HomeMy WebLinkAboutScope of Work_1.pdf ��sCR►�; o� c r Sedez, or l ui1 a IJOR V
Guest Bath:
• Remove and replace(1)One tub,(1)One tub and shower valve and (1)One tub waste and over
flow
• Remove and replace(1)One toilet and (1)One lay
• Provide and install rough plumbing for(1)One lay and relocating rough plumbing for(1)One
washer box
Master bath
• Convert existing tub and shower to shower only
• New shower to have(2)Two shower valves(one will get hand held with wall 90 and slide bar)
• New shower to get a linear drain(not induded in this proposal )
• Provide and install rough plumbing for(1)One lay
• Relocate rough plumbing for existing toilet to the right using an offset closet flange
Thompson Bath Remodel Project @ Villa Cortina Unit 250
General Description & Scope of Work
Guest Bedroom & Bath: Add closet to Guest Bedroom, Relocate entry to Guest
Bath, Relocate Laundry area in New Guest Bath configuration, new vanity
Cabinets and Countertops, Add Lay Sink to New Vanity Configuration, Replace Tub
and Install New Euro Tub/Shower Doors
Master Bath: Add 2 closets to New Master Bath configuration, Relocate entry to
Master Bath, New Vanity Cabinets and Countertops, Add Lay Sink to New Vanity
Configuration, Change from tub to shower and Install New Euro Shower Doors
Lighting: Add can lights and new sconces for vanities to Guest Bath and Master
Bath, Add Updated lighting and devices throughout