Loading...
HomeMy WebLinkAboutB16-0029_A601 - OUTDOOR POOL AREA DETAILS_1479389561.pdf6" UPPER JACUZZI DECK AT 18"AFF FOR ADA WHEELCHAIR TO TUB TRANSFER BUILT-IN STONE BENCH BEYOND EXPOSED AGGREGATE CONCRETE W/ SNOW-MELT PIPING GRAVEL BASE SITE / EARTH CAST-IN-PLACE CONCRETE COPING EDGE AT JACUZZI (CONTEMPORARY PROFILE T.B.D.) STAIR RISERS, FINISH T.B.D. STAIR TREADS, FINISH T.B.D. SNOW-MELT WITHIN BARRIER WALLS BEYOND 34' - 0" 35' - 6" EXPOSED AGGREGATE CONCRETE W/ SNOW-MELT PIPING LEVEL 1 36' - 0" 2 A602 POWDER COATED STEEL RAILING AT RAMP; HANDRAIL ON BOTH SIDES. POWDER COATED STEEL RAILING AT STAIRS; HANDRAIL ON BOTH SIDES. GRASS/LANDSCAPE ADDITION EXPOSED AGGREGATE CONCRETE W/ SNOW-MELT PIPING GRAVEL BASE SITE / EARTH CONCRETE PAD W/ SNOW- MELT PIPING STAIR RISERS, FINISH T.B.D. STAIR TREADS, FINISH T.B.D. SNOW-MELT WITHIN BARRIER WALLS BEYOND EXISTING CONCRETE FOOTER; USE AS PATIO & STAIR SUPPORT LEVEL 1 36' - 0" JACUZZI TUB CONCRETE FLOOR, EXISTING ADA WHEELCHAIR TO TUB TRANSITION AREA, MAX. 18"AFF WALL HEIGHT FINISH COPING AT TRANSITION AREA JACUZZI TUB BENCH JACUZZI TUB WATER LEVEL FINISH COPING EDGE AT JACUZZI TUB DECK (BULLNOSE PROFILE T.B.D.) JACUZZI TUB FINISH TILE, T.B.D. GRAVEL BASE STAIRS BEYOND 1'-6" 34' - 0" 32' - 6" SITE / EARTH EXPOSED AGGREGATE CONCRETE W/ SNOW-MELT PIPING 1'-6" 1'-4" REPAIR AND STUCCO DECK-SIDE FACE OF JACUZZI TUB 35' - 6" EXPOSED AGGREGATE CONCRETE PAVERS W/ SNOW-MELT PIPING AT POOL PATIO CAST-IN-PLACE CONCRETE COPING EDGE AT POOL DECK (CONTEMPORARY PROFILE T.B.D.) 3'-0" 5 1/8" GRAVEL BASE POOL WALL FINISH - REPAIR TILE AS NEEDED POOL FLOOR FINISH - REPAIR EXISTING TILE AS NEEDED EXISTING POOL HAND RAILING TO REMAIN - EXTEND BEYOND LAST TREAD 1' POOL WATER LEVEL STAIR TREAD & RISER, FINISHES - REPAIR TILE AS NEEDED EXISTING CONCRETE POOL BUILD 1'-0" LEVEL 1 36' - 0" EXISTING CONCRETE POOL DECK AND STAIRS TO BE REMOVED. EXPOSED AGGREGATE CONCRETE ON GRAVEL W/ SNOWMELT TO REPLACE OLD DECK PUBLIC OUTDOOR SPACE POOL & SPA OUTDOOR SPACE EXPOSED AGGREGATE CONCRETE W/ SNOW-MELT PIPING GRAVEL BASE GRADE BARRIER WALLS SHALL COMPLY WITH ADA GUIDELINES; FOUND IN IBC SECTION 3109 NON-SLAT WALLS REFINISHED WITH PRECAST TYP ELASTOSMERIC PAINT PAINT WALL BEHIND WOOD SLATS BLACK, TYP METAL CAP FLASHING 1x8 WOOD SLATS AT ALL GRADE SITE WALLS - 1/2" MAX SPACING - USE SCREWS FINISHED TO MATCH WOOD - FASTENED AT ENDS OF BOARDS VERTICAL TREAT 2X4 FOR WOOD SLATS, 24" O.C. NOTE: LOW PATIO WALLS SIMILAR: EXCEPTION: WOOD SLATS ON OUTSIDE OF PATIO WALL ONLY; INSIDE REFINISHED WITH PRECAST CONCRETE ELASTOMERIC TEXTURE AND PAINT 4" 2" 7 3/4" 2" MIN. CLEARANCE TO HARDSCAPE 4" MIN. CLEARANCE TO LANDSCAPE PROVIDE NEW STEP LIGHT AT EXISTING LIGHT LOCATIONS; PULL BOX TO LEAVE FACEPLATE FLUSH WITH OUTSIDE FACE OF CEDAR SLATS. (RFI-48) 1'-6" POOL & SPA PUBLIC OUTDOOR SPACE LEVEL 1 36' - 0" LOW BARRIER WALL TO DIVIDE PLANTER SPACE FROM POOL PATIO EXPOSED AGGREGATE CONCRETE W/ SNOW-MELT PIPING GRAVEL BASE SITE / EARTH PLANTER / LANDSCAPE SPACE BARRIER WALL BEYOND PLANTER SHRUB PROTECTION SCREEN? DRAINAGE PLATE SOD GRASS LAYER POOL PATIO WATERPROOFING BARRIER METAL FLASHING PLATE 1'-4" LEVEL 2 46' - 0" 6" UPPER JACUZZI DECK AT 18"AFF FOR ADA WHEELCHAIR TO TUB TRANSFER BUILT-IN STONE BENCH BEYOND EXPOSED AGGREGATE CONCRETE W/ SNOW-MELT PIPING GRAVEL BASE SITE / EARTH EXPOSED AGGREGATE CONCRETE W/ SNOW-MELT PIPING STAIRS, FINISHES T.B.D. SNOW-MELT WITHIN BARRIER WALLS BEYOND 34' - 0" 35' - 6" EXISTING STRUCTURE OF BOILER STACK W/ NEW WOOD BOARD FINISH EXISTING METAL TOP CAP TO REMAIN Scale Date Drawn By Checked By Project Number As indicated 7/11/2016 9:01:37 AM A601 OUTDOOR POOL AREA DETAILS VAIL SPA CONDOMINIUMS MEW BU/MEW 02/19/2016 VSRP - 2016 710 W. LIONSHEAD CIRCLE 1" = 1'-0" 1 PATIO STAIR 1 1" = 1'-0" 2 PATIO STAIR 2 1" = 1'-0" 3 PATIO STAIR 3 1" = 1'-0" 4 PATIO SURROUNDING JACUZZI 1" = 1'-0" 5 POOL STAIRS 1" = 1'-0" 8 OUTDOOR POOL ENCLOSURE WALL - LOW GRADE PATIO WALLS, SIM 1 1/2" = 1'-0" 6 BARRIER WALL W/ GLASS TOP DETAIL 1" = 1'-0" 7 PATIO TO PLANTER TRANSITION 1" = 1'-0" 9 BOILER STACK No. Description Date 1 PROGRESS/PRICIN G 2 OCT 15 2 DRB REVIEW 12 OCT 15 3 PROGRESS/PRICIN G 2 23 DEC 15 4 CDs/PERMIT 21 JAN 16 5 CDs/PERMIT 2 19 FEB 16 6 ASI#2 - OUTDOOR POOL 19 MAY 16 7 TILE/CARPET SKETCH 16 JUNE 16 8 ASI#2 REV. 2 OUTDOOR POOL 7 JULY 16 11/16/16