HomeMy WebLinkAboutB16-0029_E1.0_1479389569.pdfT
18[(4 #500 MCM AL)3 1/2"C]
UTILITY
TRANSFORMER
PAD MOUNTED
HOUSE DISTRIBUTION CENTER "HDC"
3000A, 120/208V, 3P, 4W
42kAlC
2500/3
FRN-R
(3)2500A
HOLY CROSS
METER# 95758
MAX DEMAND:
257KW FEB 2011
800/3
KRP-C
(3)800A
1200/3
KRP-C
(3)1000A
100/3
FRN-R
(3)100A
400/3
FRN-R
(3)250A
DH14 HA HB HD HE DH
(SPARE)
PH KITCHEN
H20 HEAT
AH SPARE KP2 KP1
100/3
FRN-R
(3)100A
200/3
FRN-R
(3)200A
400/3
FRN-R
(3)400A
400/3
FRN-R
(3)400A
200/3
FRN-R
(3)200A
200/3
FRN-R
(3)200A
200/3
FRN-R
(3)200A
200/3
FRN-R
(3)200A
200/3
FRN-R
(3)200A
200/3
FRN-R
(3)200A
200/3
FRN-R
(3)200A
200/3
FRN-R
(3)200A
200/3
FRN-R
(3)200A
200/3
FRN-R
(3)200A
100/3
FRN-R
(3)100A
WEST METERBANK "WEST MB"
1200A, 120/208V, 3P, 4W
42kAlC
EAST SLOPESIDE METERBANK "EAST SS MB"
1200A, 120/208V, 3P, 4W
42kAlC
EAST POOL SIDE METERBANK "EAST PS MB"
1200A, 120/208V, 3P, 4W
42kAlC
1200/3
KRP-C
(3)1000A
600/3
FRN-R
(3)600A
HOLY CROSS
METER# 94722
MAX DEMAND:
19.5KW DEC 2009
ADDITION
TO MAIN
SERVICE
3[(3 #500 MCM AL, 1 #3/0 NEU. AL, 1 #2/0 CUG)3 1/2"C]
3[(3 #500 MCM AL, 1 #3/0 NEU.
AL, 1 #2/0 CUG)3 1/2"C]
3[(3 #400 MCM AL, 1 #2/0 NEU. AL, 1 #1/0 CUG)3 1/2"C]
2[(3 #500 MCM AL, 1 #3/0 NEU. AL, 1 #2/0 CUG)3 1/2"C]
5000A, 120/208V, 3P, 4W
65kAlC
ELEVATOR #1
15 FLA, 480V 3P
ST
60/3
(3 #3/0 CU, 1 #6 CUG)2"C
EXISTING
(3 #1 CU, 1 #8 CU G)1-1/2"C
EXISTING
15 KVA 208V
TO 480V 3P
(3 #6 CU, 1 #10 CUG)1"C
(3 #8 CU, 1 #8 CUG)1"C
#8 CU
ELEVATOR #1
15 FLA, 480V 3P
ST
60/3
15 KVA
208V TO
480V 3P
#8 CU
ELEVATOR #1
15 FLA, 480V 3P
ST
60/3
15 KVA
208V TO
480V 3P
#8 CU
EM(E)
PANEL
ST
60/2
ELEVATOR
PANEL
ELEVATOR
PANEL
ST
60/2
(3 #6 CU, 1 #10 CUG)1"C
(3 #6 CU, 1 #10 CUG)1"C
49944,AIC
X
59,600 AIC
X
37000 AIC
X
<10K AIC
X
<10K AIC
X
<10K AIC
X
<10K AIC
X
<10K AIC
X
<10K AIC
X
<10K AIC
X
<10K AIC
X
<10K AIC
X
NEW WORK IS CLOUDED
REST IS EXISTING
P
PANEL
P1
PANEL
POOL
PANEL
<10K AIC
X
<10K AIC
X
<10K AIC
X
(4 #350 AL, 1 #1/0 ALG)3"C (4 #4/0 AL, 1 #2 ALG)2"C
RELOCATE EXISTING PANEL
EXTEND FEEDER AS REQUIRED
REFERENCE PANEL SCHEDULE FOR NEW
LOADS
PROVIDE FEED THROUGH LUGS TO
FEED PANEL P1. REFERENCE PANEL
SCHEDULE FOR NEW LOADS
equipment, etc. furnish by mechanical - refer to both electrical and
electrical apparatus as shown on single line diagram and
and mechanical drawing for scope and work and additinal infor-
Complete connection of HVAC/Plumbing motor(s), water heater(s),
Fire alarm system will be by others.
Complete provision, installation and connection of lighting fixtures,
exit signs and lamps as specified and as shown on drawings.
Complete branch circuit wiring required for the connection of
emergency lighting and exit signs to existing emergency stand
Complete feeder(s) installation as required for new and/or
devices, new control devices, etc. for a complete lighting and
including new panelboards, new conduits, new wires, new wiring
Complete wiring system for new lighting and power as shown,
contract. Electrical work shall include, but not limited to, these major
as indicated on drawing and as specified, as necessary to complete the
SCOPE: Furnish all materials and labor required to execute this work
2.
3.
4.
6.
5. Provide grounding and bonding Facilities.
Complete all electrical demolition as required.
mation.
A.
ELECTRICAL SPECIFICATIONS
1.
drawings.
by power system.
and power system.
b.
a.
items:
A. Contractor shall submit shop drawings for engineer review and approval.
MC cable permitted per local codes. Run hard pipe from panel to local
Lighting fixtures.
Shop drawing submittal shall include:
Panelboard(s).
CONDUIT AND WIRE:
B.
13.
A.
B.
2.
1.
and contractor shall have written approvals from building owner prior
Core drilling and patching of existing building structure required for
Operating, Maintenance and identification instructions manuals, if
electrical work. Core drilling shall follow Building Standard procedures
Applicable codes: National Electric Code (2011)
PERMITS AND FEES: Obtain and pay for all necessary permits, inspec-
tions, examinations and fees or charges necessary for execution and
and to the requirements of Federal, State or other City agencies
Town of Vail Electrical Code, pertinent NFPA publications
Conform to the prevailing edition and amendments thereto of the
SHOP DRAWINGS AND SUBMITTAL:
to start of any work.
Test of entire system and work.
REGULATIONS AND CODES:
having jurisdiction.
completion of electrical work.
12.
11.
A.
7.
9.
8.
10.
any.
A. General Requirements
14.
decora style, 15 amp will be acceptable for Residences.
Convenience receptacles will be 20 amp, commercial grade
Light switches will be 20 amp, commercial grade,
B.
ELECTRICAL DEVICES
A.
decora style. Finish per owner or architect.
Provide decora style, finish per owner or architect.
Dimming switches will be a minimum of 600w or as noted.
C.
15.
Support all electrical equipment independent of accessible ceilings as
required by NEC.
SUPPORT
A.
All mounting heights will conform to ADA guidelines. Typical receptacle
D.
heights will be +18"AFF and switch heights will be +46"AFF
unless noted otherwise.
16.
At fire rated wall space electrical boxes at opposite sides of the wall
no less than 24" horizontal distance.
ELECTRICAL BOXES
A.
When phone, TV & power receptacles are shown on plan next to each other.
Locate respective receptacles next to each other on site with no more
B.
than 1" seperating cover plates.
Provide GFI type receptacles at kitchens, bathrooms,
garages, exterior etc. as required by code.
E.
H/P HEAT/PHOTOELECTRIC SMOKE DETECTOR
ELECTRICAL LEGEND
(NOT ALL SYMBOLS REQUIRED FOR THIS PROJECT)
RECESSED OR SURFACE DOWNLIGHT
WALL MOUNTED LIGHT FIXTURE
RECESSED FLUOR. LIGHT FIXTURE
SURFACE FLUOR. LIGHT FIXTURE
Aa
Aa
FIXTURE DESIGNATIONS:
UPPER CASE - FIXTURE TYPE
LOWER CASE - SWITCH DESIGNATION
SHADING ON FIXTURE INDICATES EMERG. BATTERY BACKUP
FLUORESCENT STRIP FIXTURE
TRACK LIGHT AS NOTED OR SCHEDULED
WALL WASHER
POLE-MOUNTED FIXTURE
POST (BOLLARD) FIXTURE
CEILING OR WALL MOUNTED EXIT LIGHT
EMERGENCY BATTERY LIGHTS
DUPLEX RECEPTACLE @ 18" UNLESS NOTED
DOUBLE DUPLEX RECEPTACLE @ 18" UNLESS NOTED
SPECIAL OUTLET AS NOTED
FLUSH FLOOR DUPLEX RECEPTACLE
DUPLEX RECEPTACLE HALF-SWITCHED @ 18" UNLESS NOTED
TELE-POWER POLE
JUNCTION BOX IN FLOOR, CEILING OR IN WALL
MULTI-OUTLET PLUG STRIP
COMPUTER/TELEPHONE OUTLET IN FLOOR OR WALL
CONDUIT RUN CONCEALED IN WALL OR ABOVE CEILING
TELEPHONE BACKBOARD
CIRCUIT HOMERUN
CONDUIT RUN BELOW FLOOR OR GRADE
CONDUIT STUB-UP - CAP & MARK
LIGHT SWITCH AT 46" UNLESS NOTED
SUBSCRIPTS:
2 = 2-POLE SWITCH
3 = 3-WAY SWITCH
4 = 4-WAY SWITCH
K = KEY-OPERATED SWITCH
TO = THERMAL OVERLOAD SWITCH
P = SWITCH WITH PILOT LIGHT
DIMMER SWITCH W/ WATTAGE
MAGNETIC MOTOR STARTER
DISCONNECT SWITCH
TRANSFORMER
GROUND
PUSHBUTTON CONTROL STATION
PHOTOELECTRIC CELL
TIME SWITCH
THERMOSTAT AT 60" UNLESS NOTED
DIVISION 15 EQUIPMENT
CIRCUIT BREAKER
MOTOR OUTLET
AUTOMATIC TRANSFER SWITCH
FOOD SERVICE EQUIPMENT
PC
TS
T
ABBREVIATIONS
- ABOVE COUNTER
AC
AFF - ABOVE FINISHED FLOOR
- ABOVE FINISHED GRADE
AFG
- ALUMINUM
AL
- EMERGENCY
EM
- GROUND
GND
- GROUND FAULT INTERRUPTER
GFI
NIC - NOT IN CONTRACT
NL - NIGHT LIGHT
NTS - NOT TO SCALE
UG - UNDERGROUND
WP - WEATHER PROOF
XFMR - TRANSFORMER
+18" - MOUNTING HEIGHT TO CENTERLINE
OF DEVICE AFF OR AFG
FIRE ALARM SYSTEM
FIRE ALARM CONTROL PANEL
FIRE ALARM ANNUNCIATOR PANEL
FIRE ALARM PULL STATION
ALARM HORN OR SPEAKER
COMBINATION HORN/STROBE OR SPEAKER/STROBE
THERMAL HEAT DETECTOR
H
SMOKE/IONIZATION DETECTOR
I
PHOTOELECTRIC SMOKE DETECTOR
P
DUCT DETECTOR
SPRINKLER SYSTEM FLOW SWITCH
SPRINKLER SYSTEM TAMPER SWITCH
STROBE
SMOKE/FIRE DAMPER CONNECTION
REMOTE INDICATOR LIGHT
COMMUNICATION SYSTEM
SPEAKER IN CEILING OR WALL
VOLUME CONTROL AT 60" UNLESS NOTED
MICROPHONE OUTLET IN FLOOR BOX OR WALL
CALL-IN SWITCH
PROGRAM BELL
INTERCOM
CLOCK
AMPLIFIER
TELEVISION OUTLET
CONTACT DOOR SWITCH IN JAMB OR HINGE
SECURITY SYSTEM
KEY-OPERATED ACCESS SWITCH
SURVEILLANCE CAMERA
DISTRIBUTION EQUIPMENT SYMBOLS
DISCONNECT SWITCH
FUSES
CIRCUIT BREAKER
CURRENT TRANSFORMER
TRANSFORMER
METER
CU - COPPER
STEP LIGHT
FACP
M = MOTION-OPERATED SWITCH
POP-UP RECEPTACLE
- ELECTRICAL CONTRACTOR
EC
- AUTHORITY HAVING JURISDICTION
AHJ
- MECHANICAL CONTRACTOR
MC
- PLUMBING CONTRACTOR
PC
UTP - UNSHIELDED TWISTED PAIR
- GENERAL CONTRACTOR
GC
- REFERENCE
REF
junction box, and run MC cable from junction box to device.
CONDUCTOR SIZES AND TYPES: For sizes #1/0 AWG and larger, use
coppper THW or aluminum XHHW. For sizes #1 AWG and smaller, use only
copper wire with 600V insulation, types TW, THHN, or THW - stranded in
sizes #8 and larger, solid in sizes #10 and smaller. Control wiring shall be #14,
stranded. Use type THHN for wires entering or passing through fluorescent
lighting fixtures. All motors shall be wired with copper conductors only.
UNO - UNLESS NOTED OTHERWISE
Provide tamper proof receptacles at all residential
areas as required by code.
F.
17. METERING
A. EC shall coordinate whether or not meters require lever bypass with local
utility and provide all meters with a lever bypass when required.
CEILING MOUNT MOTION SENSOR
Finish per owner or architect.
of
Drawn By: Checked By:
DATE: ISSUE:
PROGRESS
AEC PROJECT #: VAIL SPA
CONDOMINIUMS
710 W. LIONSHEAD CIRCLE
16057
07/25/16
www.aec-vail.com
CMechanical, Electrical & Lighting Design Services
Architectural Engineering Consultants
Telephone:
970-748-8520
E
G$Q 2IILFH ZLWK /((' $FFUHGLWHG 3URIHVVLRQDOV
PERMIT
07/29/16
51* #'%
'.'%64+%#.
10'Ä.+0'
&+#)4#/
'
11/16/16