Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
InsulVail Letter.pdf
.. Mr. John Krueger PO Box630 Edwards, CO 81632 VIA EMAIL: jkrueger@kruegervail.com Post Office Box 2888 Vail, Colorado 81658 970-524-3000 Fax 970-524-3001 Revised November 14, 2016 PROJECT: 4512 Streamside Cir. Vail, CO 81657 SPECIFICATIONS: R-49 fiberglass loose fill to new truss exterior ceiling R-47 BIBS to 2x12 exterior ceiling R-55 8" polyurethane spray foam to 9 Yi" deck exterior ceiling R-13 2" polyurethane spray foam above new can lights R-21 unfaced fiberglass batts to 2x6 exterior walls R-13 unfaced fiberglass batts to 2x4 garage common wall " ,,, 2" R-Tech 1# density rigid board to block exterior walls i/ R-13 unfaced fiberglass batts to 2x4 furred exterior walls~ ; 11 ·i:eik-.,...., R-25 unfaced fiberglass batts to void behind furred exterior walls 6 mil poly to truss exterior ceiling, exterior walls, & garage common wall MemBrain smart vapor barrier to 2x12 exterior ceiling R-19 unfaced fiberglass batts to garage ceiling R-19 unfaced fiberglass batts to mid floors R-19 unfaced fiberglass batts to crawl ceiling 2" R-Tech 1# density rigid board to block crawl wall R-21 unfaced fiberglass batts to rim joists 2" R-Tech 1# density foil faced rigid board & R-40 6" polyurethane spray foam (total R-50) to 2x8 cantilevered area R-11 unfaced fiberglass batts to 2x4 interior walls R-19 unfaced fiberglass batts to 2x6 interior walls R-12 mineral wool batts to 2x4 party walls R-17 mineral wool batts to 2x6 party walls Foam all windows, doors, & penetrations Air sealing package TOTAL cost installed including labor and tax $ 10,724.00 11/•7 ~ ,..., i ~ <1 "?'":... t c" ·' c.v <A-<--tL~-i..:. .~ 11,.,.Q ~ /-; Thank you for the opportunity to submit this proposal. ·fa: k,,-/),'t1'¥\ -vz..:, 1 ~ -1f-- 1