Create New Inspection:
Project: Montaneros Breezeways 2016
Select options Create Go to Main Inspection Grid
1 +
1 +
1 +
Inspections
Checklist Edit Info Schedule Prerequisites Schedule Inspection
Planning Final (Planning Final (UninspectedUninspected))Inspector: Inspector: None ScheduledNone Scheduled
Info
Status Unscheduled
Requested Date 06/07/2016
Estimated Duration 1 Hour(s)
Permit Number B16-0205
Parcel
Checklist Edit Info Schedule Prerequisites Schedule Inspection
Minor Framing (Minor Framing (UninspectedUninspected))Inspector: Inspector: None ScheduledNone Scheduled
Info
Status Unscheduled
Requested Date 06/07/2016
Estimated Duration 1 Hour(s)
Permit Number B16-0205
Parcel
Checklist Edit Info Schedule Prerequisites Schedule Inspection
Building Final (Building Final (UninspectedUninspected))Inspector: Inspector: None ScheduledNone Scheduled
Info
Status Unscheduled
Requested Date 06/07/2016
Estimated Duration 1 Hour(s)
Permit Number B16-0205