Loading...
HomeMy WebLinkAboutB16-0149_S7_1478899604.pdf3/8" DIA WELDED "D" RING AT ROPE HANDRAIL LOCATIONS HSS VERT HANDRAIL SUPPORT PER SECTIONS (4) 1/2" PLATES w/ THREADED INSERT FOR ROPE BRIDGE HANDRAIL, OPEN ON BOTTOM FACE 3" ROPE BRIDGE HANDRAIL PER MANUFACTURER 1 1/2" PER SECTION WEST SUPPORT EAST SUPPORT HSS VERT HANDRAIL SUPPORT PER SECTIONS ROPE BRIDGE HANDRAIL PER MANUFACTURER PER SECTION 4 1/2" CLEVIS PER MANUFACTURER 30.00° HSS TUBES PER PLAN AND SECTIONS SEE FOR TYPICAL NET SUPPORT DETAIL 8 S5 ________8 S5 ________HSS 2X2X1/4 HSS 2X2X1/4 TYP HSS 2X2X1/4 2x DECKING PER PLAN 3'-3 3/4" SLOPE CUT TOP OF TUBE AND PROVIDE 1/4" FITTED END PL 6 3/4" 2'-9" GRID GRID 9 3/4" GROOVE II SLIDE 3'-4 1/2" 9 3/4" 5'-0" 4/S5 THROUGH BOLTS FROM SLIDE TO STRUCTURE PER MANUFACTURER 5'-0" HSS BRIDGE STRINGER PER PLAN SEE 5/S5 FOR TYPICAL NET SUPPORT DETAIL HSS 4X4X1/4 HSS 2X2X1/4 TYP TOP AND BOTTOM 2x6 DECKING PER PLAN BRIDGE HANDRAIL ROPE BY OTHERS SEE FOR CONNECTION DETAIL HSS 5X5X1/4 HSS 5X5X1/4 6 3/4" 3'-3 1/4" 3'-10" GRID GRID HSS 4X4X1/4 5/S78" 3'-2" VERIFY IN FIELD 15" MINIUMUM HSS PERIMETER TUBE ON INTERMEDIATE STRUCTURE SEE PLAN AND SECTIONS L70 EACH SIDE OF EACH STRINGER STAIR STRINGER PER PLAN AND SECTIONS 4X10 UNDER HSS TUBE w/ 1/2"Ø ALL THREAD @ 24" WELDED TO TUBE HSS PERIMETER TUBE ON INTERMEDIATE STRUCTURE SEE PLAN AND SECTIONS SIMPSON LBV HANGER BRIDGE GIRDER PER PLAN 2x LEDGER SHOT INTO TUBE 2x DECKING PER PLAN 1/4"Ø x 1 5/8" ALL-THREAD AT TOP, BOTTOM & MID- HEIGHT w/ NUT & WASHER, COUNTER BORED SEE FOR ATTACHEMENT OF ROPE BRIDGE TO SUPPORT HSS TUBES PER PLAN AND SECTIONS SEE FOR TYPICAL NET SUPPORT DETAIL NOTE: PROVIDE SUPPLEMENTAL NETTING BETWEEN MAIN ROPES SUCH THAT NO GAP IS GREATER THAN 3"X3" 4'-0" 6 3/4" 2'-9" 8 1/4" HSS2x2x1/4 1'-8" 5 EQ SPA = 1'-8" 1'-8" 3 EQ SPA = 4'-0" SEE PLAN SEE PLAN SLOPE CUT TOP OF TUBE AND PROVIDE 1/4" FITTED END PL HSS2x2x1/4 80.49° 80.49° CJP 7 1/8" 7 1/8" GRID GRID ROPE BRIDGE 5'-0" 4/S5 5/S7 3/16 HSS3X3X1/4 HSS3X3X1/4 HSS TUBES PER PLAN AND ELEVATION HSS2X2X1/4 GUARDRAIL TYP 2x DECKING PER PLAN BRIDGE GIRDER PER PLAN 6 3/4" 3'-5 1/4" 4'-0" 6 3/4" 2'-9" 3'-3 3/4" GRID GRID ROCK BRIDGE 4'-0" PLATFORM PERIMETER BEAM PER PLATFORM PLAN HSS 2X2X1/4 VERT SUPPORTS @ 15" GAGE MAX HSS 1 1/2X 1 1/2X1/4 HORIZONTAL SUPPORT 1 1/2" DIA SLEEVE CONNECTION TO CLIMBER PER MANUFACTURUER 2X DECKING PER PLAN 4'-10" 6" RE: 11/S7 FOR GRAB BAR DETAIL HSS COMPRESSION RING, SEE PLAN HSS 4X4X1/4 VERT SUPPORTS 2X DECKING PER PLAN BATTERED COLUMN PER PLAN 3/8 TYP HSS STRINGER, SEE PLAN 3'-10" SEE FOR TYPICAL NET SUPPORT DETAIL 4/S5 HANDRAIL PER ARCH BRIDGE HANDRAIL ROPE BY OTHERS SEE FOR CONNECTION DETAIL 5/S7 HSS GIRDER PER PLAN PROVIDE THREADED INSERT FOR ATTACHMENT OF BRIDGE DECKING ROPE HANDRAIL w/ NETTING WITH MAX OPENING OF 5"X5" ROPE BRIDGE DECK BY OTHERS w/ NETTING WITH MAX OPENING OF 3"X3" ROPE TOP RAIL FIELD VERIFY 15" MIN SHEET NUMBER 1309 ELKHORN DRIVE . VAIL . COLORADO. 81657 970.479.2158 # DATE DESCRIPTION ISSUE DATE REVISIONS DRAWN: REVIEWED: 4/22/2016 2:14:33 PM S7 BOOTH CREEK PARK 2900 MANNS RANCH ROAD VAIL, CO 81657 CONSTRUCTION DOCUMENTS ADDENDUM - 3 4/22/2016 Author JPU 17831 0 6" 1' 2' 3' 3/4" 3/4" = 1'-0" S7 SECTION - ROPE BRIDGE HANDRAIL ATTACHMENT 5 0 6" 1' 2' 3' 3/4" 3/4" = 1'-0" S7 ELEVATION - GROOVE II SLIDE 2 0 6" 1' 2' 3' 3/4" 3/4" = 1'-0" S7 ELEVATION - NET BRIDGE 4 0 6" 1' 2' 3' 3/4" 3/4" = 1'-0" S7 SECTION - STAIR TO STRUCTURE ATTACHMENT 8 0 6" 1' 2' 3' 3/4" 3/4" = 1'-0" S7 SECTION - RAMP TO STRUCTURE ATTACHMENT 9 0 6" 1' 2' 3' 3/4" 3/4" = 1'-0" S7 ELEVATION - ROPE BRIDGE 1 0 6" 1' 2' 3' 3/4" 3/4" = 1'-0" S7 ELEVATION - ROCK BRIDGE 3 0 6" 1' 2' 3' 3/4" 3/4" = 1'-0" S7 SECTION - CLIMBER SUPPORT 7 0 6" 1' 2' 3' 3/4" 3/4" = 1'-0" S7 SECTION - NET BRIDGE AT FORT 6 0 6" 1' 2' 3' 3/4" 1 1/2" = 1'-0" S7 SECTION - NET BRIDGE 10 4/22/2016 08/19/16