Loading...
HomeMy WebLinkAboutB16-0029_P S 4_1479389541.pdf1 2 8 9 10 11 12 13 14 14 15 16 17 G G H H D D E E C C B-1 B-1 B B A A RR QQ PP NN I I F F J J K K BB AA CC DD EE HH GG FF JJ KK LL MM 32'-6 1/4" 32'-6 1/4" 32'-6 1/4" 32'-6 1/4" UUU XXX UNIT 303 UNIT 301LL UNIT 305LL UNIT 309LL UNIT 307UL UNIT 313 UNIT 319 UNIT 321UL UNIT 317LL UNIT 315LL UNIT 311LL UNIT 302LL UNIT 304 UNIT 308LL UNIT 312 UNIT 310LL UNIT 314LL UNIT 316LL UNIT 320LL UNIT 322LL UNIT 326LL UNIT 324 UNIT 318 UNIT 306LL EGRESS STAIR TO BE REMOVED. ALL CONNECTIONS TO BUILDING TO BE PATCHED. UNIT 700 DOOR TO STAIR TO BE REPLACED WITH WINDOW. MAINT. OFFICE BUILDING STANDARD UTILITY DOOR BUILDING STANDARD UTILITY DOOR BUILDING STANDARD UTILITY DOOR BUILDING STANDARD UTILITY DOOR BUILDING STANDARD UTILITY DOOR REPLACE TRAFFIC COATING ON EXTERIOR LANDINGS; REPAIR/REPAINT RAILINGS; COVER GLULAM WITH COPPER AND COUNTER FLASH UNDER TRAFFIC COATING REPLACE TRAFFIC COATING ON EXTERIOR LANDINGS; REPAIR/REPAINT RAILINGS; COVER GLULAM WITH COPPER AND COUNTER FLASH UNDER TRAFFIC COATING Scale Date Drawn By Checked By Project Number 1/16" = 1'-0" 1/27/2016 12:55:02 PM A113 LEVEL 3 FINISH PLAN VAIL SPA CONDOMINIUMS MEW MEW 01/21/2016 VSRP - 2016 710 W. LIONSHEAD CIRCLE 1/16" = 1'-0" 1 LEVEL 3 FINISH PLAN GENERAL PLAN NOTES 1. ALL DIMENSIONS ARE TO FACE OF STUD U.N.O. 2. FURNITURE IS NIC, U.N.O. 3. ALL BUILDING AREAS SHALL BE FULLY SPRINKLERED PER NFPA-13. SPRINKLER PROTECTION SHALL BE PROVIDED FOR EXT BALCONIES AND IN ROOF TRUSSES AND OTHER SPACES REQ'D BY CODE. PROVIDE A DRY OR GLYCOL SYSTEM FOR RF TRUSSES AND GARAGE AND OTHER UNCONDITIONED AREAS. 4. PARKING LEVEL SHALL BE FULLY SPRINKLERED PER NFPA-13. 5. COORDINATE LOCATION OF EXISTING KNOX BOXES WITH FIRE DEPT- 2 EXISTING BOXES ARE AT FDC LOCATIONS 6. PENETRATIONS AT DOUBLE-T AND TOPPING GARAGE LID SHALL BE COORDINATED WITH STRUCTURAL. 7. PENETRATIONS AT ROOF TOP UNITS & MAKE-UP AIR UNITS SHALL BE COORDINATED WITH MECHANICAL CONTRACTOR FOR SIZE AND LOCATION. 8. DIM FROM EDGE OF DOOR FRAME TO EDGE OF ADJACENT PERPENDICULAR WALL SHALL BE 4" U.N.O. 9. DRYWALL PART'NS BTWN CONDITIONED OCCUPIED SPACES & GARAGE SHALL HAVE VAPOR BARRIER ON WARM SIDE (AIR INFIL. BARRIER ON EXT. WHERE SIDING SHOWN). 10. ALL PART'NS IN OR ADJACENT TO PARKING GARAGE TO BE CONSTRUCTED ON A 5 1/2" x 6" CONC CURB, RE: X/A5.04. 11. ALL BUILDING UTILITY DOORS SHALL BE EITHER REPLACED IN-KIND W/ REGARD TO RATINGS, HARDWARE, AND FINISHES, OR KEPT AS-IS. DETERMINED CASE BY CASE - SEE LOCATIONS ON PLANS 12. ALL CORRIDOR/PARTITIONS SHALL BE ACOUSTICALLY CONSTRUCTED TO MATCH EXISTING, U.N.O 13. WHERE "CLEAR" IS CALLED OUT ON A DIMENSION, PROVIDE DIM NOTED FROM FACE OF FINISH TO FACE OF FINISH. 14. ALL LOAD-BEARING STEEL COLUMNS SHALL BE 1-HOUR RATED PER STRUCTURAL DRAWINGS 15. ALL STRUCT STL BEAMS (EXCEPT AT BALCONIES) TO BE 1-HR RATE OR MATCH EXISTING 16. REFER TO DETAILS FOR SPECIFIC OR PROPOSED FLOOR TRANSITIONS 17. 406.2.2, IBC. CLEAR HEIGHT. THE CLEAR HEIGHT OF EACH FLOOR LEVEL IN VEHICLE AND PEDESTRIAN TRAFFIC AREAS SHALL NOT BE LESS THAN 7 FEET (2134 MM). VEHICLE AND PEDESTRIAN AREAS ACCOMMODATING VAN-ACCESSIBLE PARKING REQUIRED BY SECTION 1106.5 SHALL CONFORM TO ICC A117.1. 8'-2" MIN. CLEAR HEIGHT 18. PROVIDE PRECAST SPLASH BLOCK @ ALL DOWNSPOUTS TERMINATING IN LANDSCAPE OR ON FLAT MEMBRANE ROOFS. 19. ALL COLUMNS SHALL BE INDIVIDUALLY PROTECTED FOR 1-HR RATING, WHEN PART OF PARTITION ASSEMBL No. Description Date 1 PROGRESS/PRICIN G 2 OCT 15 2 DRB REVIEW 12 OCT 15 3 PROGRESS/PRICIN G 2 23 DEC 15 4 CDs/PERMIT 21 JAN 16 Construction Logistic & Public Safety Plan: 4/11/16 - 5/31/16 EMERGENCY EGRESS Stair Core 5 Stair Core 3 Phase 1 closed to public. Maintain paths of egress for construction personnel CLOSED TO PUBLIC 04/13/16