Loading...
HomeMy WebLinkAboutB16-0149_1L7-09_1478899651.pdfSite Details L7-09 SITE KEYNOTES: DETAIL / SHEET 1.0 PAVEMENTS, RAMPS, CURBS 1.1 Concrete Paving Type 1 2.0 JOINTING 3.0 STEPS 3.1 Concrete Steps 4.0 SITE WALLS / EMBANKMENTS 4.1 Boulder Wall 5.0 SITE FURNITURE 5.1 Dog Waste Station 5.2 Charcoal Grill 6.0 RAILINGS, BARRIERS, FENCING 7.0 SITE LIGHTING 8.0 DRAINAGE Refer to civil drawings 9.0 PLANTING AND LANDSCAPE Refer to planting drawings 10.0 MISCELLANEOUS ELEMENTS 01 / L7-01 2 / L7-02 3 / L7-02 4 / L7-02 1 / L7-03 SPEC. SECTION 000000 000000 000000 000000 000000 5.3 Trash/Recycle 5.4 Bench 2 / L7-03 3 / L7-03 000000 000000 5.5 Adirondack Chair 4 / L7-03 000000 1.2 Cobble Splash 02 / L7-01 000000 1.3 Concrete Curb 03 / L7-01 000000 1.4 Concrete Band 04 / L7-01 000000 1.5 Engineered Fiber Mulch 05 / L7-01 000000 10.1 Boulder in Landscape 2 / L7-05 10.2 Seat Boulder 3 / L7-05 5.6 Bike Rack 5 / L7-03 000000 1.6 Playground Ramp 01 / L7-02 000000 Refer to civil drawings Refer to MEP drawings 6.1 Handrail 1 / L7-04 000000 10.3 Swing Set 1 / L7-06 10.4 Balance Beam 2 / L7-06 10.5 Spinner 3 / L7-06 10.6 Toddler Cabin 1 / L7-07 10.7 Fort 1 / L7-08 , 1 / L7-09 C DATE # DESCRIPTION ISSUE DATE: SHEET NUMBER REVIEWED: PROJECT NUMBER: DRAWN: 1 REVISIONS 5431 2 3 4 5 6 7 A B C D E REDEVELOPMENT 2900 MANNS RANCH ROAD VAIL, COLORADO C O P Y R I G H T D E S I G N W O R K S H O P, I N C. F 8 9 1 2 3 4 5 6 7 8 9 CONSTRUCTION DOCUMENTS ADDENDUM 3 April 21, 2016 DC MA BOOTH CREEK PARK 1309 ELKHORN DRIVE. VAIL, COLORADO. 81657 970.479.2158 DESIGN WORKSHOP W W W . D E S I G N W O R K S H O P . C O M Landscape Architecture x Land Planning Facsimile (970) 920-1387 (970) 925-8354 Aspen, CO 81611 120 E. Main St. 1'-3" LOG POLE (REFER TO STRUCTURAL) 2" TUBE STEEL 1 2 " DIA. STEEL ROD LADDER FRAME (REFER TO STRUCTURAL) MINIMUM PLAYGROUND SURFACING DEPTH LOG POLE (REFER TO STRUCTURAL) L-SLIDE LOG POLE (REFER TO STRUCTURAL) DECK PLATFORM MINIMUM PLAYGROUND SURFACING DEPTH SLIDE FOOTER LOG POLE (REFER TO STRUCTURAL) GUARDRAIL (TYP.) 12 " STEEL ROD 1 1 4" STEEL TUBE ROPE NETTING (OWNER PROVIDED, CONTRACTOR INSTALLED) 2'-6" ELEVATION B-B' BOULDER (BY CHEVO STUDIOS) CONTRACTOR COORDINATION REQUIRED. METAL HANDRAIL 1.25" DIA. TRANSFER PLATFORM 2'-0" MIN. CLEAR WOOD STAIR 1'-2" TYP. GROOVE SLIDE (OWNER PROVIDED, CONTRACTOR INSTALLED) GUARDRAIL (VERTICAL STEEL INFILL) WOOD DECKING LOG POLE (REFER TO STRUCTURAL) ROPE CLIMBER LOG POLE (REFER TO STRUCTURAL) MINIMUM PLAYGROUND SURFACING DEPTH ROPE CLIMBER (BY OWNER) DECK PLATFORM GUARDRAIL MINIMUM PLAYGROUND SURFACING DEPTH WOOD DECKING LOG CONNECTION BEYOND LOG POLE (REFER TO STRUCTURAL) 1 1 4" TUBE STEEL 1 2" STEEL ROD CONNECTION (REFER TO STRUCTURAL) MINIMUM PLAYGROUND SURFACING DEPTH ROPE CLIMBER (OWNER PROVIDED, CONTRACTOR INSTALLED) 1 1 4" TUBE STEEL (CURVED) 5'-10" RADIUS WOOD DECKING FRAME (REFER TO STRUCTURAL) CL LOG POLE (REFER TO STRUCTURAL) CONNECT TO GUARDRAIL 2" TUBE STEEL 1 2 " DIA. STEEL ROD GUARDRAIL GUARDRAIL EXTENSION OUTRIGGER, POST AND SLIDE CONNECTION (REFER TO STRUCTURAL) GUARDRAIL EXTENSION CONNECT TO GUARDRAIL S-SLIDE (OWNER PROVIDED, CONTRACTOR INSTALLED) GUARDRAIL 1'-0" WOOD DECKING FRAME (REFER TO STRUCTURAL) FRAME (REFER TO STRUCTURAL) FOOTING (REFER TO STRUCTURAL) ROPE CLIMBER (OWNER PROVIDED, CONTRACTOR INSTALLED) FOOTING (REFER TO STRUCTURAL) OUTRIGGER AND CONNECTION (REFER TO STRUCTURAL) 1'-3" GRAB BARS (REFER TO STRUCTURAL) GRAB BAR (REFER TO STRUCTURAL) GRAB BAR GUARDRAIL RAMP NOTE: FINAL DIMENSIONS TO BE DETERMINED AFTER BOULDER INSTALLATION EAST INTERMEDIATE STRUCTURE (REFER TO STRUCTURAL) GRAB BAR WOOD DECKING FRAME (REFER TO STRUCTURAL) WOOD RAMP 3" MAX. 9 1 2" MIN. OUTRIGGER, POST AND SLIDE CONNECTION (REFER TO STRUCTURAL) GUARDRAIL EXTENSION CONNECT TO GUARDRAIL 1 Fort - CONTINUED 1/4"=1'-0" 10.7 08/19/16