HomeMy WebLinkAboutB16-0029_P S 7_1478906272.pdfDN
UP
DN
UP
DN
DN
FD FD FD
FD
FD
FD
FD FD FD
FD
FD
A204
A202
A201 2
1
1
1
2
3
5
6
8
9
10
11
12
13
14
16
G H
D
D E
C
C
B-1
B-1
B
B
A
A
A203
2
RR
NEW ADA
POOL LIFT
NEW ADA POOL LIFT
NEW ADA ACCESS RAMP
ADA COMPLIANT LOCKER ROOMS, SHOWERS, AND
TOILETS, SEE ENLARGED PLANS A404 AND A405
A201
1
A202
2
A204
2
QQ
PP
NN
WOOD SLATING AT ALL GRADE SITE WALLS WITH
METAL CAP FLASHING. AREAS OF WALLS BELOW 52"
TO BE TALLER WITH BLOCK AND GLASS, WHERE
REQUIRED
EXISTING CONCRETE POOL DECK AND
STAIRS TO BE REMOVED. PAVERS ON
SAND BED WITH SNOWMELT TO
REPLACE OLD DECK
NEW SOD AND PLANTING AREA
NEW POOL SITE WALLS W/ WOOD SLATS AND
METAL CAP FLASHING (METAL FENCE AREAS, TBD.)
A600
1
EXISTING
FIREPIT
EXISTING GRASS
AREA
NEW ACCESSIBLE POOL ENTRY
GATE AND PATH
I F J K
BB
AA
CC
DD
EE
HH GG
FF
JJ
KK LL MM 9'-0"
20'-0"
20'-0"
20'-0"
23'-0"
23'-0"
22'-9"
25'-7"
26'-8" 5'-0" 12'-0" 16'-0" 25'-6" 25'-6" 19'-7" 12'-8 3/4" 14'-10 1/4" 5'-0" 12'-0"
174'-10" 12'-0"5'-0"
A205
1
23'-0"23'-0"
22'-11 3/4"
12'-0"5'-0"14'-10 1/4"12'-8 3/4"
13'-0"23'-0"
5'-5"
REPAIR POOL AND HOT TUB AS NEEDED
IN BASIN; NEW POOL COPING
THROUGHOUT.
NEW ENTRY ROOF AND
VESTIBULE
A310
1
A210
3
A210
4
A210 5
A210
6
A210
7
A212
8
A213
3
A213 1A213 4
UUU
XXX
ZZZ
NEW 90DEG HOLD
OPEN DOORS FOR
STAIRWELL TO LOBBY
UNIT
111
UNIT
105
UNIT
101
UNIT
115
UNIT
102
UNIT
104
UNIT
106
UNIT
113LL
UNIT
109LL
UNIT
107LL
UNIT
103LL
A401
8
FRONT
ENTRANCE
ELEVATION CONC. STEP
CONC. STEP
CONC. STEP
CONC. STEP
CONC. STEP
CONC.
STEP
CONC.
STEP
CONC.
STEP
CONC.
STEPCONC.
STEPCONC.
STEPCONC.
STEP
PLANTING
Scale
Date
Drawn By
Checked By
Project Number
1/16" = 1'-0"
1/27/2016 12:54:09 PM
A101
LEVEL 1 PLAN
VAIL SPA
CONDOMINIUMS
MEW
MEW
01/21/2016
VSRP - 2016
710 W. LIONSHEAD CIRCLE
1/16" = 1'-0"
1
LEVEL 1 FLOOR PLAN
GENERAL PLAN NOTES
1. ALL DIMENSIONS ARE TO FACE OF STUD U.N.O.
2. FURNITURE IS NIC, U.N.O.
3. ALL BUILDING AREAS SHALL BE FULLY SPRINKLERED PER
NFPA-13. SPRINKLER PROTECTION SHALL BE PROVIDED FOR EXT
BALCONIES AND IN ROOF TRUSSES AND OTHER SPACES REQ'D
BY CODE. PROVIDE A DRY OR GLYCOL SYSTEM FOR RF TRUSSES
AND GARAGE AND OTHER UNCONDITIONED AREAS.
4. PARKING LEVEL SHALL BE FULLY SPRINKLERED PER NFPA-13.
5. COORDINATE LOCATION OF EXISTING KNOX BOXES WITH FIRE
DEPT- 2 EXISTING BOXES ARE AT FDC LOCATIONS
6. PENETRATIONS AT DOUBLE-T AND TOPPING GARAGE LID SHALL
BE COORDINATED WITH STRUCTURAL.
7. PENETRATIONS AT ROOF TOP UNITS & MAKE-UP AIR UNITS
SHALL BE COORDINATED WITH MECHANICAL CONTRACTOR FOR
SIZE AND LOCATION.
8. DIM FROM EDGE OF DOOR FRAME TO EDGE OF ADJACENT
PERPENDICULAR WALL SHALL BE 4" U.N.O.
9. DRYWALL PART'NS BTWN CONDITIONED OCCUPIED SPACES &
GARAGE SHALL HAVE VAPOR BARRIER ON WARM SIDE (AIR INFIL.
BARRIER ON EXT. WHERE SIDING SHOWN).
10. ALL PART'NS IN OR ADJACENT TO PARKING GARAGE TO BE
CONSTRUCTED ON A 5 1/2" x 6" CONC CURB, RE: X/A5.04.
11. ALL BUILDING UTILITY DOORS SHALL BE EITHER REPLACED
IN-KIND W/ REGARD TO RATINGS, HARDWARE, AND FINISHES, OR
KEPT AS-IS. DETERMINED CASE BY CASE - SEE LOCATIONS ON
PLANS
12. ALL CORRIDOR/PARTITIONS SHALL BE ACOUSTICALLY
CONSTRUCTED TO MATCH EXISTING, U.N.O
13. WHERE "CLEAR" IS CALLED OUT ON A DIMENSION, PROVIDE DIM
NOTED FROM FACE OF FINISH TO FACE OF FINISH.
14. ALL LOAD-BEARING STEEL COLUMNS SHALL BE 1-HOUR RATED
PER STRUCTURAL DRAWINGS
15. ALL STRUCT STL BEAMS (EXCEPT AT BALCONIES) TO BE 1-HR
RATE OR MATCH EXISTING
16. REFER TO DETAILS FOR SPECIFIC OR PROPOSED FLOOR
TRANSITIONS
17. 406.2.2, IBC. CLEAR HEIGHT. THE CLEAR HEIGHT OF EACH FLOOR
LEVEL IN VEHICLE AND PEDESTRIAN TRAFFIC AREAS SHALL NOT
BE LESS THAN 7 FEET (2134 MM). VEHICLE AND PEDESTRIAN
AREAS ACCOMMODATING VAN-ACCESSIBLE PARKING REQUIRED
BY SECTION 1106.5 SHALL CONFORM TO ICC A117.1. 8'-2" MIN.
CLEAR HEIGHT
18. PROVIDE PRECAST SPLASH BLOCK @ ALL DOWNSPOUTS
TERMINATING IN LANDSCAPE OR ON FLAT MEMBRANE ROOFS.
19. ALL COLUMNS SHALL BE INDIVIDUALLY PROTECTED FOR 1-HR
RATING, WHEN PART OF PARTITION ASSEMBL
No. Description Date
1 PROGRESS/PRICIN
G
2 OCT
15
2 DRB REVIEW 12 OCT
15
3 PROGRESS/PRICIN
G 2
23 DEC
15
4 CDs/PERMIT 21 JAN
16
Indoor Locker
Room, Pool,
Exercise Room &
Corridor Closed to
Public until
6/28/16
Main Entry
& Stairwell
Phase 1 closed
to public.
Maintain paths
of egress for
construction
personnel
Construction Logistic & Public Safety Plan: 6/01/16 - 6/14/16
CLOSED TO PUBLIC
04/13/16