Loading...
HomeMy WebLinkAboutScope of Work_1.pdf ��sCR►�; o� c r Sedez, or l ui1 a IJOR V Guest Bath: • Remove and replace(1)One tub,(1)One tub and shower valve and (1)One tub waste and over flow • Remove and replace(1)One toilet and (1)One lay • Provide and install rough plumbing for(1)One lay and relocating rough plumbing for(1)One washer box Master bath • Convert existing tub and shower to shower only • New shower to have(2)Two shower valves(one will get hand held with wall 90 and slide bar) • New shower to get a linear drain(not induded in this proposal ) • Provide and install rough plumbing for(1)One lay • Relocate rough plumbing for existing toilet to the right using an offset closet flange Thompson Bath Remodel Project @ Villa Cortina Unit 250 General Description & Scope of Work Guest Bedroom & Bath: Add closet to Guest Bedroom, Relocate entry to Guest Bath, Relocate Laundry area in New Guest Bath configuration, new vanity Cabinets and Countertops, Add Lay Sink to New Vanity Configuration, Replace Tub and Install New Euro Tub/Shower Doors Master Bath: Add 2 closets to New Master Bath configuration, Relocate entry to Master Bath, New Vanity Cabinets and Countertops, Add Lay Sink to New Vanity Configuration, Change from tub to shower and Install New Euro Shower Doors Lighting: Add can lights and new sconces for vanities to Guest Bath and Master Bath, Add Updated lighting and devices throughout