Loading...
HomeMy WebLinkAboutB16-0029_P S 13_1479389530.pdfLAYDOWN / STAGING AREA Phase 1.1 - 4/11/16 - 7/21/16 Window Replacement: 5/27/16 - 7/15/16 PHASE 1: 4/11/16 - 9/02/16 Phase 1.2 - 5/03/16 - 8/12/16 Window Replacement: 6/10/16 - 7/29/16 PHASE 2 - 6/01/16 - 11/18/16 Phase 1.1 - Open to the Public Phase 1.2 Phase 1.3 Public Area - Renovate Staging Area on Existing Tennis Court - Enclose with Fence While Phase 2 is Occupied Staging Area Access Road No Heavy Equipment Allowed On Parking Structure Phase 1 Staging Area Fire Department Emergency Access. Keep one lane clear at all times. Access zone is 45' (l) x 10' (w) at narrowest point Construction Logistic & Public Safety Plan - Phase D: 7/21/16 - 8/11/16 Phase 2.2 - Closed to the Public Phase 2.1 - 6/01/16 - 10/28/16 Window Replacement: 8/12/16 - 9/30/16 Phase 2.2 - 6/15/16 - 11/18/16 Window Replacement: 8/26/16 - 10/21/16 PUBLIC AREA - 4/11/16 - 10/19/16 Storefront / Entry - 4/11/16 - 6/28/16 Indoor Pool/Locker Rooms - 4/18/16 - 7/29/16 2nd Level Restrooms - 8/1/16 - 10/19/16 Muster Point - South Muster Point - East East Construction Access Delivery / Unloading Zone 04/13/16