Loading...
HomeMy WebLinkAboutB16-0258_M-GR-001_1478899934.pdfA B B R E V I A T I O N S S Y M B O L S ( N O T A L L U S E D ) FITTINGS VALVES MISCELLANEOUS CAPPED OUTLET - SCREWED CAPPED OUTLET - FLANGED CAPPED OUTLET - WELDED CONCENTRIC REDUCER FLOW ORIFICE NEW CONNECTION NEW CONNECTION - ANGLED NEW CONNECTION - INSERTION PIPING CONNECTION - BOTTOM PIPING CONNECTION - DOWN PIPING CONNECTION - UP UNION STRAINER BALL JOINT EXPANSION JOINT EXPANSION LOOP F FILTER - IN LINE 3-WAY AUTOMATIC CONTROL VALVE ALARM CHECK VALVE ANGLE VALVE AUTOMATIC BALL DRIP VALVE PNEUMATIC AUTOMATIC CONTROL VALVE BALANCING VALVE BALL VALVE BUTTERFLY VALVE CHECK VALVE GATE VALVE CURB VALVE DIAPHRAGM VALVE DRY PIPE VALVE M ELECTRIC MOTORIZED VALVE OPERATOR FLOAT VALVE FLOW CONTROL VALVE GLOBE VALVE LOCK SHIELD VALVE M ELECTRIC MOTORIZED VALVE NEEDLE VALVE OS&Y VALVE OS&Y VALVE WITH TAMPER SWITCH PEG VALVE PLUG VALVE P PNEUMATIC MOTORIZED VALVE OPERATOR POST INDICATOR PRE-ACTION VALVE PRESSURE REDUCING VALVE QUICK CLOSING VALVE QUICK OPENING VALVE R RELIEF VALVE S SAFETY VALVE S SOLENOID VALVE S SILENT CHECK VALVE STOP CHECK VALVE VALVE IN VERTICAL AIR VENT (AUTOMATIC) AIR VENT (MANUAL) A AQUASTAT BFP BACK FLOW PREVENTER BASKET STRAINER CIRCULATOR PUMP CV CONTROL VALVE STATION DUPLEX BASKET STRAINER FILTER FS FLOW SWITCH FLOW METER HD HEAT DETECTOR H HUMIDIFIER H HUMIDISTAT PIPE ALIGNMENT GUIDE PIPE ANCHOR ? L/M/H PRESSURE DRIP ASSEMBLY PSD PUMP SUCTION DIFFUSER PRESSURE GAUGE PRV PRESSURE REDUCING VALVE STATION P PRESSURE SENSOR PS PRESSURE SWITCH REFRIGERANT SIGHT GLASS SD SMOKE DETECTOR S SEPARATOR TT TEMPERATURE TRANSMITTER THERMOMETER GAUGE T THERMOSTAT TRAP VIBRATION ISOLATOR IN HANGER BACK DRAFT DAMPER ELECTRICAL DAMPER AUTOMATIC DAMPER (PNEUMATIC) VOLUME DAMPER BDD DAMPERS SUPPLY SUPPLY WITH NECK SUPPLY WITH BLANKING PLATE SUPPLY ROUND SUPPLY ROUND WITH BLANKING PLATE RETURN\EXHAUST WITH BLANKING PLATE RETURN\EXHAUST ROUND RETURN\EXHAUST WITH NECK RETURN DIFFUSERS FIRE DAMPER AND ACCESS DOOR AUTOMATIC DAMPER (MOTORIZED) M COMBINATION FIRE SMOKE DAMPER RISE IN DUCTWORK (IN DIRECTION OF AIR FLOW) DROP IN DUCTWORK (IN DIRECTION OF AIR FLOW) R D LOUVER IN DOOR, MINIMUM 1.0 SQUARE FOOT FREE AREA L UNDERCUT DOOR UC 1.0 SQ. F.A. POINT OF CONNECTION POINT OF DISCONNECTION STEEL CUT CLD-B 400 CFM. 12x12 CD 400 CFM. CLD-A 400 CFM. 300 CFM. 10x8 CR (CG) 10"x6" TOP REGISTER 150 CFM. SUPPLY AIR 150 CFM. 10x6 TR 10"x6" TOP REGISTER (TOP GRILLE) 150 CFM. SUPPLY AIR 150 CFM. 10x6 TR (TG) 10"x6" BOTTOM REGISTER (BOTTOM GRILLE) 150 CFM. SUPPLY AIR 10x6 BOTR (BOTG) 150 CFM. REMOVE EXISTING PIPING EXISTING PIPING ABANDON EXISTING PIPING HEAT TRACING ON PIPE FLEXIBLE HOSE ECCENTRIC REDUCER THERMOMETER AND WELL SYPHON THERMOMETER WELL 12"x12" NECK, 400 CFM SUPPLY AIR RECTANGULAR CEILING DIFFUSER WITH TYPA ACEILING DIFFUSER 400 CFM. SUPPLY AIR 400 CFM. SUPPLY AIR TYPA B ROUND DIFFUSER 10"x8" CEILING REGISTER (CEILING GRILLE) 300 CFM. RETURN AIR DASHED BOLD LINE WEIGHT ON DEMO PLAN INDICATES EQUIPMENT ABBREVIATION (SEE ABBREVIATION LIST) EQUIPMENT SCHEDULE NUMBER NORTH ARROW LETTER ELEVATION IS DRAWN SECTION OR ELEVATION IDENTIFICATION DRAWING ON WHICH DETAIL IS DRAWN DETAIL IDENTIFICATION NUMBER DRAWING ON WHICH SECTION OR LIGHT LINE WEIGHT INDICATES EXISTING WORK SECTION OR DETAIL IDENTIFICATION BOLD LINE WEIGHT INDICATES NEW WORK MATCHLINE REVISION REVISION CLOUD DRAWING REFERENCE NOTE GENERAL ID ID M-7 A LABEL LABEL LABEL LABEL ID FLEXIBLE PIPE CONNECTION HOSE CONNECTION CARBON DIOXIDE SENSOR CO2 WORK TO BE REMOVED TRASNSITION FITTING FD CFSD EXHAUST COMBINATION SHUT-OFF BALANCING VALVE RETURN\EXHAUST ROUND WITH BLANKING PLATE SHEET DESCRIPTION M E C H A N I C A L S H E E T I N D E X SCALE M-GR-001 MECHANICAL SYMBOLS, ABBREVIATIONS AND NOTES NTS M-GR-002 MECHANICAL SPEC AND SCHEDULES NTS M-GR-003 MECHANICAL SPEC AND SCHEDULES NTS M-GR-100 LOWER LEVEL MECHANICAL OVERALL PLAN 1/16" = 1'-0" M-GR-100A LOWER LEVEL MECHANICAL FLOOR PLAN - AREA A 1/8" = 1'-0" M-GR-100B LOWER LEVEL MECHANICAL FLOOR PLAN - AREA B 1/8" = 1'-0" M-GR-100C LOWER LEVEL MECHANICAL FLOOR PLAN - AREA C 1/8" = 1'-0" M-GR-101 ENTRY LEVEL MECHANICAL OVERALL PLAN 1/16" = 1'-0" M-GR-101A ENTRY LEVEL MECHANICAL FLOOR PLAN - AREA A 1/8" = 1'-0" M-GR-101B ENTRY LEVEL MECHANICAL FLOOR PLAN - AREA B 1/8" = 1'-0" M-GR-101C ENTRY LEVEL MECHANICAL FLOOR PLAN - AREA C 1/8" = 1'-0" M-GR-102 SECOND LEVEL MECHANICAL OVERALL PLAN 1/16" = 1'-0" M-GR-102A SECOND LEVEL MECHANICAL FLOOR PLAN - AREA A 1/8" = 1'-0" M-GR-102B SECOND LEVEL MECHANICAL FLOOR PLAN - AREA B 1/8" = 1'-0" M-GR-102C SECOND LEVEL MECHANICAL FLOOR PLAN - AREA C 1/8" = 1'-0" M-GR-103 THIRD LEVEL MECHANICAL OVERALL PLAN 1/16" = 1'-0" M-GR-103A THIRD LEVEL MECHANICAL FLOOR PLAN - AREA A 1/8" = 1'-0" M-GR-103B THIRD LEVEL MECHANICAL FLOOR PLAN - AREA B 1/8" = 1'-0" M-GR-103C THIRD LEVEL MECHANICAL FLOOR PLAN - AREA C 1/8" = 1'-0" M-GR-104 FOURTH LEVEL MECHANICAL OVERALL PLAN 1/16" = 1'-0" M-GR-104A FOURTH LEVEL MECHANICAL FLOOR PLAN - AREA A 1/8" = 1'-0" M-GR-104B FOURTH LEVEL MECHANICAL FLOOR PLAN - AREA B 1/8" = 1'-0" M-GR-104C FOURTH LEVEL MECHANICAL FLOOR PLAN - AREA C 1/8" = 1'-0" M-GR-411 ENLARGED MECHANICAL PLANS 1K AND 1QQ 1/4" = 1'-0" M-GR-412 ENLARGED MECHANICAL PLANS 2K AND 2AK 1/4" = 1'-0" M-GR-413 ENLARGED MECHANICAL PLANS 3K, 3AK AND 3BK 1/4" = 1'-0" M-GR-414 ENLARGED MECHANICAL PLANS 3CK, 3DK AND 3EKADA 1/4" = 1'-0" MECHANICAL SYMBOLS ABBREVIATIONS AND NOTES M-GR-001 HVAC GENERAL DEMOLITION NOTES 1. COMPLETED INSTALLATIONS SHALL CONFORM TO ALL APPLICABLE FEDERAL CODES, STATE AND LOCAL ORDINANCES AND THE SPECIFICATIONS. IF ANY CONFLICTS OCCUR, THE MOST STRINGENT SHALL APPLY. 2. PIPING AND DUCT LAYOUT IS ONLY SCHEMATIC, EXACT LOCATION OF PIPES AND DUCTS SHALL BE COORDINATED WITH BUILDING STRUCTURE, AND WORK OF OTHER CONTRACTORS PRIOR TO START OF ANY CONSTRUCTION OR DEMOLITION. 3. EXISTING WORK SHOWN ON PLANS IS FROM PREVIOUS ENGINEERING DOCUMENTS AND FIELD OBSERVATION. ACTUAL CONDITIONS MAY VARY, AND CONTRACTOR MUST FIELD VERIFY EXISTING WORK. MAKE MINOR ADJUSTMENTS NECESSARY TO COMPLETE WORK. IF EXISTING CONDITIONS PROHIBIT WORK, NOTIFY THE ARCHITECT FOR REDIRECTION AS REQUIRED. 4. THE CONTRACTOR IS RESPONSIBLE FOR ALL WARRANTIES ON THE EQUIPMENT INSTALLED. 5. INSURE THE EXECUTION OF ALL WARRANTIES FOR EQUIPMENT AND INSTALLATION AS PRESCRIBED BY THE OWNER. 6. ALL DUCTS AND PIPES ARE ABOVE CEILING AND TIGHT TO BOTTOM OF STRUCTURE UNLESS OTHERWISE NOTED. 7. ELEVATIONS, WHERE SHOWN, ARE CENTER OF PIPE AND BOTTOM OF DUCT UNLESS OTHERWISE NOTED. 8. COORDINATE SIZE AND LOCATION OF ALL RECESSES AND OPENINGS REQUIRED FOR HVAC WORK. 9. LOCATE ALL TEMPERATURE, PRESSURE AND FLOW MEASURING DEVICES IN ACCESSIBLE LOCATIONS WITH STRAIGHT SECTION OF PIPE OR DUCT UP OR DOWNSTREAM AS RECOMMENDED BY THE MANUFACTURER FOR ACCURACY. 10. LOCATE ALL MECHANICAL EQUIPMENT FOR UNOBSTRUCTED ACCESS TO UNIT ACCESS PANELS, CONTROLS AND VALVING. 11. LOCATE ROOM THERMOSTATS, 4'-0" (CENTERLINE) ABOVE FINISHED FLOOR. NOTIFY ARCHITECT WHERE DIMENSION CANNOT BE MAINTAINED OR WHERE THERE IS A QUESTION ON LOCATION. 12. VERIFY CONDITION OF ALL EXISTING LIFE SAFETY DEVICES (FIRE DAMPERS, DUCT DETECTORS, ETC.) WITHIN LIMITS OF CONSTRUCTION. REPAIR OR REPLACE IF FOUND TO BE DAMAGED OR NON-FUNCTIONAL. 13. PROVIDE ALL DUCTWORK TRANSITIONS TO ACCOMMODATE ALL FIRE, FIRE / SMOKE DAMPER, FANS, AIR HANDLING UNITS & TERMINAL BOXES. REFER TO MANUFACTURER'S DATA FOR EQUIPMENT CONNECTION SIZES. 14. LOCATIONS OF FIRE AND FIRE/SMOKE DAMPERS ARE PROVIDED AS REQUIRED FOR DUCTWORK LAYOUT SHOWN. PROVIDE ADDITIONAL DAMPERS AS REQUIRED BY GOVERNING AUTHORITY AND AS REQUIRED SHOULD DUCTWORK LAYOUT CHANGE AS A RESULT OF ACTUAL FIELD CONDITIONS. 15. CONTRACTOR SHALL COORDINATE THE ORDER IN WHICH EXISTING MECHANICAL EQUIPMENT IS REMOVED AND REPLACED WITH THE FACILITIES ENGINEERS. 16. WHEN ALL CONSTRUCTION IS COMPLETE, INSTALL NEW, CLEAN FILTERS IN AIR HANDLING UNITS SERVING THE RENOVATED AREAS. VERIFY CONDITION OF EXISTING FILTER GAUGES. REPAIR OR REPLACE IF FOUND TO BE DAMAGED OR NON-FUNCTIONAL. 17. COORDINATE EXISTING LOCATIONS OF DIFFUSERS, GRILLES, ETC. WITH REFLECTED CEILING GRID AND LIGHTING LAYOUT. 18. PRIOR TO ROUGH IN, COORDINATE THE INSTALLATION OF EQUIPMENT WITH THE MANUFACTURES' INSTALLATION AND MAINTENANCE REQUIREMENTS. 19. CONTRACTOR SHALL PROVIDE TEMPORARY COOLING AS REQUIRED DURING CONSTRUCTION TO MAINTAIN ACCEPTABLE COMFORT LEVELS. 1. DEMOLITION SHALL EXTEND TO POINTS OF CONNECTION WITH LIVE SERVICES, PANELBOARDS, OR OTHER APPLICABLE TERMINATION POINTS. DEMOLITION SHALL NOT PERMIT ABANDONMENT OF ANY SYSTEM OR A COMPONENT OF ANY SYSTEM, UNLESS SPECIFICALLY NOTED AS "ABANDON" OR "TO REMAIN". 2. DEMOLITION OF SYSTEMS SHALL INCLUDE UNITS, SUPPORT SYSTEMS, SYSTEM ACCESSORIES, SYSTEM CONTROLS, WIRING AND CONDUIT FOR POWER AND CONTROLS, ASSOCIATED PIPING, DUCTWORK, SUPPORTS, ETC. IN THEIR ENTIRETY, UNLESS SPECIFICALLY OTHERWISE NOTED. 3. ALL REMOVED EQUIPMENT SHALL BE MAINTAINED IN GOOD CONDITION. REMOVED EQUIPMENT NOT INDICATED FOR REUSE SHALL REMAIN THE PROPERTY OF THE OWNER. SHOULD THE OWNER DECLINE POSSESSION OF ANY EQUIPMENT, SAID EQUIPMENT SHALL BECOME THE PROPERTY OF THE CONTRACTOR. THE CONTRACTOR SHALL DELIVER ALL REMOVED EQUIPMENT TO THE OWNER. THE CONTRACTOR SHALL BE REQUIRED TO REMOVE ALL CONTRACTOR PROPERTY FROM THE SITE. 4. EXISTING INFORMATION SHOWN ON THE PLANS IS DERIVED FROM ORIGINAL DESIGN AND MODIFICATION PLANS FOR THE SITE MADE AVAILABLE TO THE ENGINEER. ADDITIONAL UNDOCUMENTED MODIFICATIONS HAVE BEEN MADE AT THE SITE. CONTRACTOR SHALL FIELD VERIFY EXACT LOCATION, ROUTING, AND SIZES OF EXISTING DUCTWORK AND PIPING TO REMAIN OR BE MODIFIED PRIOR TO BEGINNING ANY WORK. CONTRACTOR SHALL REPORT ANY MAJOR DISCREPANCIES TO THE ARCHITECT FOR RECOMMENDED ACTION. 1. RUN ALL DUCTS LEVEL UNLESS OTHERWISE NOTED. 2. DUCT SIZES SHOWN ON DRAWINGS ARE CLEAR INSIDE DIMENSIONS. INSTALLED DIMENSIONS SHALL NOT BE SMALLER. INTERNAL LINER, WHERE ALLOWED, SHALL NOT BE INSTALLED DOWNSTREAM OF FINAL FILTERS. 3. RUN OUT DUCT TO AIR DEVICES SHALL BE THE SAME SIZE AS THE AIR DEVICE NECK, UNLESS OTHERWISE NOTED. BALANCING DAMPERS ARE REQUIRED FOR ALL INDIVIDUAL DEVICE CONNECTIONS. BALANCE DAMPERS SHALL BE LOCATED AT THE ORIGIN OF THE INDIVIDUAL BRANCH CONNECTION. 4. FLEXIBLE RUNOUTS TO DIFFUSERS AND GRILLES TO BE MAXIMUM OF 5 FEET IN LENGTH. FLEX SHALL BE STRETCHED STRAIGHT WITHOUT SAGS. PROVIDE HANGER AT MID POINT. USE NYLON STRAP TO FASTEN INNER SLEEVE TO TAKE-OFF. DUCT TAPE IS NOT ACCEPTABLE. 5. DUCT TAPE IS NOT ACCEPTABLE FOR VAPOR BARRIER SEAMS. 6. OFFSET DUCTS INTO JOIST SPACE FOR CLEARANCE WHERE SPACE ABOVE CEILING IS NOT SUFFICIENT FOR DUCTS TO CROSS OTHER DUCTS OR WORK OF OTHER CONTRACTORS. 7. INSTALL BALANCING DAMPERS AS SHOWN AND AS REQUIRED FOR PROPER BALANCING OF AIR HANDLING SYSTEMS. 1. INSTALL CONTROL DEVICES AS REQUIRED ON ALL UNITS. VERIFY ALL EQUIPMENT IS FUNCTIONAL AND PROPER BALANCE IS ACHIEVED BEFORE COMPLETION. COORDINATE WITH OWNER'S REPRESENTATIVE ON EXISTING EQUIPMENT. 2. PROVIDE ALL CONTROLS AND CONTROLLERS, INCLUDING STARTERS AND CONTACTORS, NECESSARY FOR A COMPLETE AND OPERATIONAL HVAC SYSTEM. INCLUDE ALL ELECTRICAL WORK NECESSARY TO COMPLY WITH THIS REQUIREMENT. COORDINATE POWER SOURCE CONNECTIONS PRIOR TO ORDERING EQUIPMENT OR BEGINNING WORK. 3. COORDINATE THE VOLTAGE AND PHASE OF EACH PIECE OF EQUIPMENT WITH ALL TRADES BEFORE ORDERING. HVAC GENERAL NOTES GENERAL DUCTWORK CONTROLS ACTIVITY Draw Design Manager BY Check DATE KEY PLAN REVISIONS DESCRIPTION NO. FILE LOG STAMP RYAN TAYLOR SAM NAHAS SAM NAHAS JEFFERY MUSSER 5307 E. Mockingbird Lane, Suite 400 Dallas, TX 75206 USA Tel 214-526-1144 Fax 214-526-1411 Project No. © LEO A DALY Company 2016 OWNER: LAURUS CORPORATION 1880 CENTURY PARK EAST, SUITE 1016 LOS ANGELES, CA 90067 DEVELOPER: DESTINATION HOTELS &RESORTS 10333 EAST DRY CREEK ROAD, SUITE 450 ENGLEWOOD, CO 80112 VAIL CASCADE RESORT 1300 WESTHAVEN DRIVE VAIL, CO 81657 EST. 1915 P L A N N I N G A R C H I T E C T U R E E N G I N E E R I N G I N T E R I O R S 012-10378-000 JUNE 24, 2016 08/15/16