HomeMy WebLinkAboutEngineering letter.pdfFINAL REPORT OF SPECIAL INSPECTIONS Pr~ect: 1406 Moraine Drive Projectlocation: 1406 Moraine Drive Owner Mike Karty Permit Number: B 16 -0 3 5 0 Address 1406 Morai ne Drive City: Vail Zip: _8_1_6_5_8 ___ _ Special Inspections Agency -Desi§A ProfessieAat Jn-GhaFge;: GROUND Engineering Consul tan ts, Inc. Address: PO Box 4 64 City: Gypsum Fax: ( 9 7 0 ) 5 2 4 -0 7 21 State: _c_o ____ Zip: 81637 Phone: (970) 524-0720 E-mail: chris. hutto@groundeng.com carl.henderson@groundeng.com To the best of my information, knowledge, and belief, the special inspections and/or testing required for this project, have been completed in accordance with the contract documents. Interim reports submitted prior to this Final Report of Special Inspections form a basis for, and are to be considered an integral part of this final report. Any discrepancies that were noted in all interim reports have been corrected. Drill & Epoxy Only -see 11 16-6596 .epoxy.161013.jl.prt" Prepared by: Carl Henderson, P.E. 10-13-2016 Date Preparer's Seal and Signature Required -12- Client: Mark Hallenbeck ~ ~BRDUllD 7 ENGINEERING Rocky Mountain Construction Group, Inc. 120 Willow Bridge Rd, Suite 7 Vail, CO 81657 1406 Moraine Drive Drill and Epoxy Cover Report Date: October 13, 2016 Job Number: 16-6596 General Contractor: Rocky Mountain Construction Group, Inc. Rep. Notified: Mark As scheduled, a representative visited the project site to perform special inspections for drill and epoxy at locations requested. Comments or Photos: Discrepancies Reported this Date? 0 No. of Pages Attached: 1 Field Representative: Jerry Lopez/ Shane Sorensen www.groundeng.com Englewood, Commerce City, Loveland, Granby, Gypsum r- ~~.(~ ~DUND xi/ ENGINEERING Report Date: October 13, 2016 Client: Mark Hallenbeck 1406 Moraine Drive Rocky Mountain Construction Group, Inc. 120 Willow Bridge Rd, Suite 7 Vail, CO 81657 Job Number: 16-6596 General Contractor: Rocky Mountain Construction Group, Inc. Rep. Notified: Mark Rep. Notified: Gilbert Subcontractor: Vasquez Concrete Documents Used: Plans Drilling Location: 1.) Exterior structual wall SW corner 2.) Exterior structual wall SE corner 3.) Exterior footing SW corner 4.) Exterior footing SE comer Orientation (vertical/horizontal): 1.) 2.) Hole Diameter (inches): 1.) Hole Spacing (inches): Drilling Equipment: Hammer drill 2.) 3.) 4.) 1.) 2.) 3/4 3/4 3/4 3/4 12 12 Method to Clean Hole: Wire brush and compressed air Epoxy Epoxy Type: Hilton HIT-HY 200-R Epoxy Expiration: 02/2017 Placement Method: Pump gun Reinforcement Type (rebar/bolVanchor): 1.) 2.) 3.) 4.) Placement Method: N/A Additional Reinforcing Steel: N/A Rebar Rebar Rebar Rebar Field Representative: Jerry Lopez/ Shane Sorensen Drill and Epoxy Horizontal Horizontal Size: Length (inches): 1.) 2.) 3.) 4.) 5 5 5 5 Comments: We arrived on-site at 8:00 am, observations did not occur until 10:00 am. www.groundeng.com 3.) 4.) 1.) 2.) 3.) 4.) 3.) 4.) Horizontal Horizontal 6 6 6 6 Center of footer Center of footer Length (inches) 1.) 2.) 3.) 4.) Englewood, Commerce City, Loveland, Granby, Gypsum 30 30 30 30