Loading...
HomeMy WebLinkAboutScope of Work_4.pdfDoubletree Conversion – Vail, Colorado Building Permit Application – Exterior Improvements Detailed Scope and Location of Work: Removal & replacement of balcony railings Removal & replacement of wood fascia Removal & partial replacement of roof gutters Removal & replacement of PTAC covers Removal & replacement of vestibule covering Removal & replacement of wood decking and railing Removal & replacement of building light fixtures (1 to 1) with code compliant models Removal & replacement of parking lot light fixtures with code compliant models Removal & replacement of pool deck w/ amenities (i.e., trellis, fire pit, sidewalk, etc.) Removal & replacement of concrete retaining walls with boulder type walls and plantings Removal of identified substandard or dead landscaping and replacement with native species (1 to 1) Removal & infill of two (2) windows at Ski Storage Removal of concrete staircase from pool deck to roof, patch Addition of mechanical roof screen at roof above Meeting Room to screen view from pool deck Addition of twelve (12) trees per DRB request, placed per maximum screening effect Addition of small deck area on west side of Mi Casa restaurant Addition of dumpster and trash holding structure at end of service drive Aesthetic addition of faux stone chimney with application of new “Brand” signage on exterior elevation facing North Frontage Road façade per Sign permit as approved through DRB. Refurbishment of existing monument sign in median along North Frontage Road to new “Brand” identity per Sign Permit as approved through DRB. Aesthetic application of exterior material limited areas front, side and rear facades Aesthetic application of wooden bracketry at roof ends Restoration of existing finishes to remain, application of new surface finishes all facades Installation of screening fence(s) at ground-mounted equipment locations