HomeMy WebLinkAboutB16-0149_1COVER_1478899610.pdfREDEVELOPMENT BOOTH CREEK PARK
CONSTRUCTION DOCUMENTS
4 / 8 / 2016
TOWN OF VAIL
Public Works Department
The redevelopment of Booth Creek Park is a project to create new recreational amenities at an existing neighborhood park. Recreational
amenities include a picnic pavilion, playground, public restroom, tennis courts, recreational paths, an activity lawn and passive seating. Located at
the gateway to the Booth Creek hiking trail, the new playground will allow children to practice skills useful to future hiking adventures through an
artful interpretation to the surrounding landscape.
Sheet Index
Location Map
CIVIL & STRUCTURAL ENGINEER:
JVA CONSULTING ENGINEERS
214 8th Street, Suite 210
Glenwood Springs, CO. 81601
Tel: (970) 404-3100
ARCHITECT:
DARBY ARCHITECTS, P.C.
PO Box 445
Edwards, CO. 81632
Tel: (970) 926-2622
Project Description
Sheet
No.
Sheet Title
Landscape Drawings:
GENERAL INFORMATION:
L0-00 Cover
● ●●●●
L0-01 Existing Conditions
●●●●●
L0-02 Site Reference Hardscape Plan
● ●●●●
L0-03 Site Reference Softscape Plan
●●●●●
L0-04 General Information
●●●●●
TREE PROTECTION SERIES:
L2-01 Tree Protection
●●●●●
MATERIALS SERIES:
L3-01 Materials Plan
●●●●●
L3-02 Materials Plan
●●●●●
L3-03 Materials Plan
●●●●●
L3-04 Materials Plan
●● ●●●
LAYOUT SERIES:
L4-01 Not Used at This Time
GRADING AND DRAINAGE SERIES:
Refer to Civil Drawings
SITE LIGHTING SERIES:
Refer to MEP Drawings
SITE DETAILS SERIES:
L7-01 Site Details
● ●●●●
L7-02 Site Details
● ●●●●
L7-03 Site Details
●●●●●
L7-04 Site Details
● ●●●●
L7-05 Site Details
● ●●●
L7-06 Site Details
● ●●●
L7-07 Site Details
●●●
L7-08 Site Details
●●●
L7-09 Site Details
● ●●
L7-10 Site Details
●
L7-11 Site Details
●
PLANTING PLAN SERIES:
L8-01 Planting Plans
● ●●●●
L8-02 Planting Plans
●●●●●
L8-03 Planting Plans
●●●●●
L8-04 Planting Plans
●●●●●
PLANTING DETAILS SERIES:
L10-1 Planting Details
●● ●●●
L10-2 Planting Details
● ●●●●
1/29
LANDSCAPE ARCHITECT:
DESIGNWORKSHOP
120 East Main Street
Aspen, CO 81611-1787
Tel: (970) 925-8354
Project Vicinity
MEP ENGINEER:
BEAUDIN GANZE
CONSULTING
ENGINEERS, INC.
22 Chapel Place Unit AC-201
Avon, CO. 81620
Tel: (970) 949-6108
PROJECT LOCATION
I-70 CORRIDOR
BOOTH CREEK
TOWN OF VAIL
GORE CREEK
PROJECT BOUNDARY
I-70 CORRIDOR
VAIL MOUNTAIN SCHOOL
BOOTH CREEK
N N
1" = .5 Mile 1" = 500'
PRE-CONST. SERVICES:
R.A. NELSON
51 Eagle Rd #2
Avon, CO. 80482
Tel: (970) 471.3919
TOWN OF VAIL:
PUBLIC WORKS DEPT.
1309 Elkhorn Drive
Vail, CO. 81657
Tel: (970) 479-2158
IRRIGATION:
HYDRO SYSTEMS
KDI, INC.
860 Tabor St
Lakewood, CO. 80401
Tel: (303) 980-5327
Architecture Drawings:
Civil Drawings:
Structural Drawings:
MEP Drawings:
Irrigation Drawings:
Picnic Shelter:
S0-P General Information
● ●●●●
S1-P Foundation and Roof
● ●●●●
Restroom:
S0-B General Information
● ●●●●
S1-B Sections, Foundation and Roof
● ●●●●
S2-B Upper Roof Plan
●●●●●
Sheet
No.
Sheet Title
1/29
Civil Sheet Set:
C0.1 Notes, Legend, and Abbreviations ● ●●●●
C0.2 Site Demolition Plan ●●●●●
C1.0 Grading and Drainage Plan
● ●●●●
C1.1 Grading and Drainage Details
●●
C2.0 Utility Plan ●●●●●
C3.0 Horizontal Control Plan ●●●●●
C3.1 Line and Curve Data
●●●
C3.2 Site Details ●●● ●●
Picnic Shelter:
A1-P Title Sheet
● ●●●●
A2-P Picnic Floor Plan/ Roof Plan
●●●●●
A3-P Picnic Elevations
●●●●●
A4-P Picnic Sections
●●●●●
A5-P Picnic Details
●●●●
Restroom:
A1-R Title Sheet
● ●●●●
A2-R Restroom Floor Plan/ Roof Plan
●●●●●
A3-R Restroom Elevations
●●●●●
A4-R Restroom Sections
● ●●●●
A4.1-R Restroom Sections
●
A5-R Restroom Details
●●●●
A5.1-R Restroom Details
●
A6-R Restroom Door, Window, Finish Schedule
●●●
A7-R Restroom Interior Elevations
● ●●
A8-R Restroom Reflected Ceiling Plan
●
2/12
2/12
E1.0 Electrical Cover Sheet
●●●●●
E2.0 Site Electrical Plan
●●●●●
E2.1 Restroom Electrical Plan
●●●●●
M1.0 Mechanical Cover Sheet
●●●●●
M2.1 Restroom Mechanical Plan
●●●●●
IR-0 Irrigation Notes & Schedule
●●●
IR-1 Irrigation Plan
●●●
IR-2 Irrigation Details
●●●
IR-3 Irrigation Details
●●●
3/4
3/4
3/25
3/25
4/8
4/8
08/19/16