Loading...
HomeMy WebLinkAboutSpecial Inspections Package.pdf TOWNOFVE • SPECIAL INSPECTION POLICY The International Building Code (IBC) requires special inspections be performed on buildings constructed within the scope of Chapter 17. Following are the general procedures that will be utilized for these provisions. 1. Site-Specific Special Inspection Requirements A. The Design Professional(s) shall submit a statement of special inspections compliant with Chapter 17 of the International Building Code. (IBC 1705)The Special Inspection Statement shall include any additional special inspections as specified in the site specific design documents. B. Owner or owner's agent shall submit a list of special inspectors to be used to comply with the special inspection program for approval. The list of special inspectors shall also include the qualifications of the special inspectors.(IBC 1704.1.1) 2. Special inspection Reports Required A. Owners or owner's agent shall submit a recommended report submittal schedule to the Building Official for approval prior to the start of construction. B. Final report of special inspection required. (IBC 1704.12) 3. During Construction (IBC 1704.1.2) A. Contractor(s)must notify special inspectors when work is ready for inspection and retain inspection reports. B. Reports of special inspections must be provided to the Building Official prior to the applicable inspections being requested by the contractor as required by the codes. No required inspections will be made until all applicable special inspections reports have been received, C. Special inspector(s)must notify the contractor AND design professional(s)in responsible charge,of field discrepancies observed during inspections. D. All field discrepancies observed during special inspections must be resolved, and applicable reports indicating such must be submitted to the Building Official prior to any required inspections being approved by the jurisdiction. E. Routine construction inspections otherwise required by the code must still be performed at the appropriate stages of construction.(IBC 109) F. Certificates of Occupancy I Temporary Certificates of Occupancy will not be issued until all required special inspections are approved, required progress reports and final reports of Special Inspections with seal and original signatures are received by the Building Official. —1 Job Name:_124r4.4Set~; .+l +i�. iJob Address: 5090 46•41,-,lid' Dr. T0WNOFVIIL ' Permit No.: SPECIAL INSPECTION AND TESTING AGREEMENT (To applicants of projects requiring Special Inspection or Testing per Section 1701 of the IBC) The owner or his/her representative, on the advice of the design professional in responsible charge, shall complete, seat, sign and submit a copy of the Special Inspection Agreement and Structural Tests Scheduled to the Town of Vail for review and approval. Signatures are required on both pages; photocopied or faxed signatures are acceptable. The owner and his/her general contractor, where applicable, shall also acknowledge the following conditions applicable to Special Inspection Testing: 1. Contractor is responsible for proper notification to the Inspection or Testing agency for items listed.(Page 1) (IBC 1704) 2. Only the testing laboratory should take samples and transport them to their laboratory. 3. Copies of all laboratory reports and inspections are to be sent directly to the Town of Vail by the Testing agency on a weekly basis. 4. Inspection agency to submit names and qualifications of on-site special inspectors to the Town of Vail for review and approval.(Page 2) 5. The special inspector is responsible to immediately notify the Town of Vail Building Official in writing of any concerns and/or problems encountered. 6. It Is the responsibility of the contractor to review the Town of Vail approved plans for additional inspection or testing requirements that may be noted. A pre-construction conference at the job site Is recommended to review special inspection procedures. 7. The special inspector shall use only the Town of Vail approved drawings. 8. All special Inspection field reports must be left on site for review by the Town of Vail staff prior to required inspections or re-inspections. BEFORE OCCUPANCY WILL BE GRANTED: The special inspection agency shall submit a signed and sealed statement that all Items requiring testing and inspection were fulfilled and reported. Those items not tested an r nspe be noted in this statement. A copy of the statement shall be maintained at the job site for the Building lnspec 's review prior to final inspection. Acknowledgement: Owner. ► A. `� li 113/41. Signature Print Name Date eciallnspectiorvE � P � 7 /(? Ag _ _. Agency: .�-� �✓���� ignature Print Name Date Project Arch/Eng: �" 5��,- "44-c-o-r lAf6 �5�� Print Name Date Contractor /tee / y`� - 'Trr+d:s (, ,•u 1/1CE Signature Print Name Date -3- kiTOWN OFVSPECIAL INSPECTION AND TESTING SCHEDULE (IBC 1704) Project Name: ge S R Permit# Owner's Name: Pt t x,. 4 Testing Inspection - • .tura Print Name Date Agency: _ a ' I.� A •_ CT., L P . k Ark Gee Fr 3 7 /(p Testing lnsii!don Signature PrintN a Date Hereby certifies that the Testing/Inspection Agency named above has been engaged to perform structural tests and inspections during construction as checked below,to satisfy all applicable portions of the Building Code. Prior to final inspection, the Inspection Agency shall submit a statement that all Items of designated work performed were reported. Any items checked but not tested or inspected will be noted and explained. Whenever any designated Items on the list are ready for sampling, testing, or inspection, it shall be the responsibility of the contractor to give timely notice to the Inspection agency so that the required services may be performed. REINFORCING STEEL: UNDERPINNING: 424 Tensile&Bend,one set per heat per tons Temporary/Permanent - Inspection of Placement Inspection of Steel Fabrication Inspection of Welding Inspection of Reinforcing&Forms Epoxy Inspection of Concrete Placement Inspection of Tiebacks MASONRY: Prelim.Acceptance Tests(Masonry Units,Wall Prisms) SOIL NAILS: Subsequent Tests(Mortar,Grout,Field Wall Prisms) Temporary Shoring - Inspection of Placement and Grouting Permanent Wail CONCRETE,SHOTCRETE,GROUT AND MORTAR: STRUCTURAL STEEL: Concrete Shot Grout Mortar Sample&Test(List specific members below) Aggregate tests for design Shop Identification&Welding Inspection _Aggregate of aggregates Shop Ultrasonic Inspection Mix Designs Shop Radiography Test Panel • Field Welding Inspection Batch Plant Inspection 41t. Field Bolting Inspection Cement Grab Sample Field Ultrasonic inspection Inspect Placing Field Radiography Compression Tests Metal Deck Welding Inspection Cast Specimens FIREPROOFING: Pick-up Samples Inspection&Placement Shrinkage Bats Yield Check SOILS: Air Check Acceptance Tests _ Dry unit weight Moisture-Density Determination PRECAST CONCRETE: Field Density Reinforcing Tests Drilled Piers Inspection of Reinforcing Placement Deep Foundation Tendon Tests Inspection of Tendon Placement STRUCTURAL WOOD: inspection of Concrete Placement Inspection of Fabrication Inspection of Concrete Batching Inspection of Truss Joint Fabrication Inspection of Panel Attachment&Inserts Sample&Test Components Compression Tests Inspection of Glu Lam Fabrication Inspection of Stressing/Transfer SMOKE CONTROL: PILING,CAISSONS,CAPS,TIES: Inspection of Reinforcing Placement SPECIAL CASES: Inspection of Concrete Placement Inspection of Concrete Batching SPECIAL INSPECTION: Seismic Resistance Specify other test.s,inspections or special instructions required. Wind Requirements -4-