Loading...
HomeMy WebLinkAboutB16-0149_1COVER_1478899610.pdfREDEVELOPMENT BOOTH CREEK PARK CONSTRUCTION DOCUMENTS 4 / 8 / 2016 TOWN OF VAIL Public Works Department The redevelopment of Booth Creek Park is a project to create new recreational amenities at an existing neighborhood park. Recreational amenities include a picnic pavilion, playground, public restroom, tennis courts, recreational paths, an activity lawn and passive seating. Located at the gateway to the Booth Creek hiking trail, the new playground will allow children to practice skills useful to future hiking adventures through an artful interpretation to the surrounding landscape. Sheet Index Location Map CIVIL & STRUCTURAL ENGINEER: JVA CONSULTING ENGINEERS 214 8th Street, Suite 210 Glenwood Springs, CO. 81601 Tel: (970) 404-3100 ARCHITECT: DARBY ARCHITECTS, P.C. PO Box 445 Edwards, CO. 81632 Tel: (970) 926-2622 Project Description Sheet No. Sheet Title Landscape Drawings: GENERAL INFORMATION: L0-00 Cover ● ●●●● L0-01 Existing Conditions ●●●●● L0-02 Site Reference Hardscape Plan ● ●●●● L0-03 Site Reference Softscape Plan ●●●●● L0-04 General Information ●●●●● TREE PROTECTION SERIES: L2-01 Tree Protection ●●●●● MATERIALS SERIES: L3-01 Materials Plan ●●●●● L3-02 Materials Plan ●●●●● L3-03 Materials Plan ●●●●● L3-04 Materials Plan ●● ●●● LAYOUT SERIES: L4-01 Not Used at This Time GRADING AND DRAINAGE SERIES: Refer to Civil Drawings SITE LIGHTING SERIES: Refer to MEP Drawings SITE DETAILS SERIES: L7-01 Site Details ● ●●●● L7-02 Site Details ● ●●●● L7-03 Site Details ●●●●● L7-04 Site Details ● ●●●● L7-05 Site Details ● ●●● L7-06 Site Details ● ●●● L7-07 Site Details ●●● L7-08 Site Details ●●● L7-09 Site Details ● ●● L7-10 Site Details ● L7-11 Site Details ● PLANTING PLAN SERIES: L8-01 Planting Plans ● ●●●● L8-02 Planting Plans ●●●●● L8-03 Planting Plans ●●●●● L8-04 Planting Plans ●●●●● PLANTING DETAILS SERIES: L10-1 Planting Details ●● ●●● L10-2 Planting Details ● ●●●● 1/29 LANDSCAPE ARCHITECT: DESIGNWORKSHOP 120 East Main Street Aspen, CO 81611-1787 Tel: (970) 925-8354 Project Vicinity MEP ENGINEER: BEAUDIN GANZE CONSULTING ENGINEERS, INC. 22 Chapel Place Unit AC-201 Avon, CO. 81620 Tel: (970) 949-6108 PROJECT LOCATION I-70 CORRIDOR BOOTH CREEK TOWN OF VAIL GORE CREEK PROJECT BOUNDARY I-70 CORRIDOR VAIL MOUNTAIN SCHOOL BOOTH CREEK N N 1" = .5 Mile 1" = 500' PRE-CONST. SERVICES: R.A. NELSON 51 Eagle Rd #2 Avon, CO. 80482 Tel: (970) 471.3919 TOWN OF VAIL: PUBLIC WORKS DEPT. 1309 Elkhorn Drive Vail, CO. 81657 Tel: (970) 479-2158 IRRIGATION: HYDRO SYSTEMS KDI, INC. 860 Tabor St Lakewood, CO. 80401 Tel: (303) 980-5327 Architecture Drawings: Civil Drawings: Structural Drawings: MEP Drawings: Irrigation Drawings: Picnic Shelter: S0-P General Information ● ●●●● S1-P Foundation and Roof ● ●●●● Restroom: S0-B General Information ● ●●●● S1-B Sections, Foundation and Roof ● ●●●● S2-B Upper Roof Plan ●●●●● Sheet No. Sheet Title 1/29 Civil Sheet Set: C0.1 Notes, Legend, and Abbreviations ● ●●●● C0.2 Site Demolition Plan ●●●●● C1.0 Grading and Drainage Plan ● ●●●● C1.1 Grading and Drainage Details ●● C2.0 Utility Plan ●●●●● C3.0 Horizontal Control Plan ●●●●● C3.1 Line and Curve Data ●●● C3.2 Site Details ●●● ●● Picnic Shelter: A1-P Title Sheet ● ●●●● A2-P Picnic Floor Plan/ Roof Plan ●●●●● A3-P Picnic Elevations ●●●●● A4-P Picnic Sections ●●●●● A5-P Picnic Details ●●●● Restroom: A1-R Title Sheet ● ●●●● A2-R Restroom Floor Plan/ Roof Plan ●●●●● A3-R Restroom Elevations ●●●●● A4-R Restroom Sections ● ●●●● A4.1-R Restroom Sections ● A5-R Restroom Details ●●●● A5.1-R Restroom Details ● A6-R Restroom Door, Window, Finish Schedule ●●● A7-R Restroom Interior Elevations ● ●● A8-R Restroom Reflected Ceiling Plan ● 2/12 2/12 E1.0 Electrical Cover Sheet ●●●●● E2.0 Site Electrical Plan ●●●●● E2.1 Restroom Electrical Plan ●●●●● M1.0 Mechanical Cover Sheet ●●●●● M2.1 Restroom Mechanical Plan ●●●●● IR-0 Irrigation Notes & Schedule ●●● IR-1 Irrigation Plan ●●● IR-2 Irrigation Details ●●● IR-3 Irrigation Details ●●● 3/4 3/4 3/25 3/25 4/8 4/8 08/19/16