Loading...
HomeMy WebLinkAboutB16-0251_B16-0251 inspection list_1478898011.pdfPERMITS MANAGEMENT Non-Designated Parcel Rec Fees will have to be manually calculated Create New Inspection:Select options Create Go to Main Inspection Grid 1 + 1 + Inspections Checklist Edit Info Schedule Prerequisites Schedule Inspection Mechanical Final (Mechanical Final (UninspectedUninspected))Inspector: Inspector: None ScheduledNone Scheduled Info Status Unscheduled Requested Date Estimated Duration 1 Hour(s) Permit Number Not Issued Parcel Checklist Edit Info Schedule Prerequisites Schedule Inspection Rough Mechanical (Rough Mechanical (UninspectedUninspected))Inspector: Inspector: None ScheduledNone Scheduled Info Status Unscheduled Requested Date Estimated Duration 1 Hour(s) Permit Number Not Issued Parcel