HomeMy WebLinkAboutB16-0257_P2.0_1478908792.pdfSHEET DETAIL NOTES:
CONNECT 3
4" G TO FP-1. PROVIDE SHUTOFF VALVE AND UNION. IF GAS
LOAD EXCEEDS 32 MBH CONTACT ENGINEER.
CONNECT 3
4" G TO FP-2. PROVIDE SHUTOFF VALVE AND UNION. IF GAS
LOAD EXCEEDS 26 MBH CONTACT ENGINEER.
CONNECT 1" G TO R-1. PROVIDE SHUTOFF VALVE AND UNION. IF
GAS LOAD EXCEEDS 45 MBH CONTACT ENGINEER.
GAS METER BY LOCAL GAS COMPANY. SEE GAS SCHEDULE ON P1.0
FOR TOTAL LOAD. CONFIRM GAS APPLIANCE LOADS PRIOR TO
INSTALLATION OF GAS METER & REGULATORS.
GENERAL NOTES:
1. OFFSET PIPING AS REQUIRED TO AVOID ALL DUCTWORK, LIGHTS, AND
STRUCTURE. COORDINATE ALL STRUCTURAL PENETRATIONS WITH THE
STRUCTURAL ENGINEER.
2. ALL PIPING PASSING THROUGH FIRE-RATED ASSEMBLIES SHALL INCLUDE
A FIRE-RATED PIPE SEALANT RATED TO MATCH THAT OF THE ASSEMBLY.
1
2
FP-1 1
R-1 3
FP-2 2
M
ROUTE 3
4" G DOWN
ROUTE 3
4" G UP
1" G
11
4" G
GAS LINE MUST EXIT BUILDING ABOVE
GRADE PER IFGC SECTION 404.6
11
4" G UNDERGROUND
ROUTE 11
4" G LINE UNDERGROUND TO
NEW METER LOCATION WEST OF
BUILDING. TOTAL COMBINED LENGTH
NOT TO EXCEED 165FT. VERIFY
LOCATION IN FIELD.
3
4
11
4" G UNDERGROUND
4
of www.aec-vail.com
aPO Box 8489, 40801 US Hwy 6 & 24, Ste 214, Avon, Colorado, 81620
Mechanical, Electrical & Lighting Design Services
Architectural Engineering Consultants
Telephone:
970-748-8520
c
eDrawn By: Checked By:
DATE: ISSUE:
06-14-16 PROGRESS
AEC PROJECT #: McADAM REMODEL
1370 SANDSTONE DR
UNIT #7 VAIL, CO 81658
16023
An Office with LEED™
Accredited
Professionals
06-24-16 PERMIT
%92 61%
/#+0
722'4 .'8'.
)#5 2.#0
5%#.' Ä
2
NORTH
UPPER LEVEL GAS PLAN
SCALE: 1/4" = 1'0"
NORTH
MAIN LEVEL GAS PLAN
SCALE: 1/4" = 1'0"
07/27/16