Loading...
HomeMy WebLinkAboutB16-0258_M-GR-002_1490730360.pdf ACTIVITY Draw Design Manager BY Check P L A N N I N G A R C H I T E C T U R E E N G I N E E R I N G I N T E R I O R S EST. 1915 DATE KEY PLAN REVISIONS DESCRIPTION NO. FILE LOG STAMP 2016 © LEO A DALY Company Project No. 012-10378-000 JUNE 24, 2016 5307 E. Mockingbird Lane, Suite 400 Dallas, TX 75206 USA Tel 214-526-1144 Fax 214-526-1411 RYAN TAYLOR SAM NAHAS SAM NAHAS JEFF MUSSER VAIL CASCADE RESORT 1300 WESTHAVEN DRIVE VAIL, CO 81657 OWNER: LAURUS CORPORATION 1880 CENTURY PARK EAST, SUITE 1016 LOS ANGELES, CA 90067 DEVELOPER: DESTINATION HOTELS &RESORTS 10333 EAST DRY CREEK ROAD, SUITE 450 ENGLEWOOD, CO 80112 MECHANICAL SPECS AND SCHEDULES M-GR-002 1.07 SUBMITTALS: 1. PROVIDE ELECTRONIC COPIES OF SUBMITTAL MATERIAL WITH DESCRIPTIVE DATA FOR ALL PRODUCTS, MATERIALS, AND EQUIPMENT, INCLUDING BUT NOT LIMITED TO THE EQUIPMENT LISTED IN THIS PARAGRAPH. CATALOG DATA SHALL BE MARKED TO INDICATE MATERIAL, SIZE, OPTIONS, PERFORMANCE CHARTS AND CURVES, ETC. IN SUFFICIENT DETAIL TO DEMONSTRATE COMPLIANCE WITH CONTRACT REQUIREMENTS. DATA SHALL INCLUDE THE MANUFACTURER'S RECOMMENDED INSTALLATION INSTRUCTIONS AND PROCEDURES. PROVIDE SUBMITTALS PRIOR TO THE PURCHASE AND INSTALLATION OF THE EQUIPMENT. ALLOW TEN (10) DAYS FOR ENGINEER TO REVIEW SUBMITTALS. A. COORDINATED LAYOUT PLANS, SHOWING WORK OF ALL TRADES, INCLUDING BUT NOT LIMITED TO DUCTWORK, PIPING, HVAC, PLUMBING, FIRE PROTECTION PIPING, IT LAYOUT, ELECTRICAL CONDUITS AND BUS DUCTS, AND EQUIPMENT. B. DUCTWORK ACCESSORIES. C. DUCTWORK TYPICAL CONSTRUCTION. D. DUCT SEALING. E. FLEXIBLE DUCTING. F. DAMPERS. G. INSULATION AND ACOUSTICAL LINING. H. HVAC CONTROLS COMPONENTS: GAGES, THERMOMETERS, ETC. I. ROOFTOP AIR CONDITIONING UNITS. J. CERTIFIED ACOUSTICAL TEST AND PERFORMANCE DATA FOR GRILLES, REGISTERS, DIFFUSERS, AIR TERMINAL UNITS, FANS, AND AIR HANDLING UNITS. K. AIR TEST AND BALANCE REPORTS. L. FANS, FAN CURVES. M. THERMOSTATS, LEAK DETECTORS AND ALL CONTROL DEVICES. N. VIBRATION ISOLATION O. MOTORS AND MOTOR CONTROLLERS. P. SIX (6) SETS OF AS-BUILT DRAWINGS AND CAD DVD. Q. ONE (1) SET OF CONTRACTOR REDLINES. R. CLOSE-OUT DOCUMENTATION IN A BINDER AND ELECTRONICALLY ON DVD OF ALL THE ABOVE INFORMATION. 2. CONTRACTOR AGREES THAT SUBMITTALS PROCESSED BY THE ENGINEER ARE NOT CHANGE ORDERS; THAT THE PURPOSE OF THE SUBMITTALS BY THE CONTRACTOR IS TO DEMONSTRATE TO THE ENGINEER THAT THE CONTRACTOR UNDERSTANDS THE DESIGN CONCEPT; AND THAT THIS UNDERSTANDING IS DEMONSTRATED BY INDICATING WHICH EQUIPMENT OR MATERIALS THE CONTRACTOR INTENDS TO FURNISH AND INSTALL AND THE FABRICATION AND INSTALLATION METHODS THE CONTRACTOR INTENDS TO USE. THE CONTRACTOR FURTHER AGREES THAT IF DEVIATIONS, DISCREPANCIES, OR CONFLICTS BETWEEN SUBMITTALS AND CONTRACT DOCUMENTS ARE DISCOVERED EITHER PRIOR TO OR AFTER SUBMITTALS ARE PROCESSED BY THE ENGINEER, THE CONTRACT DOCUMENTS SHALL CONTROL AND BE FOLLOWED. 3. SHOP DRAWINGS AND MANUFACTURER'S PRODUCT DATA SHALL DESCRIBE MATERIALS, FINISHES, CONSTRUCTION AND DETAILS OF EQUIPMENT, INCLUDING "UL APPROVAL", WHERE SPECIFIED. SUBMISSIONS SHALL INDICATE SPECIFIED DETAILS AND SHALL INCLUDE COMPLETE DIMENSIONAL DATA. COORDINATE SHOP DRAWINGS WITH THE OTHER TRADES BEFORE SUBMITTING FOR REVIEW. SHOP DRAWINGS SHALL REFLECT ALL VARIATIONS IN THE EQUIPMENT LAYOUT, ARRANGEMENT, AND INSTALLATION REQUIRED TO ADAPT TO THE JOB CONDITIONS. 1.08 COORDINATION 1. PRIOR TO BID, THE CONTRACTORS SHALL VISIT THE SITE AND IDENTIFY TO THE OWNER'S REPRESENTATIVE ANY ITEMS THAT MAY AFFECT THEIR BID. PRIOR TO THE INSTALLATION, FABRICATION, REMOVAL, OR RELOCATION OF ANY WORK, THE CONTRACTOR SHALL REVIEW THE ACTUAL CONDITIONS UNDER WHICH THE WORK IS TO BE PERFORMED AND SHALL FULLY COORDINATE ALL WORK WITH THE ARCHITECTURAL PLANS, BUILDING STRUCTURE, AND WORK OF OTHER TRADES. CONTRACTOR SHALL VERIFY EXISTING INVERTS AND ELEVATIONS PRIOR TO CONSTRUCTION. WHERE CONFLICTS OCCUR, OR IF CONNECTIONS THERETO CANNOT BE MADE, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE OWNER'S REPRESENTATIVE PRIOR TO MATERIAL FABRICATION OR INSTALLATION. 2. WHERE THE WORK OF VARIOUS TRADES WILL BE INSTALLED IN CLOSE PROXIMITY TO ONE ANOTHER OR WHERE THERE IS EVIDENCE THAT THE WORK OF ONE TRADE WILL INTERFERE WITH WORK OF OTHER TRADES, THE CONTRACTOR SHALL ASSIST IN WORKING OUT SPACE CONDITIONS TO MAKE A SATISFACTORY ADJUSTMENT. IF THE CONTRACTOR ALLOWS ONE TRADE TO INSTALL HIS WORK BEFORE COORDINATING WITH WORK OF OTHER TRADES, THE CONTRACTOR SHALL MAKE NECESSARY CHANGES TO CORRECT THE CONDITIONS IN SUCH A MANNER ACCEPTABLE TO ARCHITECT AND ENGINEER, AND BEAR THE COST OF SUCH CORRECTIONS. 3. THE CONTRACTOR SHALL LOCATE ALL EQUIPMENT WHICH MUST BE SERVICED, OPERATED, OR MAINTAINED IN A FULLY ACCESSIBLE POSITION. EQUIPMENT SHALL INCLUDE, BUT NOT BE LIMITED TO, CLEANOUTS, VALVES, TRAPS, MOTORS, CONTROLLERS, DRAIN PANS, ETC. IF REQUIRED FOR ACCESSIBILITY FURNISH ACCESS DOORS FOR THIS PURPOSE. MINOR DEVIATIONS FROM DRAWINGS MAY BE MADE TO ALLOW FOR IMPROVED ACCESSIBILITY, AND ANY CHANGE FOR THAT PURPOSE IS ACCEPTABLE 1.09 OPERATION AND MAINTENANCE (O&M) MANUALS 1. PROVIDE FOUR (4) COPIES OF OPERATION AND MAINTENANCE MANUALS FOR OWNER'S USE. O&M MANUALS SHALL BE ARRANGED IN THREE RING BINDERS AND SHALL LIST STEP-BY-STEP PROCEDURES REQUIRED FOR SYSTEM START-UP, OPERATION, ABNORMAL SHUTDOWN, EMERGENCY SHUTDOWN, AND NORMAL SHUTDOWN FOR EACH PIECE OF EQUIPMENT. INCLUDE THE FOLLOWING INFORMATION FOR EQUIPMENT ITEMS: A. MANUFACTURER'S NAME, MODEL NUMBER, SERVICE MANUAL, AND PARTS LIST. B. BRIEF DESCRIPTION OF THE EQUIPMENT AND BASIC OPERATING FUNCTIONS. C. COPY OF APPROVED SHOP DRAWING SUBMITTALS; EQUIPMENT, MATERIALS AND DRAWINGS. D. DESCRIPTION OF FUNCTION, NORMAL OPERATING CHARACTERISTICS AND LIMITATIONS, PERFORMANCE CURVES, ENGINEERING DATA (SPECIFIED CAPACITIES, I.E., SUBMITTAL DATA) AND TESTS (INCLUDING ASME VESSEL TEST REPORTS), AND COMPLETE NOMENCLATURE AND COMMERCIAL NUMBERS OF REPLACEMENT PARTS. E. MANUFACTURER'S PRINTED OPERATING PROCEDURES TO INCLUDE START-UP, BREAK-IN, AND ROUTINE AND NORMAL OPERATING INSTRUCTIONS; REGULATION, CONTROL, STOPPING, SHUTDOWN, AND EMERGENCY INSTRUCTIONS; AND SUMMER AND WINTER OPERATING INSTRUCTIONS. F. MANUFACTURER'S LIST OF RENEWAL PARTS FOR EACH ITEM, INCLUDING RECOMMENDED STOCK ITEMS AND RECOMMENDED QUANTITIES. INDICATE WHERE SPARE PARTS CAN BE ORDERED. G. CONTROL AND ELECTRICAL INTERLOCK DIAGRAMS, SEQUENCES OF OPERATIONS. H. MAINTENANCE PROCEDURES FOR ROUTINE PREVENTATIVE MAINTENANCE AND TROUBLESHOOTING; DISASSEMBLY, REPAIR, AND REASSEMBLY; ALIGNING AND ADJUSTING INSTRUCTIONS. I. SERVICING INSTRUCTIONS AND LUBRICATION CHARTS AND SCHEDULES. J. EXTENDED WARRANTIES FOR EQUIPMENT. 2. O&M MANUALS SHALL BE USED AS THE BASIS OF TRAINING OWNER'S OPERATIONS PERSONNEL AND SHALL BE ON SITE FOR USE DURING THE FINAL INSPECTION. O&M MANUALS SHALL BE REVIEWED AND APPROVED BY THE ENGINEER FOR CONTENT AND COMPLETENESS BEFORE FINAL PAYMENT. THE ENGINEER SHALL RETAIN ONE COPY OF APPROVED MAINTENANCE MANUAL IN PROJECT FILES. THREE COPIES SHALL BE DELIVERED TO THE OWNER. 2.00 MATERIALS 1. MATERIALS AND EQUIPMENT SHALL BE STANDARD PRODUCTS OF A MANUFACTURER REGULARLY ENGAGED IN THE MANUFACTURING OF SUCH PRODUCTS, WHICH ARE OF A SIMILAR MATERIAL, DESIGN, AND WORKMANSHIP. THE STANDARD PRODUCTS SHALL HAVE BEEN IN SATISFACTORY COMMERCIAL OR INDUSTRIAL USE FOR TWO (2) YEARS PRIOR TO THE BID OPENING DATE FOR THIS PROJECT. PRODUCTS SHALL BE SUPPORTED BY A SERVICE ORGANIZATION. SYSTEM COMPONENTS SHALL BE ENVIRONMENTALLY SUITABLE FOR THE INDICATED LOCATIONS AND OPERATIONS. 2. EQUIPMENT AND MATERIALS SHALL BE NEW, BEST OF THEIR RESPECTIVE KINDS, AND FREE FROM DEFECTS. WHERE INDICATED, PROVIDE EQUIPMENT WHICH IS LISTED BY UNDERWRITER'S LABORATORIES, INC., BEARING THE UL LABEL. 3. MATERIALS AND EQUIPMENT PROVIDED FOR SIMILAR APPLICATIONS SHALL BE OF THE SAME MANUFACTURER AND SHALL CONFORM TO THE REFERENCED STANDARDS. 2.01 VIBRATION ISOLATION 1. GENERAL A. INSTALL IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS. B. PROVIDE LEVELING DEVICES AND APPROVED RESILIENT RESTRAINING DEVICES AS REQUIRED TO LIMIT EQUIPMENT AND PIPING MOTION IN EXCESS OF 1/4 INCH. C. ACCEPTABLE MANUFACTURERS: 1) MASON INDUSTRIES, INC. 2) VIBRATION ELIMINATOR CO. 3) KORFUND DYNAMICS CORP. 2. CEILING HUNG EQUIPMENT: A. TYPE "H" COMBINATION SPRING/ELASTOMER 1) SIMILAR TO MASON TYPE 30N. 2) 1 INCH MINIMUM STATIC DEFLECTION, ½ INCH MINIMUM RESERVE DEFLECTION. FACTORY PRELOADED TO 75% OF RATED LOAD. 3) PROVIDE SUPPLEMENTAL STEEL AS REQUIRED WHERE EQUIPMENT OR STRUCTURE CANNOT SUPPORT POINT LOADS. 3. ELASTOMER MOUNTING TYPES: A. TYPE "D": DOUBLE DEFLECTING TYPE INCORPORATING THE FOLLOWING: 1) BOLT HOLES FOR BOLTING TO EQUIPMENT BASE. 2) BOTTOM STEEL PLATES FOR BOLTING TO SUB-BASE AS REQUIRED. 3) UNIT TYPE DESIGN MOLDED IN BLACK OIL-RESISTANT NEOPRENE. 4) NEOPRENE COMPOUND TO MEET FOLLOWING: a. NOT GREATER THAN 50 DUROMETER. b. MINIMUM TENSILE STRENGTH 2000 PSI. c. MINIMUM ELONGATION 300%. d. MAXIMUM COMPRESSION SET OF 25% OF ORIGINAL DEFLECTION. 5) SIMILAR TO MASON TYPE ND. 2.02 FIELD QUALITY CONTROL: 1. TESTS: A. PROVIDE MATERIALS, EQUIPMENT, LABOR AND POWER AS REQUIRED TO PERFORM TESTS PER APPROVED SCHEDULE AND PROJECT REQUIREMENTS. B. PIPING SYSTEMS: LESS THAN 100 PSIG OPERATING PRESSURE, TEST HYDROSTATICALLY TO 150 PSIG. OVER 100 PSIG OPERATING PRESSURE, TEST HYDROSTATICALLY TO 1½ TIMES OPERATING PRESSURE BUT NEVER EXCEED TEST PRESSURE AS PER ASME B16.1 BASIS. C. REPAIR OR REPLACE LEAKS AND DEFECTS AS DIRECTED WITHOUT ADDITIONAL COST. 10. REMOVAL AND RELOCATION OF EXISTING WORK: A. DISCONNECT, REMOVE, OR RELOCATE MATERIAL, EQUIPMENT, PLUMBING FIXTURES, PIPING, AND OTHER WORK NOTED AND REQUIRED BY REMOVAL OR CHANGES IN EXISTING CONSTRUCTION. B. WHERE EXISTING UTILITIES, PIPING, CONDUITS, AND/OR DUCTS, WHICH ARE TO REMAIN PREVENT INSTALLATION OF NEW WORK AS INDICATED, RELOCATE, OR ARRANGE FOR RELOCATION OF EXISTING PIPES, CONDUITS AND /OR DUCTS AS NECESSARY TO COMPLETE THE INSTALLATION. C. PROVIDE NEW MATERIALS AND EQUIPMENT, SUPPORTS, CURBS, ISOLATORS, ETC. AS MIGHT BE REQUIRED FOR RELOCATED EQUIPMENT. D. PLUG OR CAP ACTIVE PIPING AND DUCTWORK BEHIND OR BELOW FINISHED SURFACES. E. DO NOT LEAVE LONG DEAD END BRANCHES. CAP OR PLUG AS CLOSE AS POSSIBLE TO THE ACTIVE LINE. F. REMOVE UNUSED OR ABANDONED PIPING, DUCTWORK, AND MATERIAL AND PROPERLY DISPOSE OF ALL REMOVED FIXTURES AND EQUIPMENT AS DIRECTED. PROVIDE THE OWNER'S AGENT WITH PROPERLY EXECUTED DISPOSAL DOCUMENTATION FOR ITEMS WHICH REQUIRE ENVIRONMENTAL COMPLIANCE. 11. ACCESSIBILITY: A. INSTALLATIONS SHALL PROVIDE FOR OPERATION, MAINTENANCE, AND REPAIR OF EQUIPMENT. B. GROUP CONCEALED MECHANICAL EQUIPMENT REQUIRING ACCESS WITH EQUIPMENT FREELY ACCESSIBLE THROUGH ACCESS DOORS. 12. SPARE PARTS: THE CONTRACTOR SHALL SUBMIT SPARE PARTS DATA FOR EACH DIFFERENT ITEM OF EQUIPMENT SPECIFIED, AFTER APPROVAL OF THE SHOP DRAWING SUBMITTALS, AND NOT LATER THAN ONE MONTH BEFORE PROJECT COMPLETION. THE DATA SHALL INCLUDE A COMPLETE LIST OF PARTS AND SUPPLIES, WITH CURRENT UNIT PRICES AND SOURCES OF SUPPLY, A RECOMMENDED SPARE PARTS LIST FOR ONE (1) YEAR OF OPERATION, AND A LIST OF THE PARTS RECOMMENDED BY THE MANUFACTURER TO BE REPLACED ON A ROUTINE BASIS. 1.04 DELIVERY, STORAGE, AND HANDLING 1. DELIVER PRODUCTS TO THE PROJECT PROPERLY IDENTIFIED WITH NAMES, EQUIPMENT NUMBERS, MANUFACTURERS, MODEL NUMBERS, TYPES, GRADES, COMPLIANCE LABELS, AND OTHER INFORMATION NEEDED FOR IDENTIFICATION. A. HVAC TERMINAL UNITS SHALL BE SHIPPED AS A SINGLE PACKAGE ONLY, AND SHALL BE STORED AND HANDLED IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS. B. ALL EQUIPMENT SHALL BE SHIPPED IN SECTIONS TO PERMIT PASSAGE THROUGH AVAILABLE SPACES. 2. NOTIFY THE OWNER'S AGENT AND THE ENGINEER IN WRITING WITHIN FIVE (5) DAYS OF AWARD OF CONTRACT, OF THE PROPOSED DELIVERY SCHEDULE OF ANY EQUIPMENT OR MATERIALS THAT MAY PREVENT THE INSTALLATION FROM BEING COMPLETED BY THE PROJECT COMPLETION DATE. 3. STORED ITEMS SHALL BE PROTECTED FROM THE WEATHER, HUMIDITY, AND TEMPERATURE VARIATIONS, DIRT AND DUST, OR OTHER CONTAMINANTS. PROPER PROTECTION AND CARE OF ALL MATERIAL BEFORE AND DURING INSTALLATION SHALL BE THE CONTRACTOR'S RESPONSIBILITY. ANY MATERIALS FOUND TO BE DAMAGED SHALL BE REPLACED AT THE CONTRACTOR'S EXPENSE. DURING INSTALLATION, PIPING, DUCTWORK AND SIMILAR OPENINGS SHALL BE CAPPED TO KEEP OUT DIRT AND OTHER FOREIGN MATTER. 4. DO NOT INSTALL DAMAGED MATERIALS, APPARATUS AND EQUIPMENT. DAMAGED MATERIALS, APPARATUS, AND EQUIPMENT SHALL BE MARKED AS REJECTED MATERIALS AND PROMPTLY REMOVED FROM THE SITE. 5. AFTER EQUIPMENT HAS BEEN INSTALLED, COVER WITH A PROTECTIVE MATERIAL AND KEEP COVERED UNTIL ALL PAINTING AND INSULATING WORK HAS BEEN COMPLETED. THE SUBJECT EQUIPMENT SHALL NOT BE OPERATED WHILE IT HAS A PROTECTIVE COVERING. AT FINAL INSPECTION, ALL EQUIPMENT SHALL BE FREE OF STAINS, SCRATCHES AND FOREIGN DEBRIS. ALL EQUIPMENT FINISHES THAT DO NOT MEET THESE REQUIREMENTS SHALL BE SANDED, PRIMED AND PAINTED TO MATCH ORIGINAL PAINT FINISH. 1.05 WARRANTY AND SERVICE 1. WARRANTY: SUBMIT A SINGLE WRITTEN GUARANTEE STATING THAT ALL PORTIONS OF THE WORK ARE IN ACCORDANCE WITH THE CONTRACT REQUIREMENTS. GUARANTEE ALL WORK AGAINST FAULTY AND IMPROPER MATERIAL AND WORKMANSHIP FOR A PERIOD OF ONE (1) YEAR FROM THE DATE OF FINAL ACCEPTANCE BY THE OWNER, EXCEPT THAT WHERE EXTENDED GUARANTEES OR WARRANTIES FOR LONGER TERMS (SUCH AS REFRIGERATION COMPRESSORS, AND CONTROLS COMPONENTS) ARE SPECIFIED IN THE CONTRACT, OR ARE THE MANUFACTURER'S STANDARD OPTION, SUCH LONGER WARRANTIES SHALL APPLY. 2. REFER TO GENERAL CONDITIONS AND DIVISION 1, WARRANTIES AND BONDS. 3. WARRANTEE PERIOD SHALL START AFTER FINAL ACCEPTANCE OF MECHANICAL SYSTEMS BY THE OWNER OR ARCHITECT. 4. WHERE EXTENDED WARRANTIES ARE CALLED FOR HEREIN, FURNISH THREE COPIES TO BE INSERTED IN OPERATION AND MAINTENANCE MANUALS. 5. WARRANTY SERVICE: WARRANTY SERVICE TO CORRECT DEFICIENCIES SHALL BE SUPPLIED AT NO ADDITIONAL COST TO THE OWNER. WITHIN 24 HOURS AFTER NOTIFICATION, CORRECT ANY DEFICIENCIES WHICH OCCUR DURING THE GUARANTEE PERIOD, ALL TO THE SATISFACTION OF THE OWNER. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE CAUSED BY SUCH DEFICIENCIES AND SHALL REPAIR SUCH DAMAGE AND REIMBURSE THE OWNER FOR ALL COSTS INCURRED. 6. ALL PREVENTATIVE MAINTENANCE AND NORMAL SERVICE WILL BE PERFORMED BY THE OWNER'S MAINTENANCE PERSONNEL AFTER FINAL ACCEPTANCE OF THE WORK. THIS SHALL NOT ALTER THE CONTRACTOR'S WARRANTY OF THE WORK IN ANY WAY. 7. RECTIFICATION: AT NO ADDITIONAL COST TO THE OWNER, WITHIN 24 HOURS AFTER NOTIFICATION, CORRECT ANY DEFICIENCIES WHICH OCCUR DURING THE GUARANTEE PERIOD, ALL TO THE SATISFACTION OF THE OWNER. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE CAUSED BY SUCH DEFICIENCIES AND REPAIR THEREOF AND REIMBURSE THE OWNER FOR ALL COSTS INCURRED. 8. QUALITY ASSURANCE: A. NEW, BEST OF THEIR RESPECTIVE KINDS, FREE FROM DEFECTS, LISTED AND LABELED BY UNDERWRITERS' LABORATORIES, INC., OR BEARING THEIR LABEL. B. MATERIALS AND EQUIPMENT OF SIMILAR APPLICATION: SAME MANUFACTURE, EXCEPT AS NOTED. C. CONFORM TO REFERENCE STANDARDS. 1.06 INTERPRETATION OF DRAWINGS AND SPECIFICATIONS 1. IT IS THE INTENT OF THESE SPECIFICATIONS AND THE CONTRACT DRAWINGS TO PROVIDE A COMPLETE AND WORKABLE FACILITY. BOTH OF THE DRAWINGS AND THE SPECIFICATIONS SHALL BE CONSIDERED AS SUPPLEMENTAL TO ONE ANOTHER, SO THAT MATERIALS AND LABOR REQUIRED BY ONE BUT NOT THE OTHER, SHALL BE SUPPLIED AND INSTALLED, AS THOUGH SPECIFICALLY CALLED FOR BY BOTH. IN ADDITION, THE CONTRACTOR SHALL PROVIDE ALL INCIDENTAL ITEMS NOT SHOWN OR SPECIFIED, BUT NECESSARY FOR THE COMPLETE INSTALLATION. 2. DESIGN DRAWINGS ARE DIAGRAMMATIC AND INDICATE THE GENERAL ARRANGEMENT OF MECHANICAL SYSTEMS AND WORK. THE DRAWINGS DO NOT SHOW ALL NECESSARY OFFSETS, BENDS, ELBOWS, OR OTHER SPECIFIC ELEMENTS WHICH MAY BE REQUIRED FOR PROPER INSTALLATION OF THE WORK. SUCH WORK SHALL BE VERIFIED BY THE CONTRACTOR AT THE SITE. ESTABLISH ALL DIMENSIONS FROM ACTUAL MEASUREMENTS TAKEN IN THE FIELD. ADDITIONAL BENDS AND OFFSETS AS REQUIRED BY THE ACTUAL VERTICAL AND HORIZONTAL ALIGNMENT OF EQUIPMENT, STRUCTURAL ELEMENTS, OR OTHER JOB CONDITIONS SHALL BE PROVIDED TO COMPLETE THE WORK AT NO ADDITIONAL COST. 3. EXCEPT AS SHOWN IN DETAIL WITH DIMENSIONS, THE PHYSICAL DIMENSIONS OF EQUIPMENT AND THE LOCATIONS OF MECHANICAL EQUIPMENT, DUCTS, UTILITY PIPING, AND FITTINGS ARE ONLY APPROXIMATE; THE EXACT LOCATIONS SHALL BE DETERMINED IN THE FIELD FROM ACTUAL MEASUREMENTS, SUBJECT TO REVIEW AND APPROVAL IN ACCORDANCE WITH PARAGRAPH - SUBMITTALS, HEREIN. 4. SELECT AND INSTALL EQUIPMENT, WHICH WILL FIT INTO THE SPACE ALLOWED, INCLUDING SPACE FOR OPERATION AND MAINTENANCE. BEFORE ANY EQUIPMENT HAS BEEN PURCHASED, THOROUGHLY CHECK AND INVESTIGATE THE SPACE PROVIDED FOR THE RESPECTIVE EQUIPMENT AND ADVISE THE ENGINEER IMMEDIATELY OF ANY DISCREPANCY BEFORE PERFORMING THE WORK. 5. BEFORE INSTALLING ANY EQUIPMENT, THE CONTRACTOR SHALL INSTALL NECESSARY PLUMBING, PIPING, FITTINGS, SUPPORTS, PLENUMS, CASINGS AND DUCTWORK OF THE CORRECT SIZE, DIMENSIONS, AND SHAPE FOR THE EQUIPMENT ACTUALLY INSTALLED. PLUMBING, PIPING AND DUCT SIZES INDICATED SHALL BE TAKEN AS A MINIMUM AND SHALL NOT BE REDUCED WITHOUT APPROVAL FROM THE ENGINEER. 6. CERTAIN MOTOR CONTROL DEVICES TO BE FURNISHED UNDER DIVISION 23 ARE SHOWN ON THE ELECTRICAL DRAWINGS AND SHALL BE INSTALLED IN ACCORDANCE WITH AND UNDER THE REQUIREMENTS OF DIVISION 26, ELECTRICAL. THE CONTRACTOR SHALL CAREFULLY REVIEW THE ELECTRICAL DRAWINGS AND SPECIFICATIONS TO DETERMINE THE COMPLETE EXTENT AND RESPONSIBILITY FOR THIS WORK; INCLUDING PROVISION OF MATERIALS, EQUIPMENT, AND INSTALLATION LABOR, AS NECESSARY TO PROVIDE A COMPLETE AND WORKABLE FACILITY. 7. CERTAIN LOW VOLTAGE (120 VAC) ELECTRICAL CIRCUITS HAVE BEEN PROVIDED TO POWER AND OPERATE AUTOMATIC CONTROL SYSTEMS PROVIDED FOR MECHANICAL EQUIPMENT AND SYSTEMS. DIVISION 23 SHALL BE RESPONSIBLE TO PROVIDE ALL MATERIALS, EQUIPMENT, AND LABOR, AS NECESSARY TO EXTEND THIS CONTROL POWER TO ALL AUTOMATIC CONTROLS DEVICES AS REQUIRED TO PROVIDE A COMPLETE AND WORKABLE AUTOMATIC CONTROLS SYSTEM. THIS WORK SHALL ALSO INCLUDE THE PROVISION AND INSTALLATION OF ALL CONTROL POWER TRANSFORMERS AS MIGHT BE REQUIRED TO TRANSFORM THE CONTROL POWER TO THE ELECTRICAL CHARACTERISTICS AS REQUIRED BY THE INSTRUMENTATION AND CONTROLS DEVICES ACTUALLY INSTALLED. MATERIALS AND INSTALLATION SHALL BE IN ACCORDANCE WITH DIVISION 26, ELECTRICAL REQUIREMENTS. 8. SPECIFICATIONS ARE OF SIMPLIFIED FORM AND INCLUDE INCOMPLETE SENTENCES. WORDS OR PHRASES SUCH AS "THE CONTRACTOR SHALL", "SHALL BE", "FURNISH", "PROVIDE", "A", "AN", "THE", AND "ALL", HAVE BEEN OMITTED FOR BREVITY. 9. DEFINITIONS: A. "FURNISH" OR "PROVIDE": TO SUPPLY, INSTALL AND MAKE CONNECTIONS COMPLETE AND READY FOR SAFE AND BENEFICIAL USE. B. "INSTALL": TO ERECT, MOUNT, AND MAKE ALL CONNECTIONS COMPLETE WITH RELATED ACCESSORIES. C. "SUPPLY": TO PURCHASE, PROCURE, ACQUIRE, AND DELIVER COMPLETE WITH RELATED ACCESSORIES. D. "WORK": LABOR, MATERIALS, EQUIPMENT, APPARATUS, CONTROLS, ACCESSORIES, SERVICES, SUPERVISION AND OTHER ITEMS REQUIRED FOR PROPER AND COMPLETE INSTALLATION. E. "PIPING": PIPE, TUBE, FITTINGS, FLANGES, VALVES, CONTROLS, STRAINERS, HANGERS, SUPPORTS, UNIONS, TRAPS, DRAINS, INSULATION, TRIM, AND RELATED ITEMS. F. "DUCTWORK": SHEET METAL, REINFORCEMENT ANGLES, CLOSURES, FLANGES, FRAMES, GRILLES, REGISTERS, DIFFUSERS, DAMPERS, FILTERS, AND RELATED ITEMS. G. "WIRING": RACEWAY, FITTINGS, WIRE, BOXES, AND RELATED ITEMS. H. "CONCEALED": EMBEDDED IN MASONRY OR OTHER CONSTRUCTION, INSTALLED IN FURRED SPACES, WITHIN CRAWL SPACES, OR ENCLOSURES. I. "EXPOSED": NOT INSTALLED UNDERGROUND OR "CONCEALED" AS DEFINED ABOVE. J. "EQUIVALENT": EQUIVALENT IN MATERIALS, WEIGHT, SIZE, DESIGN, PERFORMANCE, UTILITY REQUIREMENTS, CAPACITY, AND EFFICIENCY AS THE SCHEDULED OR SPECIFIED "DESIGN BASIS" PRODUCT. 1.00 GENERAL PROVISIONS 1. GENERAL REQUIREMENTS: A. RELATED DOCUMENTS: APPLIANCE AND FIXTURE SPECIFICATION PACKAGE, GENERAL, SPECIAL AND SUPPLEMENTARY CONDITIONS, SHALL FORM A PART OF THESE SPECIFICATIONS. B. SCOPE OF WORK: PROVIDE ALL REQUIRED LABOR, MATERIALS, EQUIPMENT AND CONTRACTOR'S SERVICES NECESSARY FOR COMPETE AND SAFE INSTALLATION OF HEATING, VENTILATING, AIR CONDITIONING (HVAC) AND PLUMBING, WORK IN CONFORMITY WITH REQUIREMENTS OF ALL AUTHORITIES HAVE JURISDICTION; AS INDICATED ON DRAWINGS AND/OR HEREIN SPECIFIED OR DESCRIBED. C. SITE CLEANLINESS: KEEP SITE FREE FROM THIS SECTION'S SURPLUS MATERIAL, TOOLS AND RUBBISH AT ALL TIMES DURING CONSTRUCTION PERIOD AND, UPON COMPLETION, LEAVE SITE IN CLEAN CONDITION. D. SITE SECURITY: PROTECT THIS SECTION'S MATERIALS AND EQUIPMENT FROM ALL DAMAGE DUE TO FIRE, THEFT, VANDALISM, WEATHER, ETC. E. DAMAGE TO OTHER WORK: REPAIR ANY DAMAGE CAUSED BY THIS SECTION TO WORK OF OTHER SECTIONS. F. DAMAGE TO FIREPROOFING: REPAIR ANY DAMAGED FIREPROOFING CAUSED BY THIS SECTION TO INTEGRITY OF ORIGINAL CONSTRUCTION. G. SITE SAFETY: CONTRACTOR COVENANTS AND AGREES THAT HE AND HIS SUBCONTRACTORS AND HIS AND THEIR AGENTS, SERVANTS AND EMPLOYEES WILL PROVIDE AND MAINTAIN A SAFE PLACE TO WORK AND THAT HE AND THEY WILL COMPLY WITH ALL LAWS AND REGULATIONS OF ANY GOVERNMENTAL AUTHORITY HAVING JURISDICTION THEREOF, AND CONTRACTOR AGREES TO INDEMNIFY DEFEND AND HOLD HARMLESS, ENGINEER, OWNER AND ARCHITECT FROM AND AGAINST ANY LIABILITY, LOSS, DAMAGE OR EXPENSE, INCLUDING ATTORNEY'S FEES, ARISING FROM A FAILURE OR ALLEGED FAILURE ON THE PART OF CONTRACTOR, THIS SUBCONTRACTORS AND HIS AND THEIR AGENTS, SERVANTS AND EMPLOYEES TO PROVIDE AND MAINTAIN A SAFE PLACE TO WORK OR TO COMPLY WITH ALL LAWS AND REGULATIONS OF ANY GOVERNMENTAL AUTHORITY HAVING JURISDICTION THEREOF. H. VERIFICATION OF EXISTING: BEFORE SUBMITTING BID, CONTRACTOR SHALL VISIT THE SITE AND BECOME THOROUGHLY FAMILIAR WITH ACTUAL EXISTING CONDITIONS AND OF THE PRESENT INSTALLATIONS TO WHICH CONNECTIONS MUST BE MADE OR WHICH MUST BE CHANGED OR ALTERED. THE INTENT OF THE WORK IS SHOWN ON THE DRAWINGS AND DESCRIBED HEREIN, AND NO CONSIDERATION WILL BE GRANTED BY REASON OF LACK OF FAMILIARITY ON THE PART OF THE CONTRACTOR WITH ACTUAL PHYSICAL CONDITIONS, REQUIREMENTS, AND PRACTICES AT THE SITE. I. REQUIREMENTS OF OTHER SECTIONS: CAREFULLY CHECK THE DOCUMENTS OF OTHER SECTIONS TO ASCERTAIN THE REQUIREMENTS OF ANY INTERFACING MATERIALS OR EQUIPMENT BEING FURNISHED AND/OR INSTALLED BY THAT SECTION WHICH RELATE TO THIS SECTION, AND PROVIDE THE PROPER INSTALLATION AND/OR CONNECTION. J. INFORMATION TRANSFER: TRANSMIT ALL INFORMATION REQUIRED FOR WORK BEING PERFORMED BY OTHER SECTIONS IN AMPLE TIME FOR THE PROPER INSTALLATION AND CONNECTION, AND FOR THE PROVISION OF ALL OPENINGS REQUIRED IN FLOORS AND WALLS. K. HOLES AND STRUCTURE: FIELD DRILLING AND CUTTING OF HOLES IN BUILDING STRUCTURE REQUIRED FOR WORK UNDER THIS SECTION SHALL BE COORDINATED THROUGH THE GENERAL CONTRACTOR AND APPROVED BY OWNER AND BUILDING STRUCTURAL ENGINEER. ALL SUCH COORDINATION, DRILLING, CUTTING AND REINFORCING COSTS SHALL BE BORNE BY THIS CONTRACTOR. L. SLEEVES: FURNISH AND SET ALL SLEEVES FOR THE PASSAGE OF CONDUIT THROUGH WALLS, ROOF AND FLOORS AND ELSEWHERE AS WILL BE REQUIRED FOR THE PROPER PROTECTION OF EACH CONDUIT PASSING THROUGH BUILDING SURFACES. COORDINATE THIS WORK WITH THE GENERAL CONTRACTOR IN ORDER TO PROPERLY EXPEDITE AND PERFORM THIS WORK. M. PASSAGE OF EQUIPMENT: CHECK THE DIMENSIONAL REQUIREMENTS OF EQUIPMENT OF THIS SECTION TO ENSURE THAT SUCH EQUIPMENT CAN PASS THROUGH THE NECESSARY AREAS TO REACH ITS ULTIMATE INSTALLED LOCATION. INCLUDE IN BID COSTS FOR ALL WORK REQUIRED, INCLUDING ANY WORK REQUIRED TO MOVE THE EQUIPMENT THROUGH THE SITE TO THIS FINAL LOCATION, INCLUDING ANY DISMANTLING AND RE-ASSEMBLY. N. SIGNAGE: PROVIDE SIGNAGE REQUIRED BY CODES AND AUTHORITIES HAVING JURISDICTION. O. POTENTIAL DELIVERY PROBLEMS: NOTIFY THE GENERAL CONTRACTOR AND ENGINEER IN WRITING, WITHIN FIVE DAYS OF AWARD OF CONTRACT, OF THE PROPOSED DELIVERY SCHEDULE OF ANY EQUIPMENT OR MATERIAL THAT MAY PREVENT THE INSTALLATION FROM BEING COMPLETED BY THE PROJECT COMPLETION DATE. P. WARRANTY: SUBMIT A SINGLE GUARANTEE STATING THAT ALL PORTIONS OF THE WORK ARE IN ACCORDANCE WITH CONTRACT REQUIREMENTS. GUARANTEE ALL WORK AGAINST FAULTY AND IMPROPER MATERIAL AND WORKMANSHIP FOR A PERIOD OF ONE YEAR FROM DATE OF FINAL ACCEPTANCE BY OWNER, EXCEPT THAT WHERE GUARANTEES OR WARRANTIES FOR LONGER TERMS ARE SPECIFIED BY CONTRACT, SUCH LONGER TERM SHALL APPLY. Q. RECTIFICATION: AT NO ADDITIONAL COST TO THE OWNER, WITHIN 24 HOURS AFTER NOTIFICATION, CORRECT ANY DEFICIENCIES WHICH OCCUR DURING THE GUARANTEE PERIOD, ALL TO THE SATISFACTION OF THE OWNER. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE CAUSED BY SUCH DEFICIENCIES AND REPAIR THEREOF AND REIMBURSE THE OWNER FOR ALL COSTS INCURRED. 2. GENERAL ITEMS: A. PROVIDE CUTTING, PATCHING AND/OR CORE DRILLING OF EXISTING WALLS, FLOORS, OR STRUCTURAL MEMBERS AS REQUIRED FOR THE INSTALLATION OF NEW WORK. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING STRUCTURAL ENGINEER'S REVIEW AND APPROVAL AND INFORMING OWNER OR OWNER'S REPRESENTATIVE PRIOR TO PERFORMING THIS WORK. PRIOR TO CORE DRILLING, THE CONTRACTOR SHALL PERFORM X-RAY OF AREA TO BE PENETRATED TO VERIFY PENETRATIONS ARE FREE OF OBSTRUCTIONS IN SLAB. B. COORDINATE ALL NEW WORK WITH EXISTING INSTALLATIONS. C. CONTRACTOR SHALL INSPECT JOB SITE PRIOR TO BID AND VERIFY EXACT LOCATION, SIZE AND LOADING OF EXISTING PIPING PRIOR TO INSTALLATION AND CONNECTION OF ANY NEW HVAC HYDRONIC PIPING. D. DRAWINGS ARE DIAGRAMMATIC AND INDICATE GENERAL ARRANGEMENT OF SYSTEMS AND WORK. FOLLOW DRAWINGS IN LAYING OUT WORK AND CHECK DRAWINGS OF OTHER TRADES TO VERIFY SPACE CONDITIONS. MAINTAIN HEADROOM AND SPACE CONDITIONS. E. ALL WORK IN OTHER SPACES LOCATED BEYOND THE AREA OF WORK SHALL BE PERFORMED OUTSIDE REGULAR BUSINESS HOURS AND SHALL BE ACCOMPLISHED AS DIRECTED BY THE OWNERS REPRESENTATIVE. 1.01 REFERENCE STANDARDS 1. IN ADDITION TO COMPLYING WITH ALL OTHER LEGAL REQUIREMENTS, COMPLY WITH CURRENT PROVISIONS OF GOVERNING CODES AND REGULATIONS IN EFFECT DURING THE PROGRESS OF THE WORK, AND WITH THE FOLLOWING: 2. DRAWINGS AND SPECIFICATION REQUIREMENTS SHALL GOVERN WHERE THEY EXCEED CODE AND REGULATION REQUIREMENTS. 3. WHERE REQUIREMENTS BETWEEN GOVERNING CODES AND REGULATIONS VARY, THE MORE STRINGENT SHALL APPLY. 4. NOTHING CONTAINED IN CONTRACT DOCUMENTS SHALL BE CONSTRUED AS AUTHORITY OR PERMISSION TO DISREGARD OR VIOLATE LEGAL REQUIREMENTS. THE CONTRACTOR SHALL IMMEDIATELY DRAW THE ATTENTION OF THE ARCHITECT TO ANY SUCH CONFLICTS NOTED IN THE CONTRACT DOCUMENTS. 1.02 PERMITS , INSPECTIONS, APPROVALS, AND REQUIREMENTS 1. THE CONTRACTOR SHALL SECURE ALL APPROVALS AND PAY ALL FEES FOR ALL WORK INSTALLED. CERTIFICATE SHALL BE DELIVERED TO OWNER BEFORE FINAL PAYMENT WILL BE MADE. 2. DEFINITIONS: A. "FURNISH" OR "PROVIDE": TO SUPPLY, INSTALL AND CONNECT UP COMPLETEAND READY FOR SAFE AND REGULAR OPERATION OF PARTICULAR WORK REFERRED TO UNLESS SPECIFICALLY OTHERWISE NOTED. B. "INSTALL": TO ERECT, MOUNT AND CONNECT COMPLETE WITH RELATED ACCESSORIES. C. "SUPPLY": TO PURCHASE, PROCURE, ACQUIRE AND DELIVER COMPLETE WITH RELATED ACCESSORIES. D. "WORK": LABOR, MATERIALS, EQUIPMENT, APPARATUS, CONTROLS, ACCESSORIES AND OTHER ITEMS REQUIRED FOR PROPER AND COMPLETE INSTALLATION. E. "PIPING": PIPE, TUBE, FITTINGS, FLANGES, VALVES, CONTROLS, STRAINERS, HANGERS, SUPPORTS, UNIONS, TRAPS, DRAINS, INSULATION, AND RELATED ITEMS. F. "WIRING": RACEWAY, FITTINGS, WIRE, BOXES AND RELATED ITEMS. G. "CONCEALED": EMBEDDED IN MASONRY OR OTHER CONSTRUCTION, INSTALLED IN FURRED SPACES, WITHIN DOUBLE PARTITIONS OR HUNG CEILINGS, IN TRENCHES, IN CRAWL SPACES OR IN ENCLOSURES. H. "EXPOSED": NOT INSTALLED UNDERGROUND OR "CONCEALED" AS DEFINED ABOVE. I. "EQUIVALENT": EQUIVALENT IN MATERIALS, WEIGHT, SIZE, DESIGN AND EFFICIENCY OF SPECIFIED PRODUCT. J. SCOPE OF WORK: LABOR, MATERIALS, EQUIPMENT, SERVICES AND FEES NECESSARY FOR COMPLETE SAFE INSTALLATION IN CONFORMITY WITH APPLICABLE CODES AND AUTHORITIES HAVING JURISDICTION; AS INDICATED ON DRAWINGS AND HEREIN SPECIFIED 1.03 JOB CONDITIONS 1. SITE SAFETY: THE CONTRACTOR COVENANTS AND AGREES THAT HE AND HIS SUBCONTRACTORS AND HIS AND THEIR AGENTS AND EMPLOYEES SHALL PROVIDE AND MAINTAIN A SAFE PLACE TO WORK. THE CONTRACTOR SHALL COMPLY WITH ALL LAWS AND REGULATIONS OF ANY GOVERNMENTAL AUTHORITY HAVING JURISDICTION (AHJ). FURTHERMORE, THE CONTRACTOR AGREES TO INDEMNIFY, DEFEND, AND HOLD HARMLESS - THE ENGINEER, OWNER, AND ARCHITECT FROM AND AGAINST ANY AND ALL CLAIMS OF LIABILITY, LOSS, DAMAGE, OR EXPENSE, INCLUDING ATTORNEY'S FEES - ARISING FROM A FAILURE OR ALLEGED FAILURE ON THE PART OF THE CONTRACTOR, HIS SUBCONTRACTORS AND HIS AND THEIR AGENTS AND EMPLOYEES TO PROVIDE AND MAINTAIN A SAFE PLACE TO WORK; OR TO COMPLY WITH ALL LAWS AND REGULATIONS OF ANY GOVERNMENTAL AHJ, THEREOF. 2. SAFETY REQUIREMENTS: EXPOSED MOVING PARTS, PARTS THAT PRODUCE HIGH OPERATING TEMPERATURE, PARTS WHICH MAY BECOME ELECTRICALLY ENERGIZED, AND PARTS THAT MAY BE A HAZARD TO OPERATING PERSONNEL SHALL BE INSULATED, FULLY ENCLOSED, GUARDED, OR FITTED WITH OTHER TYPES OF SAFETY DEVICES. SAFETY DEVICES SHALL BE INSTALLED SO THAT PROPER OPERATION OF EQUIPMENT IS NOT IMPAIRED. WELDING AND CUTTING SAFETY REQUIREMENTS SHALL IN ACCORDANCE WITH AMERICAN WELDING SOCIETY AWS Z49.1 - "SAFETY IN WELDING, CUTTING, AND ALLIED PROCESSES". 3. SITE SECURITY: PROTECT MECHANICAL MATERIALS AND EQUIPMENT FROM ALL DAMAGE DUE TO FIRE, THEFT, VANDALISM, WEATHER, LOSS, ETC. 4. REPAIR ANY DAMAGE CAUSED TO THE WORK OF OTHER SECTIONS BY THE INSTALLATION OF THE MECHANICAL WORK. 5. FIREPROOFING: REPAIR ANY DAMAGED FIREPROOFING CAUSED BY THE INSTALLATION OF THE MECHANICAL WORK TO THE INTEGRITY OF THE ORIGINAL CONSTRUCTION. 6. SITE CLEANLINESS: KEEP SITE FREE FROM THE MECHANICAL WORK'S SURPLUS MATERIALS, TOOLS, AND RUBBISH AT ALL TIMES DURING THE CONSTRUCTION AND UPON COMPLETION, LEAVE THE SITE IN A CLEAN CONDITION. 7. INSTALL NEW WORK AND CONNECT TO EXISTING WORK WITH MINIMUM INTERFERENCE TO EXISTING FACILITIES. ALARM AND EMERGENCY SYSTEMS SHALL NOT BE INTERRUPTED. 8. MAINTAIN CONTINUOUS OPERATION OF EXISTING FACILITIES AS REQUIRED WITH THE NECESSARY TEMPORARY CONNECTIONS BETWEEN NEW AND EXISTING WORK. CONNECT NEW WORK TO EXISTING WORK IN A NEAT, WORKMANLIKE, AND ACCEPTABLE MANNER. RESTORE EXISTING WORK, WHICH HAS BEEN DISTURBED TO THE ORIGINAL CONDITION, INCLUDING MAINTENANCE OF WIRING CONTINUITY AS REQUIRED. 9. TEMPORARY SHUTDOWNS OF EXISTING SERVICES: A. AT NO ADDITIONAL CHARGES. B. AT TIMES NOT TO INTERFERE WITH NORMAL OPERATION OF EXISTING FACILITIES. C. ONLY WITH WRITTEN CONSENT OF THE OWNER. FLEXIBLE DUCT 6 INCHES 8 INCHES 12 INCHES 125 250 500 1000 2000 4000 8000 13 22 5 10 18 22 20 22 17 9 4 10 18 22 22 15 7 3 8 16 22 INNER DIAMETER 2.03 DUCTWORK 1. GENERAL: PROVIDE ALL MATERIALS, INSTALLATION, FIRE CONTAINMENT INSULATION, DUCTS, DAMPERS, ACCESS DOORS, JOINTS, HANGERS, SUPPORTS, STIFFENERS, SMOKE DAMPERS, FIRE DAMPERS, AND FIRE RETARDING MATERIALS, IN ACCORDANCE WITH THE REQUIREMENTS OF SMACNA - "HVAC DUCT CONSTRUCTION STANDARDS", LATEST EDITION, (REFERED TO HEREIN AS THE "DUCT MANUAL") AND ALL AUTHORITIES HAVING JURISDICTION (AHJ). ALL SHEET METAL WORK SHALL HAVE A PRESSURE CLASSIFICATION AS FOLLOWS: A. SUPPLY DUCTS - 3 INCHES WATER GAUGE. B. OUTSIDE AIR DUCTS - 2 INCHES WATER GAUGE. SEAL DUCTWORK SEAMS AND JOINTS "AIR-TIGHT" IN ACCORDANCE WITH SMACNA CLASS "A" CONSTRUCTION. SEAL AROUND ALL SCREWS. 2. MATERIALS: COLD ROLLED "COMMERCIAL" QUALITY, HOT-DIPPED GALVANIZED STEEL IN ACCORDANCE WITH ASTM A653. A. DIMENSIONS SHOWN ON THE DRAWINGS ARE CLEAR INSIDE DIMENSIONS. B. FITTINGS: SAME GAUGE AND CONSTRUCTION AS DUCTWORK. RADIUS ELBOWS SHALL HAVE A CENTERLINE RADIUS NOT LESS THAN 1.5 TIMES THE DUCT WIDTH. SQUARE ELBOWS SHALL BE FITTED WITH TURNING VANES. C. DUCT SUPPORTS SHALL BE PROVIDED IN ACCORDANCE WITH THE SMACNA DUCT MANUAL. D. TRANSVERSE AND LONGITUDINAL BRACING FOR DUCTWORK SHALL BE PROVIDED IN ACCORDANCE WITH THE SMACNA DUCT MANUAL. 3. DAMPERS: DAMPERS SHALL BE COMMERCIAL PRODUCTS OF A MANUFACTURER REGULARLY INVOLVED IN THE MANUFACTURE OF AIR DISTRIBUTION DEVICES. DAMPERS SHALL BE FABRICATED OF HEAVY GAUGE GALVANIZED STEEL OR ALUMINUM AND SHALL MEET THE REQUIREMENTS OF THE SMACNA DUCT MANUAL. FURNISH ALL DAMPERS NECESSARY FOR THE PROPER CONTROL AND BALANCING OF AIR DISTRIBUTION AS FOLLOWS: A. ALL DUCTS WHICH SPLIT IN TWO OR MORE BRANCHES TO SERVE SUPPLY DIFFUSERS. B. AT EACH SUPPLY BRANCH DUCT, AT THE BRANCH DUCT CONNECTION. C. DAMPERS SHALL BE ACCESSIBLE AND ADJUSTABLE. D. ADDITIONALLY, AS INDICATED ON THE PROJECT DRAWINGS. 4. TURNING VANES: GALVANIZED STEEL, DOUBLE-THICKNESS TYPE WITH 2-INCH INSIDE RADIUS FOR ALL SQUARE ELBOWS, UNLESS OTHERWISE NOTED. 5. FLEXIBLE DUCTWORK: A. THE FLEXIBLE DUCT FOR CONNECTION OF CEILING AIR DIFFUSERS TO SHEET METAL DUCT SHALL BE A FACTORY FABRICATED ASSEMBLY CONSISTING OF AN INNER SLEEVE, INSULATION AND AN OUTER MOISTURE BARRIER. THE INNER SLEEVE SHALL BE CONSTRUCTED OF AN ELASTOMERIC COMPOUND REINFORCED WITH WOVEN FIBERGLASS BANDED TO A VINYL COATED SPRING STEEL WIRE SUPPORTING HELIX. A MINIMUM 1 INCH THICK FIBERGLASS INSULATING BLANKET SHALL ENCASE THE INNER SLEEVE AND BE SHEATHED WITH AN OUTER MOISTURE BARRIER OF A REINFORCED METALIZED MYLAR/NEOPRENE LAMINATE, OR EQUAL. B. ACOUSTICAL PERFORMANCE OF THE FLEXIBLE DUCT SHALL BE IN ACCORDANCE WITH AIR DIFFUSION COUNCIL FLEXIBLE AIR DUCT TEST FD72R1: PARAGRAPH 3.2.1, SOUND ATTENUATION. THE TEST DATA SHALL BE MADE BY AN ACCREDITED INDEPENDENT TESTING LABORATORY IN ACCORDANCE WITH THE ABOVE TESTING PROCEDURE. C. THE SOUND ATTENUATION (INSERTION LOSS) OF THE FLEXIBLE DUCT SHALL MEET OR EXCEED THE VALUES TABULATED HEREIN: STRAIGHT DUCT INSERTION LOSS IN DECIBELS PER LENGTH OF 10 FEET WITH NO AIRFLOW FREQUENCY BANK - HERTZ D. CERTIFIED TEST DATA SHALL BE SUBMITTED FOR APPROVAL. E. INSTALLATION OF THE FLEXIBLE DUCT SHALL BE IN ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS AND RECOMMENDED PROCEDURES. F. FLEXIBLE DUCTWORK TO BE A MAXIMUM OF 6 FEET IN LENGTH. G. CONNECTIONS, AIRTIGHT JOINTS, FASTENED WITH CLAMPS (SIMILAR TO IDEAL 5200 OR 5600 SERIES) AND SEALED WITH SEALING COMPOUND AND TAPE. H. FLEXIBLE DUCT BENDS SHALL BE INSTALLED WITH CENTERLINE RADIUS NOT LESS THAT 1.5 TIMES DIAMETER AND SHALL NOT BE CRUSHED TO FIT LIMITED CLEARANCE. I. SUPPORT FLEXIBLE DUCT PER SMACNA STANDARDS. 6. ACCESS DOORS: A. FURNISH ACCESS DOOR OF SUFFICIENT SIZE AS REQUIRED, FOR ACCESS, INSPECTION, MAINTENANCE, AND REPLACEMENT TO ALL INSTRUMENTS, CONTROLS AND EQUIPMENT. B. INSULATED OR UNINSULATED, SAME AS DUCT. C. PROVIDE MINIMUM 20 INCHES BY 14 INCHES, EXCEPT DUCTS LESS THAN 16 INCHES; ONE DIMENSION 20 INCHES AND OTHER DIMENSION 2 INCHES LESS THAN DUCT WIDTH. 1) UNLESS OTHERWISE NOTED, ALL ACCESS DOORS TO BE HINGED TYPE, WITH LATCH SIMILAR TO VENTLOCK NO. 100. 03/28/17