Loading...
HomeMy WebLinkAboutB16-0180_Alphorn 103 Remodel - KRM Memo 6-22-16_1478901981.pdf KR M CONSULTANTS, INC. RECORD P.O. Box 4572 • Vail,Colorado 81658 • 970-949-9391 TO: Jeff Armistead DATE: 6/22/2016 JOB NUMBER: 1606-19 PROJECT: Alphorn 103 Remodel fJ RF/ I I MEETING NOTES N RESPONSE CLARIFICATION/CHANGE On June 21, 2016 I visited the above-referenced site to observe the notch in the stud packs along the north wall (where heating pipes will be removed). ; It appears that this stud pack is supporting the ridge beam above the third level floor. Based on the I anticipated design load on this stud pack, it should be reinforced as follows. Add two studs to each side of the existing stud pack (full height). Attach the new studs to the original stud pack with (10) - 6" timber lock screws each side, evenly spaced from top to bottom of studs. Please call with questions. KRM Consultants, Inc. ���dN01SS..-Dyh, �:' ••% for' SIGNED: ji j,91-� COPY TO: \.o�j� i%Lid ., O �%ik Tim D. Hennum, PE ''‘‘‘‘._,-E,9...10.3 ‘‘``e-E,91.0°,3 Q0: REVIEWED: ` " i i 1