Loading...
HomeMy WebLinkAboutB16-0149_1L7-07_1478899648.pdfSite Details L7-07 SITE KEYNOTES: DETAIL / SHEET 1.0 PAVEMENTS, RAMPS, CURBS 1.1 Concrete Paving Type 1 2.0 JOINTING 3.0 STEPS 3.1 Concrete Steps 4.0 SITE WALLS / EMBANKMENTS 4.1 Boulder Wall 5.0 SITE FURNITURE 5.1 Dog Waste Station 5.2 Charcoal Grill 6.0 RAILINGS, BARRIERS, FENCING 7.0 SITE LIGHTING 8.0 DRAINAGE Refer to civil drawings 9.0 PLANTING AND LANDSCAPE Refer to planting drawings 10.0 MISCELLANEOUS ELEMENTS 01 / L7-01 2 / L7-02 3 / L7-02 4 / L7-02 1 / L7-03 SPEC. SECTION 000000 000000 000000 000000 000000 5.3 Trash/Recycle 5.4 Bench 2 / L7-03 3 / L7-03 000000 000000 5.5 Adirondack Chair 4 / L7-03 000000 1.2 Cobble Splash 02 / L7-01 000000 1.3 Concrete Curb 03 / L7-01 000000 1.4 Concrete Band 04 / L7-01 000000 1.5 Engineered Fiber Mulch 05 / L7-01 000000 10.1 Boulder in Landscape 2 / L7-05 10.2 Seat Boulder 3 / L7-05 5.6 Bike Rack 5 / L7-03 000000 1.6 Playground Ramp 01 / L7-02 000000 Refer to civil drawings Refer to MEP drawings 6.1 Handrail 1 / L7-04 000000 10.3 Swing Set 1 / L7-06 10.4 Balance Beam 2 / L7-06 10.5 Spinner 3 / L7-06 10.6 Toddler Cabin 1 / L7-07 10.7 Fort 1 / L7-08 , 1 / L7-09 C DATE # DESCRIPTION ISSUE DATE: SHEET NUMBER REVIEWED: PROJECT NUMBER: DRAWN: 1 REVISIONS 5431 2 3 4 5 6 7 A B C D E REDEVELOPMENT 2900 MANNS RANCH ROAD VAIL, COLORADO C O P Y R I G H T D E S I G N W O R K S H O P, I N C. F 8 9 1 2 3 4 5 6 7 8 9 CONSTRUCTION DOCUMENTS ADDENDUM 3 April 21, 2016 DC MA BOOTH CREEK PARK 1309 ELKHORN DRIVE. VAIL, COLORADO. 81657 970.479.2158 DESIGN WORKSHOP W W W . D E S I G N W O R K S H O P . C O M Landscape Architecture x Land Planning Facsimile (970) 920-1387 (970) 925-8354 Aspen, CO 81611 120 E. Main St. 1 Toddler Cabin 1/2"=1'-0" 10.6 PLAN L-SLIDE. OWNER PROVIDED. CONTRACTOR INSTALLED. 9'-9 1 2 " ELEVATION - A SECTION A SECTION - A MONOLITHIC BOULDER "CHIMNEY" METAL ROOF 2x6 WOOD DECKING EDGE OF EXTERIOR WALL BELOW TYP. MONOLITHIC BOULDER "CHIMNEY" METAL ROOF APPROX. 6-0" APPROX. 3'-0" 8'-5 3 4 " TUNNEL FULL DIMENSION ELEVATION - B ELEVATION - C ELEVATION - D METAL HANDRAIL 1.25" DIAMETER 2'-6" TYP. 6" 4" 3" LIGHT WELLS (TYP.) LIGHT WELLS (TYP.) TUNNEL 1.5 1.5 1.5 1.5 1.6 2'-0" MIN. 2'-6" 2'-0" MIN. CLEAR CONTRACTOR SHALL ENSURE ALL PARTIALLY BOUND OPENINGS AND ANGLES ARE GREATER THAN 55°. TRANSFER PLATFORM TRANSFORM PLATFORM WOOD STAIR (TYP.) 2'-0" MIN. CLEAR METAL HANDRAIL 4'-0" 3'-8 3 4 " 3'-6" L-SLIDE 4'-0" DECK L-SLIDE (BEYOND) LINE OF INTERIOR FLOOR ELEVATION (BEYOND) 2X8 WOOD CORNER TRIM MONOLITHIC BOULDER "CHIMNEY" 2X6 WOOD SIDING W/ 1" GAP 2X6 WOOD FACIA METAL ROOF HIGH TEMP WATERPROOF MEMBRANE SHEATHING (PER STRUCTURAL) METAL FLASHING W/ DRIP EDGE 2X6 WOOD FASCIA ROOF EAVE (REFER TO STRUCTURAL) TYP. (REFER TO STRUCTURAL) FOUNDATION (REFER TO STRUCTURAL) 2'-0" FINISH NOTE: ALL WOOD SIDING AND METAL ROOF TO MATCH RESTROOM (RE: ARCHITECTURE) ROOF CRICKET ROOF CRICKET 08/19/16