Loading...
HomeMy WebLinkAboutB16-0149_1L10-02_1478899625.pdfC DATE # DESCRIPTION ISSUE DATE: SHEET NUMBER REVIEWED: PROJECT NUMBER: DRAWN: 1 REVISIONS 5431 2 3 4 5 6 7 A B C D E REDEVELOPMENT 2900 MANNS RANCH ROAD VAIL, COLORADO C O P Y R I G H T D E S I G N W O R K S H O P, I N C. F 8 9 1 2 3 4 5 6 7 8 9 CONSTRUCTION DOCUMENTS April 8, 2016 DC MA BOOTH CREEK PARK 1309 ELKHORN DRIVE. VAIL, COLORADO. 81657 970.479.2158 DESIGN WORKSHOP W W W . D E S I G N W O R K S H O P . C O M Landscape Architecture x Land Planning Facsimile (970) 920-1387 (970) 925-8354 Aspen, CO 81611 120 E. Main St. PLANTING DETAILS L10-02 PLANTING KEYNOTES: DETAIL / SHEET 9.0 PLANTING AND LANDSCAPE 9.2 Deciduous Tree Planting 9.4 Deciduous Tree Planting on a Slope 01 / L10-01 03 / L10-01 SPEC. SECTION 000000 000000 9.3 Shrub Planting 02 / L10-01 000000 Shrub Planting on a Slope 9.5 04 / L10-01 000000 9.1 Tree Protection 01 / L10-01 000000 Evergreen Planting 9.6 01 / L10-02 000000 Evergreen Planting on a Slope 9.7 02 / L10-02 000000 1 Shrub Planting 1"=1'-0" 9.4 2 Shrub Planting on Slope 1"=1'-0" 9.5 UNDISTURBED SOIL - DIG PIT TO PROPER DEPTH 2x BALL DIAMETER (MIN.) ROUGHEN SIDES OF PIT PLANTING SOIL CREATE SAUCER W/ TOPSOIL REMOVE FROM CONTAINER AND LOOSEN ROOTS SLIGHTLY BY SCRATCHING SIDES OF ROOT BALL BEFORE PLANTING & FREEING GIRDLING ROOTS MULCH UNDISTURBED SOIL - DIG PIT TO PROPER DEPTH ROUGHEN SIDES OF PIT PLANTING SOIL CREATE SAUCER ON DOWNHILL SIDE REMOVE FROM CONTAINER AND LOOSEN ROOTS SLIGHTLY BY SCRATCHING SIDES OF ROOT BALL BEFORE PLANTING & FREEING GIRDLING ROOTS MULCH 2x BALL DIAMETER (min) 3 Evergreen Planting 1"=1'-0" 9.6 4 Evergreen Planting on Slope 1"=1'-0" 9.7 CROWN OF ROOT BALL SHALL BEAR SAME RELATION (OR SLIGHTLY ABOVE) TO FINISH GRADE AS IT BORE TO PREVIOUS GRADE. NON-ABRASIVE RUBBER TIES GUY WIRES (3), WHITE FLAG ON EACH TO INCREASE VISIBILITY; (REMOVE AFTER 1 FULL SEASON) 4" OF MULCH (NO MORE THAN 1" ON TOP OF ROOTBALL. CREATE SOIL SAUCER W/ TOPSOIL (3" MIN) REMOVE ALL BURLAP, ROPE AND/OR WIRES FROM ROOTBALL PRIOR TO PLANTING PLACE ROOTBALL ON SUBGRADE PEDESTAL UNDISTURBED SOIL - DIG PIT TO PROPER DEPTH STAKES (3 PER) SEE SPECS. FOR SIZE AND MATERIAL 3X BALL DIAMETER (MIN.) PLANTING SOIL. PRIOR TO MULCHING, LIGHTLY TAMP SOIL AROUND THE ROOT BALL IN 6" LIFTS TO BRACE TREE. DO NOT OVER-COMPACT. WHEN THE PLANTING HOLE HAS BEEN BACKFILLED, POUR WATER AROUND THE ROOT BALL TO SETTLE THE SOIL. NOTES: 1- TREES SHALL BE OF QUALITY PRESCRIBED IN CROWN OBSERVATIONS AND ROOT OBSERVATIONS DETAILS AND SPECIFICATIONS. 2- SEE SPECIFICATIONS FOR FURTHER REQUIREMENTS RELATED TO THIS DETAIL. 3X BALL DIAMETER (MIN.) 12" MIN. TREE FABRIC W/ GROMMETS LOCATE 3 ANCHOR STAKES 18" AWAY FROM TREE TRUNK. T-RAIL IRON STAKE OR ACCEPTABLE WOODEN SUBSTITUTE, ANCHOR FIRMLY. SEE SPECS FOR STAKE SIZE. CORNER OF ROOT SYSTEM TO BE AT LINE OF PROPOSED GRADE 4" OF MULCH (NO MORE THAN 1" ON TOP OF ROOTBALL. REMOVE ALL BURLAP, ROPE AND WIRES FROM ROOTBALL PRIOR TO PLANTING ROUND-TOPPED SOIL BERM (4" HIGH X 8" WIDE) ABOVE ROOT BALL SURFACE SHALL BE CONSTRUCTED ON THE DOWNHILL SIDE OF THE ROOTBALL FOR 240°. PLANTING SOIL. PRIOR TO MULCHING, LIGHTLY TAMP SOIL AROUND THE ROOT BALL IN 6" LIFTS TO BRACE TREE. DO NOT OVER-COMPACT. WHEN THE PLANTING HOLE HAS BEEN BACKFILLED, POUR WATER AROUND THE ROOT BALL TO SETTLE THE SOIL. UNDISTURBED OR PROPERLY COMPACTED BACKFILL SOIL - DIG PIT TO PROPER DEPTH NOTES: 1- TREES SHALL BE OF QUALITY PRESCRIBED IN CROWN OBSERVATIONS AND ROOT OBSERVATIONS DETAILS AND SPECIFICATIONS. 2- SEE SPECIFICATIONS FOR FURTHER REQUIREMENTS RELATED TO THIS DETAIL. CENTRAL LEADER 08/19/16