Loading...
HomeMy WebLinkAboutB16-0029_A401 - MAIN ENTRANCE STAIR_1478906134.pdf8 D C B-1 DD 1 A303 90 DEGREE MAGNETIC HOLD OPEN DOORS A401 3 GLASS WALL DRAIN FROM CANOPY AND ROOF ABOVE ROOF CANOPY ABOVE EXISTING PAVERS TO REMAIN REMOVE MAILBOXES - MOVE OFFICE DOOR NEW FRAMED WING WALL 2'-1 1/8" 2'-0" LEVEL 1 36' - 0" LEVEL 2 46' - 0" LEVEL 3 56' - 0" LEVEL 1 - GARAGE 35' - 0" LEVEL 1 CEILING 42' - 9" A401 4 A401 5 A401 7 A401 6 WOOD SLAT PANELING INTERIOR 3X6 WOOD SLAT CEILING EXISTING UNIT HEATER ENTRANCE CURTAIN WALL CEILING REF. RCPs BLOWN-IN POLY FULL DEPTH R-6.4 PER INCH ROOF FRAMING REF. STRUCTURAL ROOF SHEATHING REF. STRUCTURAL 1" MIN. RIGID INSULATION, SLOPED TOP 1/8"=1'-0" R5 PER INCH 1/2" USG SECUROCK GYPSUM-FIBER ROOF BOARD OR HYDROTECH EQUIV. AMERICAN HYDROTECH OR EQUAL 6125 WATERPROOFING (2 LA.) 1/8" ASPHALTIC PROTECTION BOARD OVER, SLOPED TO DRAIN AMERICAN HYDROTECH OR EQUAL SYSTEM FILTER 6" PREFINISHED METAL LEADER BOX AND DOWNSPOUT LEVEL 1 36' - 0" INTERIOR TILE SLIDING DOOR STOREFRONT THRESHOLD (REUSE/MATCH EXISTING) 1" FLOOR MORTAR BED REINFORCED CONCRETE 3" MIN. EXISTING EXTERIOR PAVERS LEVEL 2 46' - 0" LEVEL 2 GARAGE 45' - 0" CAN LIGHT DROPPED GYPSUM CEILING BLOCKING EXTERIOR MEMBRANE ROOF NEW 3 STUCCO ON EXISTING AND FRAMED WALL 3" LEVEL 1 36' - 0" LEVEL 2 46' - 0" LEVEL 3 56' - 0" LEVEL 2 GARAGE 45' - 0" C B-1 B LEVEL 1 CEILING 42' - 9" CABLE STRUT; REF. STRUCTURAL LEADER BOX AND 6x6" PREFINISHED METAL DOWN SPOUT ROOF DRAIN TO GRADE LEADER BOX AND 6x6" PREFINISHED METAL DOWNSPOUT DOWNSPOUT ROUTE UNDER SIDEWALK, TO DAYLIGHT DRAIN IN ADJACENT LANDSCAPING Scale Date Drawn By Checked By Project Number As indicated 4/4/2016 10:43:16 AM A401 MAIN ENTRANCE/STAIR VAIL SPA CONDOMINIUMS MEW MEW 02/19/2016 VSRP - 2016 710 W. LIONSHEAD CIRCLE 1/2" = 1'-0" 1 ENLARGED PLAN - MAIN ENTRANCE/STAIR 2 SOUTH MAIN ENTRANCE PERSPECTIVE 1/2" = 1'-0" 3 GLASS WALL 1 1/2" = 1'-0" 4 ENTRANCE ROOF DETAIL 1 1/2" = 1'-0" 5 ENTRANCE DOOR THRESHOLD DETAIL 1" = 1'-0" 6 ENTRY CANOPY SECTION 1" = 1'-0" 7 ENTRY ROOF WALL CONNECTION 1/2" = 1'-0" 8 FRONT ENTRANCE ELEVATION EPDM ROOF MEMBRANE OVER TREATED PLYWOOD OVER METAL DECK; RE: STRUCTURAL No. Description Date 1 PROGRESS/PRICIN G 2 OCT 15 2 DRB REVIEW 12 OCT 15 3 PROGRESS/PRICIN G 2 23 DEC 15 4 CDs/PERMIT 21 JAN 16 5 CDs/PERMIT 2 19 FEB 16 6" DOWNSPOUT FROM ABOVE 6" PREFINISHED LEADER BOX AND DOWNSPOUT 04/13/16