREFINISHED METAL CLADDING AT ALL BAY WINDOWS 3 COAT STUCCO AT PENTHOUSES. (NOTE: ALL WOOD SIDING TO BE REPLACED WITH STUCCO) 1 A306 1 A303 CONCRETE PRECAST WALLS TO BE FINISHED WITH ELASTOMERIC PAINT STAIR TOWER CLAD WITH CORTEN STEEL PANELS, WITH NEW METAL SHED ROOF, SNOWCLIPS, AND SCREEN. TYP FOR (3) STAIR TOWERS POOL AREA WITH WOOD SLAT WALLS AND METAL FENCING AROUND EXISTING AND POOL YARD EXPANSION RENOVATED ENTRY WITH TWO STORY STOREFRONT GLASS, NEW AUTOMATIC SLIDING GLASS DOORS, ROOF AND WALL FEATURE REMOVE WINDOWS IN STAIR TOWER; FRAME OPENING AND FINISH W/ TWO LAYERS GYP. INTERIOR AND PLYWOOD WITH WATER RESISTANT MEMBRANE EXTERIOR REPLACE AND RECONFIGURE ALL EXISTING STOREFRONT FRAME AND GLAZING FROM OFFICE/LOUNGE/CONFERENCE ROOM/FITNESS ROOM AND INDOOR POOL Scale Date Drawn By Checked By Project Number 1/8" = 1'-0" 2/22/2016 2:25:38 PM A204 ELEVATIONS VAIL SPA CONDOMINIUMS MEW MEW 02/19/2016 VSRP - 2016 710 W. LIONSHEAD CIRCLE 1/8" = 1'-0" 1 SOUTH ELEVATION - EAST SIDE 1/8" = 1'-0" 2 SOUTH ELEVATION - WEST SIDE 1 A204 2 A204 No. Description Date 1 PROGRESS/PRICIN G 2 OCT 15 2 DRB REVIEW 12 OCT 15 3 PROGRESS/PRICIN G 2 23 DEC 15 4 CDs/PERMIT 21 JAN 16 5 CDs/PERMIT 2 19 FEB 16 04/13/16