HomeMy WebLinkAboutB16-0029_P S 13_1478906235.pdfLAYDOWN /
STAGING AREA
Phase 1.1 - 4/11/16 - 7/21/16
Window Replacement: 5/27/16 - 7/15/16
PHASE 1: 4/11/16 - 9/02/16
Phase 1.2 - 5/03/16 - 8/12/16
Window Replacement: 6/10/16 - 7/29/16
PHASE 2 - 6/01/16 - 11/18/16
Phase 1.1
- Open to
the Public
Phase 1.2
Phase 1.3 Public Area -
Renovate
Staging Area
on Existing
Tennis Court -
Enclose with
Fence While
Phase 2 is
Occupied
Staging
Area
Access
Road No Heavy
Equipment Allowed
On Parking
Structure
Phase 1 Staging Area
Fire Department Emergency
Access. Keep one lane clear at
all times. Access zone is 45' (l) x
10' (w) at narrowest point
Construction Logistic & Public Safety Plan - Phase D: 7/21/16 - 8/11/16
Phase 2.2
- Closed
to the
Public
Phase 2.1 - 6/01/16 - 10/28/16
Window Replacement: 8/12/16 - 9/30/16
Phase 2.2 - 6/15/16 - 11/18/16
Window Replacement: 8/26/16 - 10/21/16
PUBLIC AREA - 4/11/16 - 10/19/16
Storefront / Entry - 4/11/16 - 6/28/16
Indoor Pool/Locker Rooms -
4/18/16 - 7/29/16
2nd Level Restrooms - 8/1/16 -
10/19/16
Muster
Point -
South
Muster Point
- East
East Construction
Access
Delivery /
Unloading Zone
04/13/16