HomeMy WebLinkAboutStructural Analysis.pdf2447 W 12th Street, Suite 1 Tempe, AZ 85281 | Phone: (480) 927-9696 | Fax: (480) 927-9797 Structural Analysis & Evaluation Letter Project AT&T COL04066/COL09806 LTE 3C “West Vail” 2077 N. Frontage Rd., Vail, CO 81657, FA#10093709 Inte-grat-ed Design Services Group LLC 2200 East Williams Field Road 2nd Floor, Suite 200 Gilbert, Arizona 85295 April 29, 2016 AMMTEC Project No. AZ-2332.001 2447 W 12th Street, Suite 1 Tempe, AZ 85281 Phone: (480) 927-9696 Fax: (480) 927-9797 Structural Analysis April 29, 2016 Job Number: AZ-2332.001 Inte-grat-ed Design Services Group LLC 2200 East Williams Field Road 2nd Floor, Suite 200 Gilbert, Arizona 85295 Attention: Jason Malpass Subject: Structural Analysis for Rooftop Installation AT&T’s. Proposed Antennas and Equipment Site: COL04066/COL09806 LTE 3C “West Vail” 2077 N. Frontage Rd., Vail, CO 81657, FA#10093709 Dear Mr. Malpass: This letter summarizes our analysis regarding the stability of an existing building for the addition of AT&T’s proposed antennas and equipment installation. Our analysis included a review of current building codes and a comparison of new codes to the codes at the time of the referenced previous design, an analytical review of code differences, a review of site photographs taken during a recent site visit and provided by Inte-grat-ed Design Services, and preparation of this report. We understand that it is proposed to replace existing equipment with new equipment as follows: Previous Documents: Construction Drawings prepared by Inte-grat-ed Design Services Group LLC: Project No COL04066/COL09806 LTE 3C, dated April 29, 2016 Location: 39º 37’ 57.8” N, 106º 24’ 52.8” W  Proposed Equipment: We understand that it is proposed to replace existing equipment with new equipment as follows: April 29, 2016 Job Number: AZ-2332.001 Structural Analysis Page No 2 Existing and Reserved Equipment Qty Antenna Manufacturer & Model Number Per Sector 3 TenXC GSM 850 / LTE 700/AWS | BSM-M65-19R010-02 1 3 Powerwave UMTS 850/1900 | 7770 1 3 DIPLEXER (Powerwave) | CM1007-DBPXBC-003 1 3 TMA/LNA | TT19-08BP111-001 1 3 RAYCAP Surge Suppressor | DC6-48-60-18-8F 1 3 Alcatel - Lucent - 700 band | RRH2x40W-07AT 1 3 Alcatel - Lucent - AWS band | RRH2x40-AWS+RDEM 1 Equipment to be Removed Qty Antenna Manufacturer & Model Number Per Sector Proposed Equipment Qty Antenna Manufacturer & Model Number Per Sector 3 TenXC GSM 850 / LTE 700/AWS | BSM-M65-19R010-02 1 3 Powerwave UMTS 850/1900 | 7770 1 3 Quintel LTE 700/1900/AWS | QS66512-2 1 3 DIPLEXER (Powerwave) | CM1007-DBPXBC-003 1 3 TMA/LNA | TT19-08BP111-001 1 3 RAYCAP Surge Suppressor | DC6-48-60-18-8F 1 3 Alcatel - Lucent - 700 band | RRH2x40W-07AT 1 3 Alcatel - Lucent - 1900 band | RRH2x60-1900A-4R 1 3 Alcatel - Lucent - AWS band | RRH2x40-AWS+RDEM 1 Previous Building Code Requirements: 2009 International Building Code, ASCE 7-05, and ANSI/TIA-222-G “ Specification for Antenna Supporting Structures and Antennas” with a 90 mph (3-Sec Gust) Basic Wind Speed. Current Building Code Requirements: 2015 International Building Code and ASCE 7-10 (Minimum Design Loads for Building and Other Structures) for a 3-second gust wind speed of 110 mph (3-Sec Gust) Basic Wind Speed. April 29, 2016 Job Number: AZ-2332.001 Structural Analysis Page No 3 Description of Installation: The proposed antennas will be installed on the exterior wall of an existing enclosed rigid structure. The building is a wood framed structure. The equipment improvements create an insignificant vertical load on the building. In addition, since the antennas are attached to the exterior wall of the existing building, the lateral load conditions remain relatively constant. Conclusions: The replacement equipment weight and configuration alteration is insignificant to the overall project Live and Dead Loading conditions. Since the new equipment is considered to have such a minimal impact to the existing conditions, we conclude that the existing building can support the AT&T installation as presented on the Inte- grat-ed plan (refer to Site #: COL04066/COL09806 LTE 3C Site Name: West Vail). It is the responsibility of the contractor during construction to document that all existing connections are in good condition and proper dimensions. The mounts should consist of a minimum of 2-inch schedule 40 galvanized pipe with a minimum of two connection points and a maximum length between the connections of 6 feet. We trust that this report is satisfactory. If you have any questions regarding the investigation, please contact our office. Respectfully submitted, Alan E. Money P.E. Senior Engineer Apr 29, 2016 Structural Calculations for at&t Mobility Rocky Mountain Region West Vail LTE 3C COL04066/COL09806 LTE 3C 2077 North Frontage Road Basis of Design …………………………..…..…………………………………………………………1 Summary ………..………………………………………………………………………………… 2 Wind Loads ……………………………………………………………………………………….. 3 Seismic Analysis vs. Design Wind Loads ………………..……………………………….…………. 4 Seismic Detail Report ……………..………………..……………………………….………….. 5 Seismic Summary Report ……………..………………..……………………………….………….. 6-9 2447 W 12th Street, Suite 1 Tempe, AZ 85281 Phone: (480) 927-9696 Fax: (480) 927-9797 April 29, 2016 Structural Calculations and Design Details Applicable to Installation of One - COL04066/COL09806 LTE 3C at the Subject Site Apr 29, 2016 1. BUILDING CODE ............................2012 IBC Construction Type: Partially Enclosed Structure (With Roof) 2. GRAVITY DESIGN: Roof Ventilation Reduction:N/A EXPOSURE ...................................C Seismic Design Category = C Risk Category = II 3 SECOND WIND GUST ..............110 (mph) Live Load:20 (psf) Dead Load:15.00 (psf) 3. SOILS: 12 Soil bearing pressure …………............... 1,000 psf Soil lateral bearing pressure ………100 psf Minimum footing depth..................................... 12 (inches) Unless local conditions are greater CONCRETE 1. CODES AND STANDARDS. Comply with the following Codes: A. ACI 318, "Building Code Requirements for Reinforced Concrete". B. ACI 347, "Recommended Practice for Concrete Form Work". 2. MATERIALS shall conform to the following: D. Air entrainment: ASTM C260 A. Cement; ASTM C150, Type V, Portland Cement. E. Fly ash: ASTM C618 B. Hard rock aggregates: ASTM C33 F. Calcium chloride SHALL NOT be used. Lightweight aggregates: ASTM C330 C. Water shall be potable. 3. MIX DESIGNS: A. The maximum slump shall be 4" w/o plasticizer added. C. Limit fly ash to 20% of the total cement. B. Use pea gravel and/or plasticizer in congested areas. D. Concrete mixes shall conform to the following: 28 Day Strength (psi)* W/C Ratio Dry Weight (pcf) Max Aggregate Size (inches) Entrained Air (%) Min Cement Per CY (lbs) Footings & Slabs on Grade 2500 0.45 150 3/4 3 ±1 517 *(Special Inspection not required) 4. CONSTRUCTION: A. Mechanically vibrate concrete during placement. 5. FOOTINGS: B. Center footings on structure above, UNO. C. Exterior footings to be embedded a minimum depth. STEEL 1. CODES AND STANDARDS. Comply with: A. CRSI "Manual of Standard Practice". B. ACI "Detailing Manual", ACI 315 (or SP-66). Reinforcing: 60 ksi A-615 - Grade 60 HSS Tube: 46 ksi A -500 Roof Decking: 50 ksi A-792 - Grade 50 Pipe: 36 ksi A-501 Bolts ASTM A36, ASTM A307 as specified on details 3. CONSTRUCTION: A. Detail, bolster, and support all rebar. Tie bars securely with proper clearances before casting concrete. B. Use rebar free flaky rust, grease, dirt, and other materials, which affect bond. C. Minimum lap splices (inches): Bar # #3 #4 #5 #6 Inches 16 20 24 33 D. Make cold bends. DO NOT use heat. DO NOT re-bend a previously bent bar. E. Minimum concrete cover: (securely position and anchor rebar prior to pour) Cast against and permanently exposed to earth ………. 3 (inches) Slabs-On-Grade (SOG) ............................................ Center of slab, UNO F. DO NOT weld reinforcing unless specifically noted. CLIENT:at&t Mobility Rocky Mountain Region PROJECT:West Vail LTE 3C COL04066/COL09806 LTE 3C Prepared By:AEM 2077 North Frontage Road Date:04/29/16 GENERAL NOTES & BASIS OF DESIGN Type of Concrete Member Page 1 of 9 4/29 Type of Wall: Structural Sheathing (SS) Unit Weight: 2.5 lbs/sf Member Weights psf Area Ttl Wt (lbs) No Roof 0 600 0 0 600 0 0 600 0 Member Call out Width (ft) Height (ft) length(ft)Load Area Ttl Wt (lbs) Walls SS 40.000 10.000 15.000 2.5 55.0 1375.0 Anntennas At&t 8.000 100.0 800.0 Roof Rafters 2 x 6 0.167 0.500 15.0 38.0 25.0 950.0 Floor Beams 2 x 6 0.167 0.500 15.0 38.0 25.0 950.0 Roof DL NA NA 0.0 0.0 0.0 0.0 Total 4,075 Dimensions Roof Pitch 1 (in) V 12 (in) H 600 sqft Columns:0 Width 40 Length (ft)15 Column Width 0 Wall Height 10 (ft) 800.0 lbs Number of Walls 4 6825 lbs Total Fdn Length 110 0 ft 15 ft 40 ft Lateral Wind Shear > Seismic Base Shear : Wind Controls Design Use: 1400 lbs Shortest Direction or 467 plf Rafter to existing Building Connection (2ft O.C.) 750 plf (Conservative - Structural Tubing Every Two Feet)1000 lbs (2 nails per end) Conservative 467 plf 750 > 467 OK Additional Resistance Against Uplift - 20000 lbs Uplift 4675 lbs 0 psf 20,160 Total Weight of Structure =4,675 From Above 60% of Weight of Structure = 2,805 Additional Resistance = 20,000 Net Uplift =-2,645 Negative Uplift, Okay 0.12% Less than 2/10ths of a percent, Negliglble - Okay CLIENT:at&t Mobility Rocky Mountain Region PROJECT:West Vail LTE 3C COL04066/COL09806 LTE 3C Prepared By: 2077 North Frontage Road Date: Type of Wall: Structural Sheathing (SS) Total Wall Perimeter = Weight Antenna + Equipment Check for resistance against lateral resistance in shortest direction Factored Total Weight = Eave OverHang Max Wall Length = Max Wall Length = % Dead Load Increase Due to Presence of Antennas = Project Summary 04/29/16 AEM Total Vertical Dead plus Live Load = Friction + Cohesion = Total Uplift = Roof Dead Load = 15 min for Tile, 10 for Shingles and Foam Sheathing Misc Appurtenances & Matls: Roof Type Page 2 of 9 4/29 Calculaton of Design Wind Loads - Main Force Resisting Systems 2012 IBC/ASCE 7-10 Exposure: C Risk Category: II 3s Wind Gust (mph): 110 Rise Run Gable Roof Pitch =112 = 4.8 Degrees Roof Wind Load Uplift Worse Case = -33.6 ASCE (Pg 42)L = 40 Downward Worse Case = 7 (T 27.6-2) [284]B = 15 L/B = 2.7 Wall Wind Load = 33.6 Weight of Structure = 4,075 lbs Use p = 33.6 psf to Calculate Uplift = Worse Case Use p = 33.6 psf to Calculate Lateral Load for Walls - Worse Case Uplift is neglible (No Roof) 20,160 lbs Wind Shear = 33.6(40)(10) = 13,440 lbs Downward Wind = (7)(15)(40) = 4200 lbs D+ Max Load Combination = 35.0 psf Allowable Stress Load Combinatons: (Section 2.4.0) pg 8 Note: Negative value = upward vertical force [Eq 1]D=15.0 psf [Eq 2]D+L=35.0 psf [Eq 3]D+(Lr or S or R)=22.0 psf [Eq 4]D+0.75L+0.75(Lr or S or r)=21.8 psf [Eq 5]D+(0.6*W or 0.7E)=19.2 psf [Eq 6a]D+0.75L+0.75(0.6W or 0.7E)+0.75(Lr or S or R)=33.2 psf [Eq 6b]D+0.75*L+0.75(0.7E)+0.75S = 20.3 psf D+0.75L+ [Eq 7]0.6D+0.6W= 29.2 psf [Eq 8]0.6D+0.7E = 12.0 psf CLIENT:at&t Mobility Rocky Mountain Region PROJECT:West Vail LTE 3C COL04066/COL09806 LTE 3C Prepared By: 2077 North Frontage Road Date:04/29/16 AEM Page 3 of 9 4/29 USGS–Provided Output 2077 North Frontage Road ASCE 7-10 Seismic Design Requirements - Equivalent Lateral Force Procedure SS =0.256 SMS =0.307 SDS =0.205 S1 =0.073 SM1 =0.124 SD1 =0.083 IBC Earthquake Loads REFERENCE 1 ASCE 7-05 Table 11.5-1 Site Classification Soil Site Class =C IBC/CBC Table 1613.5.2/1613A.5.2 Site Coefficients SS == 0.256 Mapped Spectral Accelerations: Short Period USGS Report S1 == 0.073 Mapped Sectral Accelerations: 1 sec Period USGS ReportFa == 1.2 Site Coefficient USGS Report Fv ==1.7 Site Coefficient USGS Report SMS =0.307 Max Spectral Accelerations: Short Periods USGS Report SM1 =0.124 Max Spectral Accelerations: 1sec Period USGS Report Design Spectral Response Acceleration Parameters SDS =0.205 5% Damped Spectral Acceleration: Short Period USGS Report SD1 =0.083 5% Damped Spectral Acceleration: 1 sec Period USGS Report SDC =C Seismic Design Category USGS Report IBC/CBC Table 1613.5.6(1) & 1613A.5.6(2) Equivalent Lateral Force Procedure T =Ct hnx =0.095 Fundamental Period ASCE 7-10 Eqn. 12.8-2 Ct =0.020 Period Parameter ASCE 7-10 Table 12.8-2 x = 0.750 Period Parameter ASCE 7-10 Table 12.8-2 hn =8.00 Structure Height R = 2.000 Response Modification Factor ASCE 7-10 Table 15.4-2 TL =16.000 Long-Period Transition Period ASCE 7-10 Figure 22-12 Cs = SDS/[R/I] =0.102 Seismic Response Coefficient ASCE 7-10 Eqn. 12.8-2 where; Cs >0.030 Lower Limit ASCE 7-10 Eqn. 15.4-1 Cs > 0.8 S1/[R/I] =0.029 Lower Limit for S1 > 0.6g ASCE 7-10 Eqn. 15.4-2 Cs < SD1/T[R/I] =0.434 Upper Limit for T <TL ASCE 7-10 Eqn. 12.8-3 Cs < SD1TL/T2[R/I] =73.068 Upper Limit for T > TL ASCE 7-10 Eqn. 12.8-4 Design Value Cs =0.102 W = 4.1 Weight of Structure (kips) V =CsW =0.417 Equivalent Seismic Base Shear (kips)ASCE 7-10 Eqn. 12.8-1 Fwind =4.08 Wind Base Shear (kips) : Lateral Wind Shear > Seismic Base Shear : Wind Controls Design CLIENT: PROJECT: 2077 North Frontage Road Date:04/29/16 at&t Mobility Rocky Mountain Region West Vail LTE 3C COL04066/COL09806 LTE 3C Prepared By:AEM Page 4 of 9 4/29 Page 5 of 9 4/29 Page 6 of 9 4/29 Page 7 of 9 4/29 Page 8 of 9 4/29 Page 9 of 9 4/29