Loading...
HomeMy WebLinkAboutB16-0257_P2.0_1478908792.pdfSHEET DETAIL NOTES: CONNECT 3 4" G TO FP-1. PROVIDE SHUTOFF VALVE AND UNION. IF GAS LOAD EXCEEDS 32 MBH CONTACT ENGINEER. CONNECT 3 4" G TO FP-2. PROVIDE SHUTOFF VALVE AND UNION. IF GAS LOAD EXCEEDS 26 MBH CONTACT ENGINEER. CONNECT 1" G TO R-1. PROVIDE SHUTOFF VALVE AND UNION. IF GAS LOAD EXCEEDS 45 MBH CONTACT ENGINEER. GAS METER BY LOCAL GAS COMPANY. SEE GAS SCHEDULE ON P1.0 FOR TOTAL LOAD. CONFIRM GAS APPLIANCE LOADS PRIOR TO INSTALLATION OF GAS METER & REGULATORS. GENERAL NOTES: 1. OFFSET PIPING AS REQUIRED TO AVOID ALL DUCTWORK, LIGHTS, AND STRUCTURE. COORDINATE ALL STRUCTURAL PENETRATIONS WITH THE STRUCTURAL ENGINEER. 2. ALL PIPING PASSING THROUGH FIRE-RATED ASSEMBLIES SHALL INCLUDE A FIRE-RATED PIPE SEALANT RATED TO MATCH THAT OF THE ASSEMBLY. 1 2 FP-1 1 R-1 3 FP-2 2 M ROUTE 3 4" G DOWN ROUTE 3 4" G UP 1" G 11 4" G GAS LINE MUST EXIT BUILDING ABOVE GRADE PER IFGC SECTION 404.6 11 4" G UNDERGROUND ROUTE 11 4" G LINE UNDERGROUND TO NEW METER LOCATION WEST OF BUILDING. TOTAL COMBINED LENGTH NOT TO EXCEED 165FT. VERIFY LOCATION IN FIELD. 3 4 11 4" G UNDERGROUND 4 of www.aec-vail.com aPO Box 8489, 40801 US Hwy 6 & 24, Ste 214, Avon, Colorado, 81620 Mechanical, Electrical & Lighting Design Services Architectural Engineering Consultants Telephone: 970-748-8520 c eDrawn By: Checked By: DATE: ISSUE: 06-14-16 PROGRESS AEC PROJECT #: McADAM REMODEL 1370 SANDSTONE DR UNIT #7 VAIL, CO 81658 16023 An Office with LEED™ Accredited Professionals 06-24-16 PERMIT %92 61% /#+0  722'4 .'8'. )#5 2.#0 5%#.'   žÄ 2   NORTH UPPER LEVEL GAS PLAN SCALE: 1/4" = 1'0" NORTH MAIN LEVEL GAS PLAN SCALE: 1/4" = 1'0" 07/27/16